https://ejournal.itn.ac.id/gelagar/issue/feed STUDENT JOURNAL GELAGAR 2026-11-04T11:12:11+07:00 Hadi Surya W. S. gelagar@scholar.itn.ac.id Open Journal Systems <p>Student Joural Gelagar merupakan<em> e-journal </em>yang dikelola oleh Program Studi Teknik Sipil S-1 ITN Malang untuk menyebarluaskan informasi hasil - hasil penelitian mahasiswa dalam bidang Teknik Sipil dengan Sub bidang Struktur, Geoteknik, Transportasi, Manajemen Konstruksi, Sumber Daya Air dan Sistem Informasi Geografis.</p> <p>Diterbitkan secara berkala yakni 2 kali dalam setahun pada bulan April dan Oktober.</p> https://ejournal.itn.ac.id/gelagar/article/view/23356 Evaluasi Kebutuhan Area Parkir Rumah Sakit Umum Jayapura 2026-11-04T10:45:49+07:00 Rivaldo Wanggai dayrivaldowanggai@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Jayapura General Hospital, as a class B hospital, has a high level of activity, including visitor, patient, and employee vehicle traffic. The issue at hand is the limited parking capacity, which has led some visitors to park their vehicles on the roads surrounding the hospital. This study aims to analyze parking characteristics, calculate the parking space requirement (PSR), and determine the number and percentage of visitors to Jayapura General Hospital. The research methods used include primary and secondary surveys, such as parking duration surveys, interviews, and measurements of parking area dimensions. Analysis was conducted using parameters including parking accumulation, parking volume, capacity, turnover rate, parking index, parking duration, headway, and parking space requirements. The analysis results indicate that the existing parking capacity is insufficient to accommodate vehicles during peak hours, resulting in a parking index exceeding the ideal value. Based on calculations, the parking space requirement exceeds the available parking land, necessitating an increase in capacity or a reorganization of the parking layout to improve efficiency. This study is expected to serve as a reference for hospital management in planning adequate parking facilities, both for current and future needs.</em></p> 2026-10-23T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23355 STUDI PERENCANAAN DINDING PENAHAN TANAH DENGAN SOIL NAILING UNTUK PERBAIKAN LONGSOR PADA JALAN DESA SUMBERTANGKIL KECAMATAN TIRTOYUDO KABUPATEN MALANG 2026-11-04T10:46:01+07:00 Ridho Kurnia Ananda kurniaridho72@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study aims to design a <em>soil nailing </em>retaining wall in clayey silt (CL) soil conditions located in Sumbertangkil Village, Tirtoyudo District, Malang Regency. Soil parameters were obtained from laboratory and field tests, including water content, Atterberg limits, unit weight, sieve analysis, and direct shear tests. The design considers a wall height of 7 meters with a slope angle of 60°, concrete strength f’c 25 MPa, and reinforcement steel fy 420 MPa. Stability analysis was performed for sliding safety factor and bearing capacity according to SNI 8460:2017 and SNI 1726:2019. The design results show that soil nails with a length of 6 meters, horizontal spacing of 1.5 meters, vertical spacing of</p> <p>1.5 meters, and installation angle of 10° can improve the safety factor to meet the minimum standard. The design also includes a drainage system to reduce pore water pressure and enhance slope stability.</p> 2026-10-23T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23354 ANALISIS KINERJA SIMPANG TIGA TAK BERSINYAL DAN BOK PADA JL.SUROPATI –DIPONEGORO – PANGLIMA SUDIRMAN GONDANGLEGI WETAN 2026-11-04T10:46:15+07:00 Emilia Kartika Sugianto emiliakartika001@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Congestion at the unsignalized intersection of Jl. Suropati – Jl. Diponegoro – Jl. Panglima Sudirman, Gondanglegi Wetan, is caused by market activity, on-street parking, and irregular vehicle maneuvers. These factors reduce road capacity, increase delay, and affect vehicle operating costs (VOC). Since the intersection serves both local and regional traffic, including heavy vehicles, performance analysis is needed to assess efficiency and economic losses from congestion.This study applies the Indonesian Highway Capacity Manual (PKJI) 2023 for performance analysis, while VOC calculation refers to the Ministry of Public Works method (2005). Data were obtained from traffic counts, speed measurements, and geometric surveys conducted on Sunday and Monday. The analysis covered capacity, degree of saturation (DS), average delay, level of service (LOS), and VOC components such as fuel, oil, tires, and spare parts.Results indicate an intersection capacity of 31,598 pcu/hour, highest DS of 0.35, and average delay of 8.83 seconds/vehicle, corresponding to LOS B. However, congestion losses still occurred, particularly on Monday: Jl. Diponegoro Rp441,688/hour, Jl. Panglima Sudirman Rp477,090/hour, and Jl. Suropati Rp269,896/hour. The findings confirm that side friction and irregular maneuvers generate significant costs for road users.</p> 2026-10-23T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23353 ANALISIS KELAYAKAN FINANSIAL PEMBANGUNAN GEDUNG PARKIR TERPUSAT UNTUK KAWASAN WISATA KAYUTANGAN HERITAGE PADA RUAS JALAN JENDRAL BASUKI RAHMAT KOTA MALANG 2026-11-04T10:46:32+07:00 Juan Umbu Ngunju umbujuan865@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The Kayutangan Heritage Area in Malang City is one of the historic areas with high cultural and architectural value. However, unfortunately, this area suffers from severe traffic congestion, especially during holiday seasons or weekends. The causes of traffic congestion in this area include a lack of parking space, resulting in vehicles parking on the road (on-street). In this regard, the Malang City Government deems it necessary to seek solutions to this issue, one of which is by constructing a parking building in the Kayutangan Heritage Area. This study aims to assess the financial feasibility of the planned multi-story parking garage in the Kayutangan Heritage Area. The methods used in this study include Net Present Value (NPV), Benefit-Cost Ratio (BCR), Internal Rate of Return (IRR), and Payback Period. The financial analysis was conducted using an alternative parking fee of Rp 2,000 for two-wheeled vehicles and Rp 5,000 for four-wheeled vehicles, with an interest rate of 6.05%. The financial analysis shows an NPV of -Rp 19,762,312,473.92, a BCR of 1.24, and an IRR of 2.67%, which is lower than the prevailing interest rate. Therefore, the construction of a parking building in the Kayutangan Heritage Area is not financially viable. With an alternative parking fee of Rp 3,000 for two-wheeled vehicles and Rp 6,000 for four-wheeled vehicles at an interest rate of 6.05%, the financial analysis shows a Net Present Value (NPV) of Rp 5,220,619,042.50, BCR = 1.72, and 6.85%, which is higher than the prevailing interest rate, the construction of this parking building is feasible to be built.</p> 2026-10-23T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23352 PERENCANAAN REHABILITASI DAN ANGGARAN BIAYA JARINGAN IRIGASI DI DAERAH IRIGASI SOKONGGONDE KEC, MAROLE, NUSA TENGGARA TIMUR BERBASIS DATA E-PAKSI 2026-11-04T10:46:47+07:00 Magdalena Putri Krisna Je putrikrisnaje@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The Sokonggonde Irrigation Area in Maurole District, Ende Regency, East Nusa Tenggara, with an area of approximately 100 hectares, has experienced a decline in function due to damage to the primary and secondary canals as well as supporting structures such as the free intake, division structures, and intake structures. Based on the 2023 e-PAKSI evaluation, the irrigation network in this location is categorized as severely damaged and therefore requires rehabilitation. This study aims to analyze the existing condition of the irrigation network, calculate irrigation water requirements based on hydrological data, plan channel rehabilitation, and prepare a cost estimate plan. The methods used include hydrological analysis, evapotranspiration analysis, and calculation of reliable flow rates, irrigation water requirement analysis, channel dimension planning, and cost estimation based on unit price analysis. The results show that the primary canal (110 m) and secondary canal (945 m) are significantly damaged and need rehabilitation, along with the construction of one free intake, one division structure, and two intake structures. The highest irrigation water requirement was 15.541 mm/day, occurring in early June. Based on the hydraulic design, the largest primary canal dimensions are width (b) 2.00 m, depth (h) 0.06 m, and freeboard (w) 0.40 m at the BSKD 0 –BSKD 1 section, while the secondary canal dimensions are width (b) 0.90 m, depth (h) 0.03 m, and freeboard (w) 0.40 m at the BSKD 0 – BSKD 1-1–BSKD 1-4 section. The total construction cost for rehabilitating the Sokonggonde Irrigation Network is IDR 814,262,000.</p> 2026-10-23T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23351 PENGARUH MICP DAN ABU SEKAM PADI TERHADAP FISIK DAN KUAT GESER TANAH LEMPUNG EKSPANSIF 2026-11-04T10:47:05+07:00 Khofim Eka Ardinata khofimekaardinata23@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Expansive clay soils present significant challenges in civil engineering due to their high shrink-swell potential, which can cause structural damage. This study investigates the combined effect of Microbially Induced Calcite Precipitation (MICP) at 9% optimum concentration and Rice Husk Ash (RHA) at variations of 7%, 10%, 12%, and 15% on the physical properties and shear strength of expansive clay soils from Widang District, Tuban Regency, East Java. Laboratory tests included physical properties (water content, specific gravity, hydrometer analysis, Atterberg limits) and mechanical properties (Unconfined Compressive Strength, Direct Shear, and Triaxial Compression UU) with curing periods of 3, 7, 14, and 28 days. The results showed significant improvements across all parameters. The optimum condition was achieved at 9% MICP + 12% RHA with 28 days curing, yielding a reduction in Plasticity Index (PI) from 40.78% to 6.86% (83.18% reduction), indicating transformation from highly expansive to non-expansive soil. Shear strength parameters also improved substantially: Undrained Shear Strength (Su) increased from 0.511 to 1.994 kgf/cm² (74.37% increase), cohesion (c) from 0.276 to 1.469 kgf/cm² (81.21% increase), and internal friction angle (φ) from 2.18° to 3.86° (43.52% increase). Two-Way ANOVA analysis confirmed that both RHA percentage and curing period significantly affect soil improvement. This research demonstrates that the combination of MICP and RHA offers an effective, economical, and environmentally friendly solution for stabilizing expansive clay soils while utilizing agricultural waste.</p> <p>&nbsp;</p> 2026-10-23T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23350 STUDI ANALISIS STRUKTUR ATAS GEDUNG ASN DI IKN KALIMANTAN TIMUR DENGAN MENGGUNAKAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS (SRPMK) 2026-11-04T10:47:16+07:00 Fery Malino Pasang nona vegaaditama@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>As a region with high seismic activity, Indonesia requires a reliable structural system capable of meeting strict safety, stiffness, and ductility criteria. This study evaluates the seismic performance and structural design of the 14-story ASN Building in the Indonesian Capital City (IKN), East Kalimantan, utilizing the Special Moment Resisting Frame System (SRPMK) through three-dimensional finite element modeling using ETABS software. The analysis incorporates gravity loads and seismic loads calculated via the response spectrum method based on SNI 1726:2019, SNI 1727:2020, and SNI 2847:2019 provisions. The results demonstrate that the cumulative mass participation successfully meets the standard requirements, achieving a minimum of 90% at the 7th mode for the X-direction and the 8th mode for the Y-direction, thereby properly representing the dynamic behavior under earthquake loads. Furthermore, inter-story drift (∆i) evaluations indicate that the maximum displacement in the X-direction occurs at the 3rd floor at 27.423 mm, while in the Y-direction it reaches 30.310 mm at the 4th floor—both comfortably below the 84.000 mm allowable limit. Additional verifications regarding P-Delta stability effects, torsional irregularity checks, and structural member capacities confirm that the building safely complies with all criteria. Overall, the superstructure design of mobility and resilience using SRPMK fulfills all national standard criteria concerning safety, strength, stiffness, and ductility to optimally resist the combination of gravity and seismic loads.