PENDEKATAN MANAJEMEN PROYEK DALAM PENJADWALAN DAN PERENCANAAN ANGGARAN PROYEK WAREHOUSE PERTAMINA CEPU

  • Antero Kukuh Maulana
  • Ratri Andinisari ITN Malang

Abstract

The construction project of the Pertamina warehouse in Cepu is part of a strategic development of energy logistics facilities in Central Java. In construction project implementation, cost and time efficiency are two key success indicators that must be accurately planned from the outset. This study aims to analyze the cost and time estimates of the project based on construction planning documents and appropriate scheduling methods.

The methodology involves collecting primary data such as the Bill of Quantities (BoQ), technical drawings, and the use of Microsoft Excel software to conduct scheduling analysis using the Precedence Diagram Method (PDM) and Critical Path Method (CPM). The results show that the total estimated project cost is IDR 4,173,888,100.00, with a completion time of 7 months or approximately 210 calendar days. Project scheduling was carried out by developing a Work Breakdown Structure (WBS), identifying the critical path, and implementing resource leveling to optimize workforce allocation.

This study contributes to systematic and efficient construction project planning and can serve as a reference for similar future projects.

Downloads

Download data is not yet available.
Published
2026-10-30