STRATEGI ANALISIS RISIKO WAKTU PROYEK KONSTRUKSI DENGAN METODE CPM DAN PERT PADA PROYEK INFRASTRUCTURE CAMP AND WORKSHOP FACILITY PT PETROSEA TBK SITE PT MULTI TAMBANGJAYA UTAMA
Abstract
The success of a construction project is highly dependent on effective schedule control, as project delays may lead to cost overruns, reduced productivity, and failure to achieve project objectives. This study aims to analyze schedule-related risks and evaluate project scheduling performance in the Infrastructure Camp and Workshop Facility Project of PT Petrosea Tbk at PT Multi Tambangjaya Utama Site using the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT). The CPM was employed to identify critical activities and determine the project's critical path, while the PERT method was used to analyze uncertainty in activity durations based on optimistic, most likely, and pessimistic time estimates. This research adopted a quantitative approach utilizing primary data obtained through field observations and interviews, as well as secondary data including the project schedule, S-curve, and project execution documents. The CPM analysis identified the critical path consisting of mobilization, site clearing, foundation works, steel structure erection, wall and roofing works, mechanical, electrical, and plumbing (MEP) installation, finishing works, and commissioning, resulting in a total project duration of 167 days. Furthermore, the PERT analysis estimated an expected project duration of 171.34 days, with a 96.6% probability of completing the project within the contractual target of 180 days. The dominant schedule risks identified include adverse weather conditions, material procurement delays, low labor productivity, heavy equipment breakdowns, and design changes during project execution. Recommended mitigation strategies include accelerating critical-path activities, implementing resource leveling, applying fast-tracking and crashing techniques, improving supply chain coordination, and incorporating schedule buffers. The findings demonstrate that the integration of CPM and PERT enhances schedule planning accuracy, improves time control effectiveness, and minimizes the risk of project delays, thereby increasing the likelihood of successful project completion within the planned schedule.