</em></p> 2026-10-23T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23349 STUDI NUMERIKAL SAMBUNGAN BALOK KE KOLOM BAJA TIPE PELAT UJUNG PADA ARAH SUMBU KUAT KOLOM 2026-11-04T10:47:34+07:00 Yohanes Christian Kapitan christiankapitan13@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Beam-to-column connections are one of the most critical components in steel structures because they transfer internal forces between elements and influence structural response under loading, particularly during earthquakes. This study aims to evaluate the behavior of an <strong>extended end-plate</strong> connection on the strong axis through numerical analysis using the <em>Finite Element Method (FEM)</em> implemented in ABAQUS. The materials used include SS400 structural steel, ASTM A325 high-strength bolts, and E70 welding material. The analysis was carried out by applying monotonic loading concentrated at the top end of the column and cyclic loading based on <em>displacement control</em> in accordance with FEMA 350 and AISC 341-22 provisions. The parameters observed include stress distribution and the moment-rotation relationship of the connection. The analysis results show that the <strong>benchmark</strong> model was able to resist a maximum moment of 264.165 kN·m at 6% rotation, while the modified model reached 246.058 kN·m at the same rotation level. Both models satisfied the minimum moment capacity requirement of 0.8Mpb, or 245.52 kN·m, as specified in AISC 341-22. In terms of stress distribution, the modified model showed that plastic deformation was more concentrated in the beam, while the column stiffener remained in the elastic range, making the connection behavior more consistent with the <strong>strong column-weak beam</strong> design philosophy. In addition, the hysteresis curve of the modified model exhibited a more stable response and better energy dissipation capacity than the<strong> benchmark</strong> model. These findings indicate that adding a column stiffener can improve the seismic performance of <strong>extended end-plate</strong> connections through a more uniform stress distribution and a better plastic deformation mechanism.</p> 2026-10-30T13:03:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23348 PERENCANAAN PENGENDALIAN BANJIR PADA SUNGAI BENGAWAN SOLO DESA NGADIREJO KEC. RENGEL KAB. TUBAN, JAWA TIMUR 2026-11-04T10:47:48+07:00 Adimas Hariyanto sipil1921134.adimashariyanto@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This planning aims to determine the maximum design flood discharge and to plan the safe dimensions of the embankment to control flooding at the location. The Bengawan Solo River plays an important role for the community, but its overflow often poses a flood threat, especially in Ngadirejo Village, Rengel District, Tuban Regency. The major flood that occurred in February 2025 resulted in inundation up to 0.5 – 0.7 meters deep, submerging more than 800 hectares of rice fields and disrupting road access and educational facilities. The planning methodology includes hydrological analysis using rainfall data from the Rengel, Maibit, and Klotok Stations for the period 2015 – 2024. The planned flood discharge analysis was calculated using the Nakayasu Synthetic Unit Hydrograph (HSS) method. Hydraulic analysis was conducted to evaluate the river cross-section capacity, and the stability of the embankment slope was tested using the Bishop method. The analysis results show the planned flood discharge using the Nakayasu Synthetic Unit Hydrograph (HSS) method, which are 9555 m³/second for a 2-year return period, 10965 m³/second for a 5-year return period, 12205 m³/second for a 10-year return period, and 13232 m³/second for a 25-year return period. Based on the flow profile simulation, several cross-section points were found to experience overflow at certain return period discharges. The mitigation planning was carried out by constructing a dam, where the stability test results using the Bishop method showed a factor of safety (FS) value &gt; 1.25. Thus, the dam construction is declared safe and stable.</p> 2026-10-30T13:05:06+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23347 PENJADWALAN PROYEK JALAN NASIONAL MENGGUNAKAN METODE PDM: STUDI KASUS RUAS AIR NANANG – KOTA BARU MALUKU 2026-11-04T10:47:57+07:00 Shafira Aisyahra Umagapy 1821166shafiraaisyahra@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Road construction plays an important role in improving interregional relations, promoting economic growth, and equitable development, especially in remote areas. One such effort is the National Road Construction Project for the Air Nanang–Kota Baru section in East Seram Regency, Maluku Province, covering the segment from STA 06+400 to STA 10+800. This study aims to develop a project implementation schedule using the Precedence Diagram Method (PDM) with Microsoft Project 2019 software. The planning results indicate a total project duration of 794 working days (2 years, 7 months, 17 days), with a difference of 316 days from the initial total duration, and 11 activities classified as critical. The results of this planning are expected to serve as a reference for initial simulations in scheduling the road construction project or similar projects.</p> <p>&nbsp;</p> 2026-10-30T13:07:56+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23346 STUDI PERENCANAAN PERKERASAN LENTUR DAN PERKERASAN KAKU PADA RUAS JALAN WAISALA – TALAGA KAMBELU KABUPATEN SBB 2026-11-04T10:48:05+07:00 Ahmad K. Huat ahmadkhuat@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The Trans Maluku Road on Seram Island serves as the main route connecting three regencies; however, it has not yet been fully integrated, leaving several areas isolated due to limited road infrastructure. One example is the Waisala – Talaga Kambelu section in West Seram Regency, specifically at STA 39+250 – STA 44+350, which remains in the form of gravel and has not been paved. Therefore, a comparative study between flexible and rigid pavement was carried out on a 5.1 km segment of the total 46 km using the 2024 Bina Marga Method.The planning includes pavement structure analysis, cost estimation (RAB) based on the 2024 Bina Marga Unit Price Analysis for Maluku Province, as well as the estimation of routine and periodic maintenance costs, considering inflation and the BI Rate over a 20-year design life.The results show that flexible pavement requires a total thickness of 46.5 cm (HRS-WC 3 cm, HRS-Base 3.5 cm, LFA A 25 cm, and LFA B 15 cm), while rigid pavement requires only a 15 cm concrete slab, a 10 cm lean concrete base, and 15 cm LFA A. The estimated cost for flexible pavement, including overlay and routine maintenance, is Rp 30.11 billion, while rigid pavement with routine maintenance amounts to Rp 20.78 billion.Thus, rigid pavement is more economical as it requires lower costs, has a longer design life, and involves relatively minimal maintenance compared to flexible pavement.</p> 2026-10-30T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23345 STUDI KINERJA SIMPANG TAK BERSINYAL TERHADAP KUALITAS UDARA DAN KEBISINGAN 2026-11-04T10:48:20+07:00 Prakoso, J prakosojaguar@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The rapid growth of motorized vehicles in Indonesia has caused increasing traffic problems, particularly at road intersections. This study aims to analyze the performance of an unsignalized intersection on the National Road of Pamekasan using the Indonesian Highway Capacity Guidelines (PKJI, 2023). Primary data were obtained from field surveys, including traffic volume, intersection geometry, saturation flow, and side friction, while secondary data were collected from related agencies. The analysis results show that the intersection capacity is 3,129 pcu/hour with a traffic volume of 2,679 pcu/hour, resulting in a degree of saturation of 0.86. The average delay was 35.84 seconds/pcu, with a queue probability of 43.41%. Based on the PKJI 2023 criteria, the level of service (LOS) is categorized as E, indicating near-saturated flow with high delays. It can be concluded that the unsignalized intersection at the National Road of Pamekasan has poor performance; therefore, improvements such as the installation of traffic signals (APILL) and traffic engineering measures are recommended to increase efficiency and safety for road users.</em></p> 2026-10-30T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23344 ANALISA KEMACETAN LALU LINTAS DIRUAS JALAN BOROBUDUR KOTA MALANG TERHADAP KUALITAS UDARA DAN TINGKAT KEBISINGAN 2026-11-04T10:48:29+07:00 Okvian Bima Prasetya Negara Okvianbima@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study evaluates congestion's impact on noise and air quality in the Borobudur Street Corridor, Malang. It uses an hourly volume-velocity survey, applies the Greenshields method to model the velocity-density relationship, and measures noise levels for 10 minutes at each site with a Sound Level Meter. Ambient measurements of carbon monoxide, nitrogen dioxide, and sulfur dioxide are converted to the Air Pollutant Standard Index (ISPU), with capacity calculations based on the 2023 Indonesian Road Capacity Guidelines. Results indicate an effective capacity of 2,588.76 Passenger Car Units (SMP) per hour and a peak volume of about 1,586 SMP per hour. The Greenshields curve shows a speed reduction of 16–19 km/h at a density of 79–89 SMP/km (R² = 1). Carbon monoxide levels ranged from 6,798–19,535 μg/m³, nitrogen dioxide from 368–376 μg/m³, and sulfur dioxide was undetected, with a daily index rated as 'Good.' However, peak hour noise reached 82.88 dB, exceeding the commercial area standard of 70 dB. The study concludes that congestion negatively affects the acoustic environment, despite good air quality. This research is notable for its simultaneous analysis of traffic, noise, and ISPU modeling in one corridor. Recommendations include time-based travel management, limiting peak heavy vehicle traffic, arranging side obstacles, and establishing green belts.</p> 2026-10-30T13:25:25+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23343 KINERJA LALU LINTAS DAN DAMPAKNYA TERHADAP KUALITAS UDARA SERTA KEBISINGAN DIJALAN VETERAN DAN JALAN BENDUNGAN SIGUR GURA 2026-11-04T10:48:37+07:00 Andik Sapto Muchlis andikmuchlis677@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The growth in the number of motor vehicles in Malang City every year has an impact on increasing traffic volume which can reduce road performance, increase noise, and reduce air quality. This study aims to analyze traffic performance on air quality and noise level on two road sections, namely Veteran Road and Sigura-Gura Dam Road.The research method was carried out by field survey to collect data on traffic volume, vehicle speed, as well as measurement of air quality (CO, NO₂) and noise using a live measuring instrument at the research site. Traffic performance data was analyzed using the Indonesian Road Capacity Guidelines (PKJI 2023), while air quality and noise were compared to the quality standards set in the Regulation of the Minister of Environment. The growth in the number of motor vehicles in Malang City every year has an impact on increasing traffic volume which can reduce road performance, increase noise, and reduce air quality. This study aims to analyze traffic performance on air quality and noise level on two road sections, namely Veteran Road and Sigura-Gura Dam Road.The research method was carried out by field survey to collect data on traffic volume, vehicle speed, as well as measurement of air quality (CO, NO₂) and noise using a live measuring instrument at the research site. Traffic performance data was analyzed using the Indonesian Road Capacity Guidelines (PKJI 2023), while air quality and noise were compared to the quality standards set in the Regulation of the Minister of Environment.The results showed that the service level (LOS) on both roads was in categories A-D during peak hours, which reflected the condition of heavy but still stable traffic flow. The average noise level exceeds the noise quality standard threshold, which is more than 65 dB(A). Meanwhile, the concentration of CO and NO₂ air pollutants is close to the quality standard threshold value, so it has the potential to cause health problems if it continues to increase. It can be concluded that the heavy traffic performance on both roads contributes directly to the high noise levels and the decrease in air quality around the study site.</em></p> 2026-10-30T13:29:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23342 Evaluasi Kinerja dan Polusi Udara Simpang Tiga Tak Bersinyal Wagir–Kebonagung PKJI 2023 2026-11-04T10:48:56+07:00 Putra Dwi Maulana putracao1@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The main problem at the Junction Three Unsignaled Wagir and Kebonagung Highways is congestion during peak hours due to the high volume of vehicles, which reduces intersection services and has the potential to have a bad impact on the surrounding community.This study aims to evaluate the performance of the intersection, analyze the air quality (CO and NO₂) around the intersection, offer improvement solutions, and predict performance over the next five years using the PKJI 2023 method. Data was collected through traffic surveys, queues, delays, and air quality measurements.As a result, the degree of saturation during the Sunday morning peak hour reached 0.94 (category C) with an average delay of 16.8 seconds per vehicle. The two solutions offered are the installation of three-phase traffic lights (APILL) and the widening of road approaches. Road widening is more effective, reducing the delay to 14.86 seconds and increasing the service to category B so it is recommended. According to the ISPU, air quality is still good, although the relationship between delays and air pollution is proven to be low. Predictions in the next five years show that congestion is getting worse, services drop to category D.In conclusion, this intersection is not optimal, widening the road approach is the best solution, and air pollution control must be considered to anticipate increasingly heavy traffic in the future</p> 2026-10-30T13:31:20+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23341 PENERAPAN METODE PRECEDENCE DIAGRAM METHOD DALAM PENJADWALAN PROYEK JALAN SIMPANG BATU-LABURAN KABUPATEN PASER, KALINMANTAN TIMUR 2026-11-04T10:49:07+07:00 Muhammad Rifqi Pratama Surya 1821038.mrifqipratama@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Construction project scheduling plays a vital role in ensuring time efficiency and coordination among project activities. This study aims to develop a project schedule for the road improvement project at Simpang Batu–Laburan, located in Paser Belengkong District, East Kalimantan Province, using the <em>Precedence Diagram Method</em> (PDM). The data utilized include design drawings and the Bill of Quantities (BoQ), analyzed with the aid of Microsoft Project Professional. The results indicate that the total project duration using the PDM method is 114 calendar days, with several activities identified on the critical path, meaning they have zero float. One of the non-critical activities, namely the subbase concrete layer work, has the highest total float of 63.5 days. The application of PDM proved effective in providing a systematic scheduling structure, accurately identifying the critical path, and supporting efficient project time management.