IDENTIFIKASI WASTE DOMINAN PADA PROYEK PEMBANGUNAN PAGAR MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION DAN ANALISIS PARETO
Abstract
The construction industry is highly complex, making it prone to various forms of waste during project implementation. The presence of waste can lead to suboptimal use of resources, increased costs, and reduced work efficiency. One approach that can be used to identify and control waste in construction projects is Lean Construction, a construction management concept that focuses on increasing added value by reducing non-value-added activities. This study aims to identify the dominant types of waste occurring in a fence construction project using the Lean Construction approach and the Pareto analysis method. Waste was identified based on the eight types of waste in the Lean Construction concept: overproduction, overprocessing, non-utilized talent, waiting, transportation, motion, inventory, and defects. Research data were obtained by collecting assessment scores for waste factors that occurred during project execution; the data were then processed using percentage contribution and cumulative value analysis to determine the priority of dominant waste. The analysis results show that there are three types of waste that contribute the most to overall waste: overproduction (20.12%), overprocessing (18.34%), and non-utilized talent (17.16%). These three types of waste account for a cumulative 55.62%, making them priority factors that need to be controlled in order to improve project efficiency. Based on these results, the Lean Construction approach using Pareto analysis can be used as an initial identification method to determine where to focus improvement efforts on activities that have the potential to cause waste in construction projects.