Pengembangan Dashboard Interaktif Microsoft Power BI untuk Monitoring Kinerja Proyek Menggunakan Earned Value Management

  • Isma Herdian Putra
  • Ratri Andinisari ITN Malang

Abstract

Project performance control requires information that can describe time and cost conditions in a timely and measurable manner. This study develops an interactive Microsoft Power BI dashboard based on Earned Value Management (EVM) to support performance monitoring of the Muhammadiyah Center Building Construction Project in Blitar Regency, particularly for structural works. A descriptive quantitative approach was employed using data consisting of the Budget Plan (RAB), working drawings, and project progress reports. Due to the limited availability of the baseline schedule and actual cost data, the planned schedule was reconstructed and Actual Cost (AC) was estimated. Performance evaluation was conducted using the parameters Planned Value (PV), Earned Value (EV), and Actual Cost (AC), along with the indicators SV, CV, SPI, CPI, and EAC. The analysis at week 24 resulted in an SPI of 1.04, indicating that project progress was ahead of the planned schedule, while a CPI of 0.99 indicated that cost efficiency was slightly below the ideal condition. The estimated final project cost based on EAC was IDR 8,297,650,960.00. The analysis results were then integrated into an interactive Microsoft Power BI dashboard that presents project performance information visually and in an integrated manner. The dashboard can assist users in monitoring time and cost conditions, identifying deviations, and obtaining supporting information for project control and decision-making.

Downloads

Download data is not yet available.
Published
2026-11-03