</p> 2026-10-30T13:33:48+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23340 PENILAIAN KINERJA SUMBER DAYA MANUSIA KONTRAKTOR TERHADAP ASPEK BIAYA DAN WAKTU PEKERJAAN STRUKTUR GEDUNG BERTINGKAT 2026-11-04T10:49:19+07:00 Ardhi Nuansa Ichsan 1821179.ardhinuansa@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study aims to evaluate the human resource performance of construction service providers by focusing on two key aspects: cost and time in the execution of multi-story building structures. The case study selected is the construction of the Tsurayya Islamic School Dormitory Building located in Malang Regency. To explore the factors influencing project performance, the Analytical Hierarchy Process (AHP) methodology is employed, enabling multi-criteria analysis of nine human resource variables. These variables include competency-based placement, work motivation, procedural compliance, leadership, work experience, knowledge, facilities, commitment, and discipline. Primary data were collected through questionnaires distributed to respondents directly involved in the project and subsequently processed using Expert Choice 11 software. The analysis results indicate that the time aspect holds a significantly higher priority weight (71.9%) compared to the cost aspect (28.1%). The three most dominant human resource variables influencing project performance are experience (14.3%), procedural compliance (13.5%), and discipline (13.3%). These findings highlight the importance of improving human resource quality, particularly in terms of experience and adherence to procedures, to optimize time efficiency in construction project execution. As a recommendation, the study suggests the development of additional variables such as quality, as well as the application of combined analytical methods to achieve more accurate evaluation results.</p> Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23339 STUDI ANALISIS WAKTU DAN BIAYA PROYEK JALAN SIMPANG BATU-LABURAN MENGGUNAKAN PRECEDENCE DIAGRAM METHOD (PDM) 2026-11-04T10:49:31+07:00 Bagas Prayogo Ashari bagasashari9@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Project scheduling plays a crucial role in ensuring the effectiveness of construction project implementation, both in terms of time and cost. This study analyzes the duration and cost of the Simpang Batu-Laburan Road Improvement Project by comparing conventional (existing) scheduling with the Precedence Diagram Method (PDM). The analysis was conducted by calculating the total duration and cost for each method and the evaluating their efficiency. The results show that the existing schedule required 150 working days while rescheduling with PDM reduced the duration to 88 working days, achieving a time efficiency of 62 working days. However, the direct project cost increase form Rp17.702.184.000,00 to Rp17.972.343.000,00 due to adjustments in equipment coefficients and productivity improvement strategies. Despite the slight cost increase, the application of PDM proved effective in achieving significant time efficiency and supporting more optimal project execution. Therefore, this method is recommended for implementation from the planning stage, particularly for project with high complexity.</p> 2026-10-30T13:39:06+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23338 OPTIMALISASI SUMBER DAYA MANUSIA DENGAN PENERAPAN METODE PRECEDENCE DIAGRAM METHOD PADA PROYEK REKONSTRUKSI JALAN 2026-11-04T10:49:44+07:00 Muhammad Syarif Hidayatullah syarifrider13@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study analyzes time acceleration and cost impacts on the Rajekwesi Kalipare–Donomulyo road reconstruction project using the Precedence Diagram Method (PDM) and human resource optimization based on workload balancing and worker productivity. Employing a quantitative descriptive methodology with BoQ and technical drawings data, analysis via Microsoft Project and Excel evaluated three acceleration alternatives: (1) added equipment/workers, (2) extended work hours, and (3) simultaneous execution of similar tasks at three points. Results show the original 66-day duration can be reduced to 53 days (Alt 1), 62 days (Alt 2), and 65 days (Alt 3), but with cost increases from Rp2,437,614,513.92 to Rp2,604,160,281.51 (+6.83%), Rp2,536,240,546.97 (+4.05%), and Rp2,714,391,506.94 (+11.35%) respectively. The acceleration reduces duration yet raises costs, necessitating balanced consideration of time efficiency and budget constraints when selecting alternatives.</p> 2026-10-30T13:41:13+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23337 STUDI PERENCANAAN DINDING PENAHAN TANAH TIPE KANTILEVER UNTUK PERBAIKAN LONGSOR PADA JALAN DESA SUMBER TANGKIL KECAMATAN TIRTOYUDO KABUPATEN MALANG 2026-11-04T10:49:54+07:00 Rizky Jaya Laksana rizkyjayaa666@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This Final Project discusses the planning of a cantilever-type retaining wall in Sumber Tangkil Village, Tirtoyudo District, Malang Regency, where a landslide occurred on the roadside. The analysis was carried out manually using the Bishop method and supported by Geo5 software to obtain safety factors (FS) against overturning, sliding, and soil bearing capacity. The results show that the cantilever retaining wall design with a height of ±8 meters meets the safety requirements with FS &gt; 1.5 and is safe against overturning, sliding, and bearing capacity. Reinforcement calculations according to SNI 2847-2019 confirm the required reinforcement. Thus, the cantilever retaining wall is the most appropriate and efficient technical solution for the study location.</p> 2026-10-30T13:43:35+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23336 OPTIMALISASI BIAYA DAN KINERJA PADA PEMBANGUNAN GEDUNG ICU RSUD NGUDI WALUYO WLINGI-BLITAR MELALUI REKAYASA NILAI 2026-11-04T10:50:05+07:00 Ferdian Wahyudianto ferdianwahyu13@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The rapid development of the global construction industry has had a significant impact on the Indonesian economy. However, when doing construction work, cost savings are needed. Because there are so many incidents of waste of time and cost in construction projects, so these conditions need to be minimized. Based on these problems, it is necessary to apply value engineering to carry out a more economical planning strategy. The stages in the application of value engineering are information stage, creative/speculation stage, cost analysis stage, decision making based on Life Cycle Cost and AHP methods, recommendation stage, and presentation &amp; follow-up stage. Based on research that has been conducted on the construction project of the ICU Building of Ngudi Waluyo Wlingi Hospital, Blitar Regency, there are selected work items that are applied Value Engineering, namely the work of doors, windows and partitions. Based on the results of Value Engineering, it was found that for the work of doors, windows and partitions, the amount of savings obtained was 21,46% or Rp 145.565.947,77 from Rp 678.227.531,00, resulting in Rp 532.661.583,23.</p> 2026-10-30T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23335 STUDI ALTERNATIF PERENCANAAN STRUKTUR BAJA PADA GEDUNG GKB V UNIVERSITAS MUHAMMADIYAH MALANG DENGAN FLUID VISCOUS DAMPER (FVD) 2026-11-04T10:50:14+07:00 Chonis Tanaem chonislorzet@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; text-justify: inter-ideograph; margin: 0in -.1pt 6.0pt 0in;"><span lang="EN-GB">Indonesia is located at the convergence of three major tectonic plates, making it highly vulnerable to earthquakes; therefore, earthquake-resistant structural design is essential. One of the seismic damping devices that can be applied is the <em>Fluid Viscous Damper</em> (FVD), which functions to absorb seismic energy and reduce the design earthquake forces transmitted to structural elements. This study analyzes the performance of a steel structure in the GKB V Building at Universitas Muhammadiyah Malang with the application of three types of FVD, namely 500 kN, 750 kN, and 1000 kN capacity. The structural modeling was carried out using ETABS software, considering dead loads, live loads, and seismic loads in accordance with SNI 1726:2019. The FVDs were installed along the X-axis (longitudinal) and Y-axis (transverse) at the building’s edges. The analysis results indicate that the use of FVDs reduces the structural period, base shear, and inter-story drift, thereby improving the stiffness and stability of the structure. Furthermore, the bending moment in beams decreased, while the axial compressive force and moment in columns increased compared to the structure without FVDs. Overall, the application of FVDs proved effective in enhancing the seismic performance of the structure.</span></p> 2026-10-30T13:59:57+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23334 EVALUASI TINGKAT KERUSAKAN JALAN MENGGUNAKAN PROVINCIAL/KABUPATEN ROAD MANAGEMENT SYSTEM (PKRMS) 2026-11-04T10:50:28+07:00 Hesti Ardhiya Riyantina hestyardia@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>In an effort to improve road maintenance and management programs, the Ministry of Public Works and Housing (PUPR) has introduced the Provincial/District Road Management System (PKRMS), which is correlated with the Surface Distress Index (SDI) and the International Roughness Index (IRI) to support road management at the provincial and district levels. PKRMS is designed to assist in Planning, Programming, and Budgeting (PPP). This software provides information and recommendations related to road maintenance at the provincial and district levels. PKRMS helps policymakers in decision-making and enhances road management more efficiently.</em></p> <p><em>Based on the analysis of road damage using the Surface Distress Index (SDI), International Roughness Index (IRI), and the Provincial/District Road Management System (PKRMS), it was found that out of four road sections, 65.49% are in good condition while 34.51% are in poor condition.The priority handling for the four road sections in Trenggalek Regency is as follows Pandean–Malasan Road Section with a TPI value of 65.7, Wonorejo–Sebo Road Section with a TPI value of 57.8, Tekol–Malasan Road Section with a TPI value of 50.4, Kedunglurah–Gandusari Road Section with a TPI value of 0. The total budget required for the maintenance of these four road sections is IDR 55,784,000,000.</em></p> 2026-10-30T14:10:39+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23333 Kinerja Lalu Lintas Jalan Provinsi Terhadap Kualitas Udara Pada Ruas Jalan Mawar Gedeg-Mojokerto 2026-11-04T10:50:40+07:00 Sandy Yudha Del Piero sandyyudha956@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Economic and population development in East Java, especially in the Mojokerto Regency area, has led to an increase in vehicle activity on provincial roads. This has an impact on increasing pollution levels which affect the comfort and health of the surrounding community. This study aims to analyze how the traffic performance on the Jalan Mawar Gedeg-Mojokerto section and analyze the air quality. The method used in this performance evaluation uses the reference of PKJI 2023 and Ministerial Regulation Number 96 of 2015. This study is only focused on the analysis of traffic and the relationship of performance value variables and air quality. The results of the analysis show that the performance of the provincial road section in the Jalan Mawar Gedeg-Mojokerto segment in the existing condition obtained a traffic volume at peak hours of 4208 smp/hour, has a capacity of 4501 smp/hour, a free flow speed (Fv) of 56.9 km/h and has a degree of genius (DJ) condition of 0.93. For the average speed (VT) of PKJI 2023, a value of 28 km/h was obtained.</p> 2026-10-30T14:20:41+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23332 STUDI KINERJA SIMPANG TAK BERSINYAL TERHADAP KUALITAS UDARA DAN KEBISINGAN 2026-11-04T10:50:53+07:00 Prakoso, J prakosojaguar@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The rapid growth of motorized vehicles in Indonesia has caused increasing traffic problems, particularly at road intersections. This study aims to analyze the performance of an unsignalized intersection on the National Road of Pamekasan using the Indonesian Highway Capacity Guidelines (PKJI, 2023). Primary data were obtained from field surveys, including traffic volume, intersection geometry, saturation flow, and side friction, while secondary data were collected from related agencies. The analysis results show that the intersection capacity is 3,129 pcu/hour with a traffic volume of 2,679 pcu/hour, resulting in a degree of saturation of 0.86. The average delay was 35.84 seconds/pcu, with a queue probability of 43.41%. Based on the PKJI 2023 criteria, the level of service (LOS) is categorized as E, indicating near-saturated flow with high delays. It can be concluded that the unsignalized intersection at the National Road of Pamekasan has poor performance; therefore, improvements such as the installation of traffic signals (APILL) and traffic engineering measures are recommended to increase efficiency and safety for road users.