Abstract
This planning aims to determine the maximum design flood discharge and to plan the safe dimensions of the embankment to control flooding at the location. The Bengawan Solo River plays an important role for the community, but its overflow often poses a flood threat, especially in Ngadirejo Village, Rengel District, Tuban Regency. The major flood that occurred in February 2025 resulted in inundation up to 0.5 – 0.7 meters deep, submerging more than 800 hectares of rice fields and disrupting road access and educational facilities. The planning methodology includes hydrological analysis using rainfall data from the Rengel, Maibit, and Klotok Stations for the period 2015 – 2024. The planned flood discharge analysis was calculated using the Nakayasu Synthetic Unit Hydrograph (HSS) method. Hydraulic analysis was conducted to evaluate the river cross-section capacity, and the stability of the embankment slope was tested using the Bishop method. The analysis results show the planned flood discharge using the Nakayasu Synthetic Unit Hydrograph (HSS) method, which are 9555 m³/second for a 2-year return period, 10965 m³/second for a 5-year return period, 12205 m³/second for a 10-year return period, and 13232 m³/second for a 25-year return period. Based on the flow profile simulation, several cross-section points were found to experience overflow at certain return period discharges. The mitigation planning was carried out by constructing a dam, where the stability test results using the Bishop method showed a factor of safety (FS) value > 1.25. Thus, the dam construction is declared safe and stable.