INTEGRASI BIM 4D DAN METODE FAST TRACK UNTUK PENGENDALIAN WAKTU PROYEK PEMBANGUNAN GEDUNG MUHAMMADIYAH CENTER KABUPATEN BLITAR

  • Muhamad Kurniawan Huda Febrian
  • Ratri Andinisari ITN Malang

Abstract

The Muhammadiyah Center Building construction project is a construction project with a high level of complexity, requiring effective time control to ensure that project implementation proceeds according to schedule. Conventional time control methods still have limitations in visualizing the relationship between the project schedule and work progress. Therefore, this study implements four-dimensional Building Information Modeling (4D BIM) integrated with the Fast Track method to support project time control through construction sequence visualization and schedule acceleration of critical activities. This study aims to analyze project scheduling using the Precedence Diagram Method (PDM), implement 4D BIM by integrating a three-dimensional model with the project schedule using Autodesk Revit and Autodesk Navisworks, and evaluate the effectiveness of the Fast Track method in improving project duration and progress. The Fast Track method was applied by modifying the dependency relationships of several activities on the critical path from Finish-to-Start (FS) to Start-to-Start (SS), allowing activities to be performed simultaneously (overlapping) without changing the project scope. The results indicate that the implementation of 4D BIM provides a clearer visualization of construction sequences, thereby facilitating project monitoring and time control. The application of the Fast Track method successfully reduced the project duration from 54 weeks to 48 weeks, resulting in a time reduction of 6 weeks or approximately 11.26%. In addition to shortening the project completion time, the 4D BIM simulation also demonstrated that the project progress under the Fast Track schedule was higher than that of the existing schedule during the observation period. Therefore, the integration of 4D BIM and the Fast Track method is considered effective in supporting time control for the Muhammadiyah Center Building construction project.

Downloads

Download data is not yet available.
Published
2026-11-03