</em></p> 2026-10-30T14:27:29+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23331 PENDEKATAN MANAJEMEN PROYEK DALAM PENJADWALAN DAN PERENCANAAN ANGGARAN PROYEK WAREHOUSE PERTAMINA CEPU 2026-11-04T10:51:05+07:00 Antero Kukuh Maulana anteromaulana@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The construction project of the Pertamina warehouse in Cepu is part of a strategic development of energy logistics facilities in Central Java. In construction project implementation, cost and time efficiency are two key success indicators that must be accurately planned from the outset. This study aims to analyze the cost and time estimates of the project based on construction planning documents and appropriate scheduling methods. </em></p> <p><em>The methodology involves collecting primary data such as the Bill of Quantities (BoQ), technical drawings, and the use of Microsoft Excel software to conduct scheduling analysis using the Precedence Diagram Method (PDM) and Critical Path Method (CPM). The results show that the total estimated project cost is IDR 4,173,888,100.00, with a completion time of 7 months or approximately 210 calendar days. Project scheduling was carried out by developing a Work Breakdown Structure (WBS), identifying the critical path, and implementing resource leveling to optimize workforce allocation. </em></p> <p><em>This study contributes to systematic and efficient construction project planning and can serve as a reference for similar future projects.</em></p> 2026-10-30T14:32:25+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23330 PENELITIAN MICROBIALLY INDUCE CALCITE PRECIPITATION PADA TANAH LEMPUNG BERLANAU SERTA PENGARUHNYA TERHADAP NILAI KUAT GESER 2026-11-04T10:51:17+07:00 Wildan Bayu Saputra wildanbayusaputra@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; text-justify: inter-ideograph; margin: 0in -.1pt 6.0pt 0in;"><span lang="EN-GB">This research was conducted to address the problem of low shear strength in silty clay soil, which often reduces construction stability. The main objective was to examine how Microbially Induced Calcite Precipitation (MICP) with different mixture variations could enhance the soil’s physical and mechanical properties. The study specifically analyzed the influence of mixture percentages (4%, 6%, 8%, and 10%) and curing periods (3, 7, 14, and 28 days) on shear strength, cohesion, and plasticity index. Laboratory tests included the Plasticity Index (PI), Direct Shear Test, Triaxial Compression Test, and Unconfined Compressive Strength (UCS). Data analysis used the Two-Way ANOVA with Replications method, supported by soil mechanics theory and the concept of bioconsolidation through bacterial calcite precipitation. Findings revealed that MICP effectively improved soil properties, with the best performance achieved at 6%–8% mixtures combined with 28 days of curing. Under these conditions, the UCS reached 0.720 kgf/cm², Direct Shear 0.946 kgf/cm², and Triaxial cohesion 0.860 kgf/cm². However, higher dosage (10%) caused strength reduction due to saturation and uneven calcite distribution. Overall, MICP proved to be an effective technique for enhancing silty clay soil stability, provided the mixture composition and curing period are carefully controlled.</span></p> 2026-10-30T14:41:42+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23329 EVALUASI PENGARUH PENAMBAHAN LIMBAH HDPE PADA CAMPURAN ASPAL TERHADAP KARAKTERISTIK MARSHALL 2026-11-04T10:51:27+07:00 Akh. Faizal Amir faizalamir134@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Road infrastructure is one of the key components in supporting mobility and economic growth. However, the quality of road pavement often deteriorates due to high traffic loads and changes in environmental conditions. Therefore, innovative efforts are needed to improve the performance of asphalt mixtures. One approach that can be taken is the use of High Density Polyethylene (HDPE) plastic waste as an additive in asphalt mixtures. This study aims to investigate the effect of adding HDPE waste on the characteristics of AC-WC (Asphalt Concrete – Wearing Course) asphalt mixtures using the Marshall method through dry mixing. The variations in HDPE content used are 0%, 3%, 5%, 7%, and 9% of the asphalt weight. Tests were conducted to obtain Marshall parameters such as stability, flow, Marshall Quotient (MQ), Void in Mix (VIM), Void in Mineral Aggregate (VMA), and Void Filled with Bitumen (VFB). The results of the study indicate that the addition of HDPE waste significantly affects the stiffness and stability of the mixture. At certain concentrations, mixtures containing HDPE can enhance stability and Marshall Quotient values, making the mixture stiffer and more resistant to traffic loads. However, excessive HDPE addition tends to reduce mixture flexibility, as indicated by decreased flow values. The optimal HDPE concentration in this study was found to be around 5%–7%, where the mixture meets Marshall specifications and provides the best performance. The use of HDPE plastic waste in asphalt mixtures not only improves road pavement quality, but also contributes positively to plastic waste management and environmental sustainability.</p> 2026-10-30T15:04:59+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23328 Analisis Estimasi Biaya dan Waktu Pekerjaan Struktur Baja pada Proyek Rumah Sakit Advent Manado 2026-11-04T10:51:40+07:00 Marbella Yudhitya Pradani 1821187.marbellayudhityap@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The construction of hospital infrastructure plays a strategic role in improving healthcare services. This study aims to analyze the estimated cost and duration of structural works for the 3rd to 5th floors of the Advent Hospital Manado project. Data were obtained from technical drawings and planning documents. The research method is descriptive quantitative, involving calculation of work volumes and preparation of the Bill of Quantities (BoQ) based on Standard Unit Price Analysis (AHSP) SNI SE DJBK No. 68 of 2024. The results indicate a total estimated cost of IDR 72,155,136,000 with a construction duration of 7 months. This study serves as a reference for planning, controlling, and evaluating similar construction projects.</em></p> 2026-10-30T15:12:52+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23327 PENERAPAN METODE PREDENCE DIAGRAM METHOD UNTUK PENJADWALAN DAN PEMBIAYAAN PROYEK PEMBANGUNAN RUMAH SAKIT 2026-11-04T10:51:45+07:00 Gaet Aldaffa gaetaldaffa@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study aims to analyze cost and time planning in the construction project of a hospital in Bululawang, Malang Regency. The technical data used includes working drawings, volume calculations, Unit Price Analysis (AHSP), and the Budget Plan (RAB). The project was analyzed using the Work Breakdown Structure (WBS) method to break down project phases, and the Precedence Diagram Method (PDM) for scheduling. The analysis shows that the project’s duration in the existing plan is 328 days with a total cost of IDR 3.239.140.000. To accelerate the project timeline, additional labor was employed, reducing the duration to 269 days. However, this acceleration resulted in an increased project cost of IDR 4.121.620.000. The comparison between the existing and accelerated schedule and budget reveals a trade-off between time and cost, which must be carefully considered in construction project management.</p> 2026-10-30T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23326 EVALUASI KINERJA SIMPANG BERSINYAL DAN PREDIKSI BIAYA OPERASIONAL KENDARAAN AKIBAT KEMACETAN LALU LINTAS (Studi Kasus : Simpang Sukun Janti, Jl. S. Supriad-Jl. Janti Barat, Kota Malang) 2026-11-04T10:51:52+07:00 Maria Tasina Geha gehamaria3@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Traffic congestion is a common issue that frequently occurs in various locations, including intersections, markets, and schools. One of the congestion points in Malang City is the Sukun Janti Intersection, which connects Jalan S. Supriadi and Jalan Janti Barat. The congestion at this intersection results in traffic delays that increase Vehicle Operating Costs (VOC), particularly in terms of Fuel Consumption Costs (FCC). This study aims to evaluate the traffic performance at the Sukun Janti Intersection and estimate the economic losses caused by congestion using the Indonesian Highway Capacity Manual (PKJI) 2023 and simulations with PTV VISSIM 25. Fuel consumption was calculated based on the formulation developed by LAPI-ITB, while the relationship between delay and FCC was analyzed using simple linear regression. The PKJI 2023 analysis indicated that the average delays during peak hours in the morning, afternoon, and evening were 134.29 sec/pcu, 227.71 sec/pcu, and 258.78 sec/pcu, respectively, with a Level of Service (LOS) of F. Meanwhile, the simulation using VISSIM 25 showed average delays of 55.53 sec/pcu (north approach, LOS E), 98.29 sec/pcu (east approach, LOS F), and 33.34 sec/pcu (south approach, LOS D). The estimated economic losses due to traffic delays were IDR 38,999,048.76/day, IDR 1,013,975,267.66/month, and IDR 12,362,698,455.67/year. The regression analysis revealed a very strong correlation between traffic delay and fuel consumption cost (r = 0.9997), indicating that an increase in delay has a significant impact on the economic losses caused by congestion.</p> 2026-10-30T15:39:20+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23325 PERENCANAAN PERBAIKAN TANAH DENGAN MENGGUNAKAN PVD (PREFABRICATED VERTICAL DRAIN) DAN TIMBUNAN (PRELOADING) PADA PEMBANGUNAN GEDUNG ITS TOWER 3 2026-11-04T10:52:03+07:00 Agista tri kurniawan agistatri0308@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The construction of ITS Tower 3 in Surabaya faces challenges due to the presence of soft clay soil characterized by low bearing capacity, high compressibility, and low permeability, which pose risks of significant settlement and endanger the stability of high-rise structures. To address this issue, soil improvement was planned using the preloading method combined with <em>Prefabricated Vertical Drain</em> (PVD) installation to accelerate the consolidation process. This study aims to analyze the magnitude of soil settlement and consolidation time under untreated conditions and compare them with conditions after applying PVD with different installation patterns (triangular and square) and spacing variations (1.0 m–1.6 m). The research methods include analyzing field and laboratory soil test data, calculating consolidation parameters, and simulating consolidation time based on different PVD configurations. The results show that PVD application significantly accelerates consolidation time compared to untreated soil, with triangular patterns at closer spacing providing higher efficiency despite requiring higher costs. Furthermore, the combination of preloading and PVD proved effective in accelerating initial settlement before structural construction, thereby reducing the risk of long-term deformation.</p> 2026-10-30T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23324 ANALISIS PERENCANAAN BIAYA DAN WAKTU PEKERJAAN GEDUNG LABORATURIUM DAN PERPUSTAKAN MAN INSAN CENDEKIA PASURUAN JAWA TIMUR 2026-11-04T10:52:14+07:00 Alfan Dhiar Irfiawan alfandhiar11@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study aims to analyze the cost and time planning in the construction project of the Man Insan Cendekia Laboratory and Library Building in Pasuruan, East Java. The technical data used includes working drawings, volume backups, Work Unit Price Analysis (AHSP). To perform this project analysis, Microsoft <em>Excl software </em>was used to analyze the Cost Budget Plan (RAB) and Scheduling. The results of the analysis showed that the calculation of the Cost Budget Plan (RAB) for preparatory work, K3 security and safety work, Foundation work, 1,2,3rd floor structure work and Roof work. The results show that the estimated total cost is Rp 2,130,393,000.00. With a settlement time of 5 months or about (150 days) of the calendar. To find the critical path in this research using the Critical Path Method (CPM) method with the analysis of the calculations above, it can be seen that the Total Float (TF) whose value = 0 is the activity B, E, I, K, L, M this means that the activity does not have a grace period to be late so it is called a critical activity and TF that has the value of the activity has a grace period, namely activity A, C,D,F,G,H,J.based on the normal duration of the project.</p> 2026-10-30T15:47:33+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23323 PENERAPAN METODE CRITICAL PATH METHOD (CPM) UNTUK PENJADWALAN DAN PEMBIAYAAN PEKERJAAN STRUKTUR ATAS PROYEK PEMBANGUNAN JEMBATAN PT. SAWIT LAMANDAU RAYA KABUPATEN LAMANDAU KALIMANTAN TENGAH 2026-11-04T10:52:20+07:00 Sandi Prima Sianipa sandivansmit@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Project implementation requires proper planning, scheduling, and management, including resources, availability of materials, equipment, natural conditions, weather conditions, and other factors that affect project progress. Project planning describes the relationships between activities and the entire project, and helps determine the priority of relationships between activities. This study aims to (1) analyze the total cost and time planning for the superstructure work of the PT. Sawit Lamandau Raya bridge construction, and (2) analyze the difference in time and cost after re-analysis of the superstructure work of the PT. Sawit Lamandau Raya bridge construction. This study uses the CPM method. This method analyzes the implementation time of the superstructure work of the PT. Sawit Lamandau Raya bridge construction in Lamandau Regency.