Analisis Estimasi Biaya dan Waktu Pekerjaan Struktur Baja pada Proyek Rumah Sakit Advent Manado

  • Marbella Yudhitya Pradani
  • Ratri Andinisari ITN Malang

Abstract

The construction of hospital infrastructure plays a strategic role in improving healthcare services. This study aims to analyze the estimated cost and duration of structural works for the 3rd to 5th floors of the Advent Hospital Manado project. Data were obtained from technical drawings and planning documents. The research method is descriptive quantitative, involving calculation of work volumes and preparation of the Bill of Quantities (BoQ) based on Standard Unit Price Analysis (AHSP) SNI SE DJBK No. 68 of 2024. The results indicate a total estimated cost of IDR 72,155,136,000 with a construction duration of 7 months. This study serves as a reference for planning, controlling, and evaluating similar construction projects.

Downloads

Download data is not yet available.
Published
2026-10-30