ANALISIS FAKTOR-FAKTOR KETERLAMBATAN DISTRIBUSI MATERIAL PADA PROYEK KONSTRUKSI

  • Reegan Elvreda Kaffa
  • Ratri Andinisari ITN Malang

Abstract

Material distribution is a crucial activity in construction project execution, as it directly impacts the smooth flow of fieldwork. Delays in material distribution can disrupt project schedules, increase execution costs, and reduce work productivity. This study aims to identify the factors causing material distribution delays in the SPPG project in Ponorogo Regency and to determine the most dominant factor. A quantitative descriptive approach was employed, utilizing questionnaires distributed to respondents—including project managers, site engineers, supervisors, logistics staff, and other project personnel directly involved in material management. The research instrument was validated using the Pearson Product Moment validity test and the Cronbach's Alpha reliability test. Subsequently, the data were analyzed using the Relative Importance Index (RII) method. The results indicate that all indicators were valid, with calculated r-values ​​exceeding the critical r-table value (0.3388), and the instrument demonstrated very high reliability, with a Cronbach's Alpha value of 0.919. The RII analysis reveals that the most dominant factor causing material distribution delays was the unavailability of materials according to calculated requirements (RII = 0.900), followed by delays in material procurement (RII = 0.888) and discrepancies in the quantity of delivered materials (RII = 0.864).

Downloads

Download data is not yet available.
Published
2026-11-03