</em></p> <p><em>Based on the analysis results, it was found that the total planning cost and implementation time were Rp 11.678.893.800,00 and 106 days. After being analyzed using the CPM method, it was found that there was an additional planning cost of Rp 540.000,00 so that the total planning cost became Rp 11.698.541.800,00 and the implementation time was accelerated by 13 days, so that the implementation time for the upper structure work of the bridge construction project became 93 days. This study shows that systematic scheduling can accelerate the construction process of the bridge project.</em></p> 2026-10-30T16:22:25+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23322 EVALUASI RANCANGAN ANGGARAN BIAYA PADA PEMBANGUNAN GEDUNG EL. HOTEL BANYUWANGI 2026-11-04T10:52:33+07:00 Yossy Utami yossyutami@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The development of the tourism sector in Banyuwangi has driven an increasing need for adequate accommodation facilities. One effort to fulfill this is through the construction of El Hotel Banyuwangi as a strategic project that provides modern lodging services. In its implementation, the budget plan plays a crucial role in ensuring the smooth and efficient running of the construction project. This study aims to compile a detailed and systematic budget plan based on existing technical drawings and work specifications. The methods used include the stages of collecting working drawing data, calculating work volumes based on Shop Drawings, selecting the Work Unit Price Analysis method, and using the Banyuwangi Regency Unit Price for the 2023 Fiscal Year. The cost estimate was prepared comprehensively with the help of Microsoft Excel and AutoCAD software, which speeds up the recapitulation process and minimizes the potential for manual errors. The calculation results show that the total construction cost of the El Hotel Banyuwangi building reached IDR 7.301.546.000, including structural and roof work and 11% VAT. With proper budget planning, this project is expected to become a model for efficient and accurate construction cost management, and contribute to encouraging the development of the tourism sector and the local economy. This research provides practical guidance for hotel project cost planning and strengthens the application of data- and technology-driven construction management.</p> 2026-10-30T16:26:38+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23321 STUDI PENELITIAN MICROBIALLY INDUCED CALCITE PRECIPITATION PADA TANAH LANAU SERTA PENGARUHNYA TERHADAP NILAI KUAT GESER TANAH 2026-11-04T10:52:44+07:00 M. Bagus Budiono Budibagus989@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The purpose of this study is to analyze the effect of Microbially Induced Calcite Precipitation (MICP) on improving the mechanical properties of Lanau soil using Bacillus subtilis bacteria. Tanah lanau memiliki kohesi yang rendah, mudah tererosi, dan tidak stabil untuk konstruksi. MICP (Microbially Induced Calcite Precipitation) is an environmentally friendly method of stabilization that utilizes the process of biocementation to form calcium carbonate (CaCO₃) deposits that bind soil particles. The research method included varying the concentration of the sementation solution (2.5%, 4.5%, 6.5%, and 8.5%) and the duration of the curing period (3, 7, 14, and 28 days). Pengujian dilakukan untuk parameter fisika (kadar air, berat jenis, dan batas Atterberg) dan mekanik (Direct Shear, Triaxial UU, dan Unconfined Compressive Strength). The results showed that MICP increased the cohesion, internal friction angle, and compressive strength of the clayey soil, with an optimum value at a concentration of 8.5% and a curing time of 28 days. ANOVA testing proved that variations in concentration and incubation time significantly affect the mechanical properties of the soil.</p> 2026-10-30T16:29:38+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23320 PENGEMBANGAN SISTIM DISTRIBUSI AIR BERSIH PDAM DI KELURAHAN CEMORO KANDANG KOTA MALANG 2026-11-04T10:52:51+07:00 Weta Corolla wetacorola@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Based on existing conditions, the clean water service provided by the Malang City PDAM (Municipal Waterworks) already covers all five districts: Blimbing, Sukun, Klojen, Kedungkandang, and Lowokwaru. Data from the Central Statistics Agency (BPS) of Malang City in 2019 shows that the population of Kedungkandang District reached 194,341 people. However, from that number, only 35,054 people are served by the PDAM through 8,763 installed house connections (SR).This research was conducted through several main stages, beginning with concept formulation. This concept was then used as a basis for analyzing problems and as a guideline for planning the clean water system development. The method used is a combination of survey and descriptive methods with a case study approach.The long-term clean water demand projection was carried out using the exponential method, assuming a population growth rate of 0.033%. The projection results estimate that by 2030, the population to be served will reach 20,139 people, equivalent to 3,625 house connections. To meet this demand, a water discharge of 24.54 liters per second is required.Based on simulations using WaterCad V8i software, it was concluded that the optimal primary pipe network consists of a 150 mm diameter for Zone 1, a 125 mm diameter for Zone 2, and a 100 mm diameter for Zone 3.</p> 2026-10-30T16:34:24+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23319 PENILAIAN KINERJA SUMBER DAYA MANUSIA PENYEDIA JASA KONTRUKSI TERHADAP ASPEK BIAYA DAN WAKTU PEKERJAAN STRUKTUR GEDUNG BERTINGKAT 2026-11-04T10:52:58+07:00 Ardhi Nuansa Ichsan 1821179.ardhinuansa@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>This study aims to evaluate the human resource performance of construction service providers by focusing on two key aspects: cost and time in the execution of multi-story building structures. The case study selected is the construction of the Tsurayya Islamic School Dormitory Building located in Malang Regency. To explore the factors influencing project performance, the Analytical Hierarchy Process (AHP) methodology is employed, enabling multi-criteria analysis of nine human resource variables. These variables include competency-based placement, work motivation, procedural compliance, leadership, work experience, knowledge, facilities, commitment, and discipline. Primary data were collected through questionnaires distributed to respondents directly involved in the project and subsequently processed using Expert Choice 11 software. The analysis results indicate that the time aspect holds a significantly higher priority weight (71.9%) compared to the cost aspect (28.1%). The three most dominant human resource variables influencing project performance are experience (14.3%), procedural compliance (13.5%), and discipline (13.3%). These findings highlight the importance of improving human resource quality, particularly in terms of experience and adherence to procedures, to optimize time efficiency in construction project execution. As a recommendation, the study suggests the development of additional variables such as quality, as well as the application of combined analytical methods to achieve more accurate evaluation results.</em></p> 2026-10-30T16:38:32+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23318 ANALISIS WAKTU DAN BIAYA MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM)(STUDI KASUS: JALAN SIMPANG BATU-LABURAN) 2026-11-04T10:53:08+07:00 Bagas Prayogo Ashari bagasashari9@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Project scheduling plays a crucial role in ensuring the effectiveness of construction project implementation, both in terms of time and cost. This study analyzes the duration and cost of the Simpang Batu-Laburan Road Improvement Project by comparing conventional (existing) scheduling with the Precedence Diagram Method (PDM). The analysis was conducted by calculating the total duration and cost for each method and the evaluating their efficiency. The results show that the existing schedule required 150 working days while rescheduling with PDM reduced the duration to 88 working days, achieving a time efficiency of 62 working days. However, the direct project cost increase form Rp17.702.184.000,00 to Rp17.972.343.000,00 due to adjustments in equipment coefficients and productivity improvement strategies. Despite the slight cost increase, the application of PDM proved effective in achieving significant time efficiency and supporting more optimal project execution. Therefore, this method is recommended for implementation from the planning stage, particularly for project with high complexity.</p> 2026-10-30T16:52:39+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23317 OPTIMALISASI BIAYA DAN KINERJA FUNGSI PADA PEMBANGUNAN GEDUNG ICU RSUD NGUDI WALUYO WLINGI-BLITAR MELALUI PENDEKATAN REKAYASA NILAI 2026-11-04T10:53:17+07:00 Ferdian Wahyudianto ferdianwahyu13@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The rapid development of the global construction industry has had a significant impact on the Indonesian economy. However, when doing construction work, cost savings are needed. Because there are so many incidents of waste of time and cost in construction projects, so these conditions need to be minimized. Based on these problems, it is necessary to apply value engineering to carry out a more economical planning strategy. The stages in the application of value engineering are information stage, creative/speculation stage, cost analysis stage, decision making based on Life Cycle Cost and AHP methods, recommendation stage, and presentation &amp; follow-up stage. Based on research that has been conducted on the construction project of the ICU Building of Ngudi Waluyo Wlingi Hospital, Blitar Regency, there are selected work items that are applied Value Engineering, namely the work of doors, windows and partitions. Based on the results of Value Engineering, it was found that for the work of doors, windows and partitions, the amount of savings obtained was 21,46% or Rp 145.565.947,77 from Rp 678.227.531,00, resulting in Rp 532.661.583,23</em>.</p> 2026-10-30T17:23:09+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23316 PENERAPAN METODE FAILURE MODE AND EFFECT ANALYSIS DALAM MENETAPKAN PRIORITAS RISIKO PROYEK PEMBANGUNAN GEDUNG BERTINGKAT 2026-11-04T10:53:26+07:00 Achmad Maulana Farabi achmadfarabi19@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>High-rise building construction projects are highly complex and vulnerable to various risks that can hinder project execution in terms of time, cost, and quality. This study aims to identify and prioritize risks in the construction project of the Tsurayya Islamic School Dormitory Building in Malang using the Failure Mode and Effect Analysis (FMEA) method. The analysis results indicate that the most dominant risk is rain/flooding with an RPN value of 75, followed by incompetent workers and material procurement delays, each with an RPN value of 60. Based on these findings, mitigation actions were taken, including schedule adjustments, workforce training, coordination with suppliers, and the provision of backup vendors. This study demonstrates that the systematic application of risk management can help anticipate and control potential risks during the implementation of construction projects.</p> 2026-10-30T17:29:09+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23315 OPTIMALISASI ALOKASI SUMBER DAYA MANUSIA DENGAN PENERAPAN METODE PRECEDENCE DIAGRAM METHOD PADA PROYEK REKONSTRUKSI JALAN 2026-11-04T10:53:35+07:00 Muhammad Syarif Hidayatullah syarifrider13@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study analyzes time acceleration and cost impacts on the Rajekwesi Kalipare–Donomulyo road reconstruction project using the Precedence Diagram Method (PDM) and human resource optimization based on workload balancing and worker productivity. Employing a quantitative descriptive methodology with BoQ and technical drawings data, analysis via Microsoft Project and Excel evaluated three acceleration alternatives: (1) added equipment/workers, (2) extended work hours, and (3) simultaneous execution of similar tasks at three points. Results show the original 69-day duration can be reduced to 55 days (Alt 1), 64 days (Alt 2), and 67 days (Alt 3), but with cost increases from Rp2,437,614,513.92 to Rp2,604,160,281.51 (+6.83%), Rp2,536,240,546.97 (+4.05%), and Rp2,714,391,506.94 (+11.35%) respectively. The acceleration reduces duration yet raises costs, necessitating balanced consideration of time efficiency and budget constraints when selecting alternatives.</p> 2026-10-30T17:47:54+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23314 PENERAPAN Analytical Hierarchy Process (AHP), DALAM MENENTUKAN FAKTOR PENENTU PENINGKATAN BIAYA PADA PROYEK GEDUNG 2026-11-04T10:53:46+07:00 Alif Bintang Ramadhan bintang9073@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The construction project of the Faculty of Dentistry Building at Universitas Brawijaya experienced unexpected cost overruns due to various contributing factors. This study aims to identify the factors influencing these cost increases and to analyze their impact on the project. A quantitative research method was employed, utilizing the Analytical Hierarchy Process (AHP) approach, with data analysis performed using Expert Choice software. Data were collected through questionnaires distributed to respondents involved in the project. The findings reveal that the most significant factor contributing to the cost overrun is poor material procurement, which holds the highest weight of (0,144). As a mitigation strategy, it is recommended to conduct regular monitoring and evaluations at the project site to oversee the procurement, delivery, and utilization of materials to ensure alignment with project planning.</em></p> 2026-10-30T17:50:14+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23313 PENGARUH PENAMBAHAN LATEKS TERHADAP KARAKTERISTIK ASPAL PORUS DENGAN LIMBAH BETON SEBAGAI PENGGANTI AGREGAT KASAR 2026-11-04T10:53:53+07:00 Gunawan Julianto gunawanjulianto8@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>This study examines the effect of latex addition on porous asphalt using 100% recycled concrete waste as a coarse aggregate substitute. Porous asphalt was chosen for its high porosity, which helps reduce surface water pooling, while concrete waste was utilized to conserve natural aggregates, and latex was added to improve elasticity and bonding strength. Marshall characteristic tests were conducted, including stability, flow, VIM, VMA, VFA, and Marshall Quotient, with latex variations of 0%, 3%, 3.5%, 4%, and 4.5%. Results show that recycled concrete waste is feasible as a coarse aggregate. Latex addition improved several parameters, with 4% latex providing the highest stability and best overall mix characteristics, although VIM values did not meet the 18–25% specification. In conclusion, 4% latex is the most effective in enhancing the performance of porous asphalt made with recycled concrete waste, supporting sustainable and environmentally friendly road pavement development.</em></p> 2026-10-30T17:53:40+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23312 EVALUASI KERUSAKAN JALAN DAN RENCANA PENANGANANNYA PADA 6 RUAS JALAN DI KABUPATEN SERAM BAGIAN TIMUR DENGAN MENGGUNAKAN APLIKASI PKRMS (PROVINCIAL/KABUPATEN ROAD MANAGEMENT SYSTEM) 2026-11-04T10:54:09+07:00 Muhammad Ihsani Wansi ihsaniwansilie@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>East Seram Regency is one of the regencies located in Maluku Province. Bula City serves as the administrative center of this regency, resulting in high traffic volumes. Many road users do not comply with the designated road classifications, which leads to a decline in road quality and a reduction in pavement service life. Road damage is also caused by the lack of periodic maintenance due to budget constraints and insufficient human resources. East Seram Regency has a road network of 292.430 km, which supports regional economic activities. This study focuses on six road sections with a total length of 10.42 km, namely Waysamet Village Road, Wayakijaya Village Road, Waymatakabo Village Road, Pandopo Road, Englas Village Road, and Kampung Nelayan Road. The analysis was carried out using the Surface Distress Index (SDI), International Roughness Index (IRI), and the PKRMS (Provincial/Regency Road Management System) application, supported by survey data obtained through Blackvue video recordings. The results show that 82.53% of the roads are in good condition and 17.47% are in poor condition. The highest priority for treatment is the Waymatakabo Village Road, with a TPI value of 109.3, requiring a total budget of IDR 20,216,280,000.00. This study recommends planned improvements to support better road infrastructure.</p> 2026-10-30T17:57:38+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23311 PERENCANAAN STRUKTUR BAJA PADA GEREJA GBI KOTA AMBON DENGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS (SRPMK) 2026-11-04T10:54:22+07:00 Aulia Afdhal Rachman Auliaafdhalrachman@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study presents an alternative steel structure design for the GBI Church in Ambon City using the Special Moment Resisting Frame (SMRF) system to enhance earthquake resistance in high-seismic regions. The design follows SNI 1726:2019, SNI 1727:2020, SNI 1729:2020, and SNI 2847:2019, with structural analysis performed using ETABS 2021 and pile foundation bearing capacity and settlement evaluated through manual calculations and PLAXIS. The results show that inter-story drifts, base shear, and beam–column profile dimensions meet SMRF design criteria, while the foundation has adequate capacity and settlement within permissible limits. This design is expected to serve as a reference for earthquake-resistant building planning in seismic-prone areas.</p> 2026-10-30T18:00:29+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23310 PERBANDINGAN PERILAKU STRUKTUR KOLOM BERJENJANG DAN TIDAK BERJENJANG GEDUNG FMIPA UNIVERSITAS GADJAH MADA YOGYAKARTA 2026-11-04T10:54:33+07:00 Fernando Priatama nandotama99@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Yogyakarta is located in a high seismic risk zone, making earthquake-resistant structural design essential especially for multi-story educational buildings like the FMIPA UGM facility. This study compares two structural configurations: stepped columns and non-stepped columns, using the Special Moment Resisting Frame System (SMRFS) in accordance with SNI 1726:2019, SNI 1727:2020, and SNI 2847:2019. Structural analysis was conducted using ETABS software to evaluate key parameters such as fundamental period, base shear force, and inter-story drift. The results reveal that the stepped column configuration yields a shorter vibration period, lower base shear, and reduced inter-story drift compared to the non-stepped column structure. The maximum drift occurs on the 10th floor, with a difference of 19.19% in the X direction and 16.2% in the Y direction. These findings suggest that stepped columns enhance structural efficiency and seismic performance in multi-story buildings. Moreover, the stepped configuration may reduce structural damage and improve occupant comfort during seismic events. This research contributes valuable insights to the development of earthquake-resistant design strategies in disaster-prone regions, offering practical recommendations for engineers and designers seeking to optimize structural resilience and safety</em><em>. </em></p> 2026-10-30T18:06:06+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23309 STUDI PENELITIAN PENGARUH PENAMBAHAN VARIASI PERSENTASE AIR TERHADAP SIFAT MEKANIS DAN SIFAT FISIS BETON F’C 30 MPA PRODUKSI READY MIX 2026-11-04T10:54:47+07:00 Rafael Alexandro Djawa Nuwa exandj11@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The purpose of this research is to analyze the effect of adding variations of water percentage on the mechanical and physical properties of ready-mix concrete with a target strength of f’c 30 MPa. The additional water percentages used were 0%, 1%, 2%, 3%, and 4% of the planned water volume. The tests conducted included slump, compressive strength, modulus of elasticity, and porosity. This study employed an experimental method in the laboratory with cylindrical specimens measuring 15 cm × 30 cm. The results showed that adding up to 4% water generally increased the slump value, thereby improving the workability of concrete. However, this improvement was accompanied by a reduction in mechanical properties, where compressive strength recorded the largest decrease at the 4% variation, with a decline of 23.18% compared to the control condition. A similar trend was observed in the modulus of elasticity, which decreased by up to 11.47%. These findings indicate that additional water increases the water-cement ratio (w/c), leading to reduced concrete strength. On the other hand, the porosity value tended to increase but did not show a significant change, with an average of 0.1879% across all test specimens.</p> 2026-10-30T18:08:28+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23307 STUDI PENELITIAN PENGARUH FAKTOR AIR CEMENTITIOUS (W/C) TERHADAP KUAT TEKAN BETON GEOPOLIMER BERBASIS FLY ASH (AKTIVATOR : KALIUM HIDROKSIDA + NATRIUM HIDROKSIDA) 2026-11-04T10:54:58+07:00 Ivani Kristina Rambu Day Ndapanggau Vanindapanggau@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Concrete is one of the most widely used construction materials in infrastructure development. Along with the increasing awareness of the environmental impacts caused by the use of Portland cement, which produces high CO₂ emissions, geopolymer concrete has emerged as an eco-friendly alternative by utilizing fly ash as a binder, activated with Potassium Hydroxide (KOH) and Sodium Silicate (Na₂SiO₃). This study aims to analyze the effect of the water-to-cementitious ratio (W/C) on the compressive strength of fly ash–based geopolymer concrete and to evaluate the relationship between the water-to-cementitious ratio (W/C) ranging from 0.7 to 1.0 and the compressive strength. The variations of the W/C ratio used were 0,70; 0,75; 0,80; 0,85; 0,90; 0,95; and 1,0. The test specimens were cylindrical samples with dimensions of Ø15 × 30 cm. Compressive strength tests were carried out at the ages of 3 and 7 days under room-temperature curing. The results of this study indicate that an increase in the W/C ratio tends to decrease compressive strength. This suggests that the higher the amount of water or alkaline activator solution used in the mixture, the lower the resulting strength of the concrete.</p> 2026-10-30T18:11:04+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23306 STUDI ALTERNATIF PERENCANAAN STRUKTUR ATAS JEMBATAN TIPE PELENGKUNG (NETWORK TIED ARCH) PADA JEMBATAN DUPLIKASI LILIBA KOTA KUPANG 2026-11-04T10:55:07+07:00 Marsyan Antoneta Lanoe 2121106@scholar.itn.ac.id Ratri Andinisari aratri@lecturer.itn.ac.id <p>This research is an alternative design study for the superstructure of the Liliba Duplication Bridge in Kupang City. The existing bridge, which uses a Warren truss steel frame, is considered to have less aesthetic value, which is crucial for supporting tourism in East Nusa Tenggara (NTT). Additionally, the existing bridge has two supporting piers that are at risk of damage from lava flows during the rainy season. Based on these issues, the bridge was redesigned with a network tied arch steel construction suitable for long spans. This design also adopts the distinctive curved shape of the traditional musical instrument, the Sasando, as an aesthetic element to create a new landmark that strengthens NTT's cultural identity<sup>1111</sup>. The design was carried out using the Load and Resistance Factor Design (LRFD) method. Structural analysis and modeling were performed using the Midas Civil software. This design includes determining the dimensions of the floor slab, longitudinal girders, transverse girders, main girders, wind bracing, as well as cables, bolted connections, and seismic isolation bearings.</p> 2026-10-30T18:14:20+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23305 STUDI PENELITIAN PENGARUH PENAMBAHAN SERAT ALUMINIUM PADA BETON GEOPOLIMER BERBASIS FLY ASH BERDASARKAN SIFAT KARAKTERISTIK MEKANIS BETON 2026-11-04T10:55:18+07:00 Efrandy Umbu Pati Mbiliyora 2121104@scholar.itn.ac.id Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>This research aims to investigate the effect of aluminum fiber addition on the mechanical properties of fly ash–based geopolymer concrete. Geopolymer concrete is an eco-friendly material innovation that uses fly ash as a binder, thereby reducing dependency on conventional Portland cement. The study was conducted experimentally with aluminum fiber variations of 0%, 0.050%, 0.075%, and 1% of the total concrete volume. Each variation was tested for compressive strength, splitting tensile strength, and flexural strength at the ages of 7 days. The results indicate that the addition of aluminum fibers enhances the mechanical performance of geopolymer concrete compared to mixes without fibers. The optimum performance was achieved at 0.050% fiber content, which produced the most significant increase in compressive, splitting tensile, and flexural strength. However, adding more than 0.050% fibers tended to reduce strength due to uneven fiber distribution and the formation of air voids within the mixture. In conclusion, the use of aluminum fibers as an additive in fly ash–based geopolymer concrete effectively improves mechanical strength up to a certain optimum level. These findings are expected to provide an alternative solution for the development of sustainable and environmentally friendly construction materials with reliable structural performance.</em></p> 2026-10-30T18:17:31+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23304 STUDI PENELITIAN FAKTOR AIR CEMENTITIOUS (W/C) PADA BETON GEOPOLIMER BERBASIS FLY ASH TERHADAP KUAT TEKAN 2026-11-04T10:55:32+07:00 Said Ubaidillah Awad ubaidillahbamualim@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Geopolymer concrete is concrete that does not use portland cement, but a material rich in silica (SiO<sub>2</sub>) and alumina (Al<sub>2</sub>O<sub>3</sub>) that reacts with alkaline solutions such as potassium hydroxide (KOH) and sodium silicate (Na<sub>2</sub>SiO<sub>3</sub>) to form alternative cement binders. Various studies on geopolymer concrete have been conducted, but some still use the concept of the cementitious water factor (W/C) of normal concrete. Even though geopolymer concrete has different characteristics so that the use of the W/C factor of normal concrete is not appropriate. The W/C factor greatly affects the quality of concrete, especially in mix design. This study aims to provide further information on the effect of W/C variation on geopolymer concrete with a value of 0.70; 0,75; 0,80; 0,85; 0,90; 0,95; and 1. Compressive strength testing was performed at 3 and 7 days of age. The results on 3 days showed a decrease in compressive strength as the W/C increased, from 17.88 MPa (W/C 0.70) to 5.54 MPa (W/C 1). At 7 days of age, a similar pattern occurred, from 23.74 MPa (W/C 0.70) to 9.42 MPa (W/C 1). This proves that the greater the W/C value, the lower the compressive strength of the concrete, but as it ages, the strength of the concrete increases.</p> 2026-10-30T18:20:29+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23303 PENERAPAN MICROBIALLY INDUCED CALCITE PRECIPITATION PADA TANAH EKSPANSIF SERTA PENGARUHNYA TERHADAP NILAI KUAT GESER TANAH 2026-11-04T10:55:42+07:00 Aditiya Affandi Aditiyaaffandi@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Expansive clay soils exhibit high shrink–swell potential due to fluctuations in moisture content, which can compromise the stability and safety of civil engineering structures. One environmentally friendly ground improvement technology is <em>Microbially Induced Calcite Precipitation</em> (MICP), utilizing <em>Bacillus subtilis</em> bacteria to biologically produce calcium carbonate (CaCO₃) precipitates that enhance the physical and mechanical properties of soils. This study aims to evaluate the effects of varying bacterial content (3%, 6%, 9%, and 12% by dry soil weight) and curing periods (3, 7, 14, and 28 days) on the physical characteristics and shear strength of expansive clay soils. Laboratory tests included specific gravity, hydrometer analysis, liquid limit (LL), plastic limit (PL), plasticity index (PI), and mechanical tests such as <em>Direct Shear</em>, <em>Unconsolidated Undrained Triaxial Compression</em> (UU), and <em>Unconfined Compressive Strength</em> (UCS). The results indicate that MICP treatment significantly reduced PI values and enhanced shear strength parameters, including cohesion and internal friction angle. The highest improvement was achieved with 12% bacterial content and 28 days of curing, producing the greatest increase in cohesion and shear strength compared to other variations. These findings demonstrate that MICP is an effective method for improving expansive clay soils by simultaneously increasing shear strength and reducing shrink–swell potential, making it a promising solution for construction projects in regions with similar problematic soil conditions.</p> 2026-10-30T18:25:01+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23302 STUDI PENELITIAN FAKTOR AIR CEMENTITIOUS PADA BETON GEOPOLIMER BERBASIS FLY ASH (BATU BARA) BERDASARKAN KUAT TEKAN 2026-11-04T10:55:53+07:00 Fridolin A. M. A. Sani Naitkakin saniarthur05@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Fly ash based geopolymer concrete is an environmentally friendly alternative that can replace conventional Portland cement based concrete. This study aims to analyze the effect of the water cementitious (W/C) ratio on the compressive strength of Type C fly ash based geopolymer concrete from the Paiton Power Plant, as well as to determine the correlation between the water cementitious ratio and the concrete's compressive strength. The variations of the water cementitious ratio used were 0,35, 0,4, 0,45, 0,5, 0,55, 0,6, and 0,65. The alkaline activator used consisted of 8 M potassium hydroxide (KOH) and sodium silicate (Na₂SiO₃) with a ratio of 3:1. The test specimens, in the form of concrete cylinders (Ø15 cm × 30 cm), were tested at the ages of 3 and 7 days using the room temperature curing method. The results show that the compressive strength of the geopolymer concrete decreases with the increase of the water cementitious (W/C) ratio. At 3 days, the highest compressive strength of 28,42 MPa was achieved at a W/C of 0,35, while the lowest was 17,94 MPa at a W/C of 0,65. At 7 days, the highest compressive strength reached 37,13 MPa (W/C 0,35) and the lowest was 23,89 MPa (W/C 0,65). The concrete slump value increased with the increase in the W/C ratio, with the highest value of 18,4 cm at a W/C of 0,65. The test results conclude that the water cementitious (W/C) ratios of 0,35, 0,4, 0,45, 0,5, 0,55, 0,6, and 0,65 have a significant effect on the compressive strength of geopolymer concrete, where a higher water cementitious (W/C) ratio results in lower compressive strength..</p> 2026-10-30T18:27:11+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23301 STUDI PERBANDINGAN PENGARUH VARIASI BENTUK LENGKUNG TERHADAP STABILITAS STRUKTUR JEMBATAN PELENGKUNG STUDI KASUS MODEL KOMPETISI JEMBATAN INDONESIA XIX TAHUN 2024 2026-11-04T10:56:01+07:00 Legat Bestari bestarilegat2@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Arch bridges represent a widely favoured structural form, celebrated for their inherent efficiency and aesthetic appeal. Variations in arch geometry, such as circular and parabolic shapes, exert a significant influence on both the structural stability and load distribution within the design.&nbsp; This research endeavours to conduct a comparative analysis of how distinct arch geometries—specifically circular and parabolic—impact the structural stability of arch bridges. The investigation centres on a case study utilising a model arch bridge from the 19th Indonesian Bridge Competition (KJI) in 2024. The methodology employed involves structural analysis facilitated by SAP2000 v.24 software, adhering strictly to the guidelines set forth by KJI XIX 2024 and SNI 1729:2020 for comprehensive evaluation. Key parameters subjected to analysis included internal forces, stress, strain, deflection, and material efficiency. The analytical findings reveal that the bridge model incorporating a parabolic arch demonstrates superior performance. While the maximum axial forces in the arch rib and hangers were higher in the parabolic model, this model exhibited substantially lower bending moments in the arch rib (45.36 kNmm) and longitudinal girder (32.55 kNmm) when compared to the circular arch model (86.51 kNmm and 87.41 kNmm). Furthermore, the maximum deflection observed in the parabolic model (1.75 mm) was notably less than that of the circular model (2.21 mm). In terms of material consumption, the parabolic arch bridge model proved more efficient, with a total weight of 19.19 kg, making it 51.9% lighter than the circular arch bridge model, which weighed 37 kg. In conclusion, the parabolic arch form imparts enhanced structural stability and greater material efficiency, proving more effective in channelling loads primarily into pure compressive forces, thereby mitigating overall bending moments and deformations.</p> 2026-10-30T18:29:46+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23300 ANALISIS HUBUNGAN KINERJA SIMPANG TERHADAP EMISI GAS BUANG KENDARAAN BERMOTOR PADA JALAN SIMPANG BERSINYAL DI KOTA BANJARMASIN 2026-11-04T10:56:15+07:00 Muhammad Aldi Alhafiz aldi.alhafiz28@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>One of the locations in Banjarmasin City that experienced traffic problems based on observations in the field was the intersection of the Pioneers of Independence. As for air pollution produced by motor vehicle fumes. With the increase in traffic congestion, it certainly hurts increasing air pollution and causing global warming. To improve the performance of the signaled intersection, it is necessary to analyze, evaluate, and model so that alternative solutions for repairing the intersection are obtained. Analysis and evaluation were conducted based on PKJI 2023 and modeling using VISSIM. To determine the relationship between intersection performance, it is necessary to analyze and model the relationship between variables. The analysis is carried out based on ISPU and regression correlation to obtain a relationship model. The analysis of the performance of the existing signaled intersection with PKJI 2023 obtained an average delay of 81.93 sec/smp with service level F. From the analysis of the value of CO and NO<sub>2</sub> gas concentrations classified as pollution in the good category, which is between the numbers in the range of 1-50 with a value of 12.99 μg/m<sup>3</sup> and 17.15 μg/m<sup>3</sup> on Monday. From the results of the study, there is a very strong correlation between the two variables. The alternative chosen by changing the signal phase to 3 phases and prohibiting right turns obtained an average delay of intersection 32.16 sec/smp with service level D. So that it can be known the prediction of the concentration value of pollutant parameters with the regression equation, CO 15.359 (32.16) – 14.896 in the CO concentration value of 479.049 μg/m<sup>3</sup>. As for NO<sub>2</sub> 0.4959 (32.16) – 6.5867 in the NO<sub>2</sub> concentration value of 9.361 μg/m<sup>3</sup>.</em></p> <p><em>&nbsp;</em></p> 2026-10-30T18:33:42+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23299 Evaluasi Fasilitas Parkir Pada Mall Olympic Garden Kota Malang 2026-11-04T10:56:26+07:00 Yosua Putra Yusuf The yosuaputra520@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Malang City Olympic Garden Mall is one of the malls in Malang City which is often visited by visitors. The location of the Olympic Garden Mall, Malang City itself is very strategic so many visitors flock to the area. Apart from the Mall, there are also several other areas such as the swimming pool area, sports center, hotel, which is still in the same area as the Olympic Garden Mall, Malang City. The aim of this study was to be able to analyze the characteristics and parking needs in the Olympic Garden Mall area, Malang City, using the interview survey method and parking duration survey during the three days of observations carried out. This survey data consists of the results of answers from respondents conducted at the study location and the results of parking characteristics in the parking duration survey. From the results of observations made in the Olympic Garden Mall area, Malang City, it is still unable to accommodate existing vehicles. From the results of the interviews conducted, there was quite a large movement attraction to the Olympic Garden Mall, Malang City with a percentage of 55.7%, even vehicles that used the parking area at the Gajayana Stadium parking area but their travel destination was to the Olympic Garden Mall, due to the Olympic Mall parking area. The Garden itself still lacks parking space. The lack of parking areas has an impact on traffic flow on Jln. Tenes, due to the shoulder of Jln. Tenes is used as a parking area for two-wheeled vehicles heading to MOG. From the observations, it was found that the parking space requirement in the MOG area is 966 m2 for four-wheeled vehicles and 331.5 m2 for two-wheeled vehicles. Due to the lack of parking area, it is necessary to build a multi-storey parking building in the Gajayana Stadium parking area to provide sufficient parking area in the Olympic Garden Mall Area, Malang City.</p> 2026-10-30T18:35:35+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23298 ANALISA KONDISI RUAS JALAN BTS. KAB. GRESIK – MLIRIP KABUPATEN MOJOKERTO DAN PENANGANANNYA 2026-11-04T10:56:41+07:00 IVAN TSALAATSA ANDIKA ivantsandika3@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This road experienced some damage, including cracks and surface defects due to patches, making it very disturbing for passing road users. With these road conditions, an assessment is needed as a reference to determine the type of treatment program that will be implemented. The total length of the road section is 7.3 km and the one to be analyzed is 3.3 km with an average road width of 7 m and is a class III road. The method used to analyze the level of road damage and the type of treatment uses the IKP (Pavement Condition Index) and IRI (International Roughness Index) methods. And in this study, calculate the budget plan for damage handling costs. Based on the results of the analysis of road condition assessment using the Pavement Condition Index Method (IKP) and the International Roughness Index (IRI) method, it can be seen that the condition of road damage and its handling is STA 4+600 – 4+800.5+400 – 6+000,6+400 – 7+300 indicates good to fair road conditions, so routine and periodic maintenance is carried out including filling asphalt gaps. STA 4+400 – 4+600, STA 4+800 – 5+400 and STA 6+ 000 – 6+400 indicates the road condition is damaged, then rehabilitation is carried out including pavement resurfacing. STA 4+000 – 4+400 indicates the road condition is very damaged, so reconstruction is carried out including pavement resurfacing. Total budget plan (RAB) required for handling damage repairs on Bts roads. Gresik District - Mlirip is IDR 4,302,124,000.</p> 2026-10-30T00:00:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23297 STUDI ALTERNATIF PERENCANAAN STRUKTUR GABLE FRAME DENGAN BAJA CASTELLA (HONEY COMB) PADA BANGUNAN GUDANG PABRIK PLASTIK KOTA PASURUAN 2026-11-04T10:56:54+07:00 Rito Arman Muzaqi 1921183.ritoarmanmuzaqi@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The increasing prominence of warehouse businesses, it urges investors or owners to rapidly expand their operations, requiring a warehouse that possesses adequate efficiency for warehousing activities. It is anticipated that by employing the Castella steel beam system, rigidity can be added to the beams, enabling them to bear greater spans. Through the employment of a portal gable frame with a larger span, it becomes possible to maximize the spatial requirements for warehouse activities such as loading and unloading of goods. Furthermore, the Castella beams are chosen as an alternative, aiming to attain a higher load-bearing capacity compared to H or WF profiles used in existing building structures.In this planning, analysis is conducted using the LRFD method. Additionally, for load analysis, the calculated values are assessed using the CSI ETABS software to obtain values for moments, lateral forces, and axial forces. This process leads to the derivation of structural calculations and planning drawings. From the outcomes of this planning, the steel profiles used for columns are WF 400.400.13.21, and for beams, Castella steel 600.200.8.13 is utilized, with an initial profile size of WF 400.200.8.13. Supported by the substructure, the column pedestal measures 500 x 500, the tie beam measures 350 x 500, the pile cap measures 1500 x 1000 x 400 with a depth of 1.0 m, and the precast mini-piles have dimensions of 250x250 with a depth of 9.0 m.</p> 2026-10-30T18:42:37+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23296 PENAMBPENAMBAHAN LIMBAH KALENG ALUMUNIUM PADA CAMPURAN BETON TERHADAP KARAKTERISTIK MEKANIS BETON 2026-11-04T10:57:02+07:00 Kukuh Setia Ali Prasongko 1921168.kukuhsetiaaliprasongko@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Advances in concrete technology have led to several advances in concrete manufacturing. Concrete materials that are made stronger, especially in terms of tensile strength, can be added by adding fiber additives to the concrete mixture. One of the fiber materials that can be added to the concrete mix is aluminum can waste. Utilization of these waste materials can produce construction materials that are strong and green building in nature. This study aims to determine the effect of adding aluminum can fiber to the concrete mixture on the mechanical characteristics of concrete (compressive strength, split tensile strength, and flexural tensile strength). Concrete testing carried out refers to the design quality fc' 20MPa. Variations in the addition of spiral-shaped aluminum fiber with a size of 2 x 20mm are 0%, 0.05%, 0.075%, 0.1% and 0.125% of the concrete volume. All samples were tested when the concrete was 28 days old. From the results of the research on aluminum can fiber mixed concrete, the optimum value for concrete compressive strength was 0.066% with a value of 21.33 MPa, split tensile strength of 0.067% with a value of 7.85 MPa, and flexural tensile strength of 0.070% with a value of 6.17 MPa. The hypothetical test proves that there is an effect of using aluminum can fiber on fibrous concrete.</p> 2026-10-30T18:44:32+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23295 ANALISA PEMERATAAN SUMBER DAYA TENAGA KERJA PADA PROYEK PRESERVASI JALAN WARU-SIDOARJO-KRIAN 2026-11-04T10:57:11+07:00 Gigih Gilang, Andrian Firdaus gigih.gilang@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>A construction project is a series of activities that require time, money and resources. Resources in the form of people, tools and materials. If these resources are used, if the allocation is not regulated, then the use of these resources is very inefficient, thereby reducing the critical path of the resulting network. The allocation of resources is carried out with the hope that the use of labor resources will be evenly distributed and not too many labor resources are invested. This method of resource allocation can reduce fluctuations in labor input in projects. In this study used a quantitative approach. The quantitative approach is a type of research that is carried out in a structured, planned and systematic manner from the start to the creation of the research design. From the results of the even distribution of masonry that has been carried out, resulting in the use of labor having an ideal graph. Thus, there are differences in labor requirements and duration before and after leveling, namely: Before leveling: duration of 243 days the peak number of workers is 100 masons and at least 31 masons. After leveling: duration of 310 days with a peak workforce of 100 masons and at least 40 masons. The difference between the duration of the project after and before the equal distribution of labor is 70 days.</em></p> 2026-11-02T19:17:54+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23294 PERENCANAAN SAMBUNGAN LAS PADA RANGKA BAJA PIPA JEMBATAN SAWANGAN NIKKO-BALI TIPE PELENGKUNG 2026-11-04T10:57:22+07:00 I Wayan Reditya Candra Wibawa 1921109@scholar.itn.ac.id Ratri Andinisari aratri@lecturer.itn.ac.id <p>The bridge has a function as a supporting infrastructure to connect between cities and regions, besides that the bridge also functions as an icon of the area or city itself when viewed from an architectural perspective. A bridge with an arch type steel frame is the topic of selection in an alternative study on the superstructure planning of the Sawangan Nikko-Bali Bridge, because this type of bridge has a span length of 100 meters with a vehicle floor width of 9.65 meters using PCI Girder concrete construction with 2 concrete pillars in the middle. Based on this, the alternative planning study will choose a steel pipe frame arch type bridge with a height of 20 meters, a bridge width of 9 meters, and a bridge length of 120 meters. Planning using the DFBT (Load Factor and Endurance Design) method, 3D structural analysis modeling the superstructure of the bridge using SAP 2000 v21 software, and the latest SNI as a reference for bridge structure planning. The results of the planning that has been done, used WF profiles 350 × 175 × 7 × 11 for elongated girders, WF profiles 800 × 300 × 14 × 26 for transverse girders, Box profiles 800 x 600 x 30 x 30 for edge elongated main girders, profiles Pipe 610 x 548 x 30.9 for lower and upper arch main girder, Pipe profile 406 x 364 x 21 for vertical and diagonal main girder, Pipe profile 356 x 318 x 19 for upper transverse girder, Pipe profile 273 x 238 x 17, 49 For wind ties over the cable, the hanger uses a D60 mm Tension Rod. The dimensions for elastomeric bearings on the edge of the main girder are 400 × 400 × 120 and 500 × 500 × 155 for the arch main girder.</p> <p>&nbsp;</p> 2026-11-02T19:20:48+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23293 PERENCANAAN PENGENDALIAN BANJIR PADA SUNGAI BENGAWAN SOLO DESA NGADIREJO KEC. RENGEL KAB. TUBAN, JAWA TIMUR 2026-11-04T10:57:38+07:00 Adimas Hariyanto sipil1921134.adimashariyanto@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This planning aims to determine the maximum design flood discharge and to plan the safe dimensions of the embankment to control flooding at the location. The Bengawan Solo River plays an important role for the community, but its overflow often poses a flood threat, especially in Ngadirejo Village, Rengel District, Tuban Regency. The major flood that occurred in February 2025 resulted in inundation up to 0.5 – 0.7 meters deep, submerging more than 800 hectares of rice fields and disrupting road access and educational facilities. The planning methodology includes hydrological analysis using rainfall data from the Rengel, Maibit, and Klotok Stations for the period 2015 – 2024. The planned flood discharge analysis was calculated using the Nakayasu Synthetic Unit Hydrograph (HSS) method. Hydraulic analysis was conducted to evaluate the river cross-section capacity, and the stability of the embankment slope was tested using the Bishop method. The analysis results show the planned flood discharge using the Nakayasu Synthetic Unit Hydrograph (HSS) method, which are 9555 m³/second for a 2-year return period, 10965 m³/second for a 5-year return period, 12205 m³/second for a 10-year return period, and 13232 m³/second for a 25-year return period. Based on the flow profile simulation, several cross-section points were found to experience overflow at certain return period discharges. The mitigation planning was carried out by constructing a dam, where the stability test results using the Bishop method showed a factor of safety (FS) value &gt; 1.25. Thus, the dam construction is declared safe and stable.</p> 2026-11-02T23:35:33+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23292 PENGEMBANGAN SISTEM DISTRIBUSI AIR BERSIH DI KECAMATAN KARANGPLOSO KABUPATEN MALANG 2026-11-04T10:57:51+07:00 Eristanto Ananta 142101.eristantoananta@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Clean water distribution in Karangploso Sub-district, Malang Regency, has not fully reached all residents; only about 42% of the population is currently served by the local water utility (PDAM), leaving Donowarih, Tawangargo, Bocek, and Ngenep villages unserved. This study aims to plan the development of a clean water distribution system by utilising the Cinde spring as the raw water source. Population projection was carried out using the arithmetic, geometric, and least square methods, with the geometric method selected based on the smallest standard deviation (4,762.44). Water demand analysis followed the Ministry of Public Works standard, while the transmission and distribution pipe networks were modelled using WaterCAD V8i. The results show that the total clean water demand in Karangploso Sub-district up to the year 2029 reaches 151.46 litres/second, and the available discharge of the Cinde spring (156 litres/second) is still sufficient to meet this demand. The planned reservoir capacity is 1,712.06 m3 with dimensions of 21 m x 20 m x 4 m, the transmission pipe is 11,475 m long with a diameter of 642.2 mm, and the distribution pipe is 58,771 m long with a diameter of 285 mm. Flow velocities and residual pressures at all network nodes meet the requirements of Minister of Public Works Regulation No. 18/PRT/M/2012.</em></p> 2026-11-02T23:41:30+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23291 STUDI ALTERNATIF PERENCANAAN STRUKTUR BAJA PADA GEDUNG FAKULTAS ILMU KOMPUTER BRAWIJAYA MENGGUNAKAN SISTEM RANGKA BAJA EKSENTRIS TIPE V TERBALIK 2026-11-04T10:58:04+07:00 Yohanes Prandoxa Waja bramwaja@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><strong>&nbsp;</strong></p> <p>In this plan, the Faculty of Computer Science building at Brawijaya University is designed using a steel structure with the application of an inverted V-type Eccentrically Braced Frame System. The materials used include Wide Flange steel for columns and beams, and Canal C for the bracing structure, while the structural slab is planned to use conventional concrete. The standards used as a guideline include SNI 1729-2020, SNI 7860-2020, SNI 1727-2020, SNI 1726-2019, SNI 7972-2020, and SNI 8460-2017. The data used consists of design drawings and soil data, which then serve as the basis for the preliminary calculation of structural elements. A 3D structural analysis was conducted using the ETABS 22 software, from which the following dimensions were obtained: column WF 572 x 500 x 50 x 60 mm, beam WF 400 x 300 x 11 x 18 mm and WF 340 x 250 x 9 x 14 mm, with ASTM A572 grade 50 steel specifications.</p> 2026-11-02T23:49:54+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23290 OPTIMASI DAN ANALISIS RISIKO JADWAL PADA EFISIENSI WAKTU PELAKSANAAN PROYEK REKONSTRUKSI JALAN 2026-11-04T10:58:10+07:00 Fika Famungkas vicahansamu@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This study analyzes time optimization and schedule delay risk in the Sawo–Gambiran road reconstruction project by integrating the Program Evaluation and Review Technique (PERT), work dependency relationships, and the S-Curve method. The research data were obtained from MC100 reports, planned S-Curve data, and three-time estimates collected from expert respondents. The revised results indicate that the predecessor relationships must follow field execution patterns that operate in a segmental parallel workflow. The revised critical path is K1–K5–K8–K7–K12–K11–K18, consisting of mobilization, ordinary excavation, Class B aggregate base course, Class A aggregate base course, asphalt binder course (AC-BC), asphalt wearing course (AC-WC), and thermoplastic road marking. The planned S-Curve shows project completion at week 26, while the PERT-based expected time S-Curve reaches 100% completion at week 24. Thus, there is a potential time efficiency of 2 weeks or 7.69% compared to the planned duration. The stone masonry work (K17) remains a high-risk activity due to its expected time and large weight contribution, although it is not part of the main critical path of pavement works. These findings confirm that project control should focus on critical activities, high-weight activities, and high-variance activities to minimize schedule deviation from the early stages.</p> 2026-11-02T23:52:33+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23289 STUDI PENELITIAN PADA BETON GEOPOLIMER BERSERAT BENDRAT BERDASARKAN KUAT TEKAN BETON, KUAT TARIK BELAH DAN KUAT TARIK LENTUR 2026-11-04T10:58:21+07:00 Clara Liberty Nona Vilian nona claralibertynona@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Geopolymer concrete is used an environmentally friendly alternative to Portland cement, by utilizing fly ash type C from Paiton PLTU as a binder and a mixture of Potassium Hydroxide (KOH) and Sodium Silicate (Na2SiO3) as an activator solution. This study aims to analyze the effect of the addition of bendrat fiber on the mechanical properties of geopolymer concrete, especially compressive strength splitting tensile strength, and flexural tensile strength. The variations in the bendrat fiber content used were 0%, 0,5%, 1%, and 1,5% of the concrete mixture volume. Testing was carried out at the age of 7 days of concrete with a curing process at room temperature, using cylindrical test specimens measuring Ø15x30 cm for compressive and splitting tensile strength tests, and 15x15x60 cm beams for flexural strength tests. The results showed that the addition of bendrat fiber had a significant effect on increasing the mechanical properties of geopolymer concrete. The highest compressive strength value was obtained at 1,5% fiber variation with an average of 46,56 MPa, an increase from 26,63 MPa in concrete without fiber. Splitting tensile strength also increased from 2,53 MPa to 3,73 MPa, while flexural strength increased from 6,47 MPa to 7,02 MPa at the same fiber content. Regression analysis showed a positive relationship between increasing fiber content and concrete mechanical strength up to an optimum limit of 1,5%. Therefore, the use of 1,5% bendrat fiber is recommended as the most effective composition for improving the mechanical performance of geopolymer concrete without compromising the workability of the mixture.</em></p> 2026-11-02T23:58:10+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23288 STRATEGI ANALISIS RISIKO WAKTU PROYEK KONSTRUKSI DENGAN METODE CPM DAN PERT PADA PROYEK INFRASTRUCTURE CAMP AND WORKSHOP FACILITY PT PETROSEA TBK SITE PT MULTI TAMBANGJAYA UTAMA 2026-11-04T10:58:32+07:00 Ferdy Catur Pamungkas ferdycaturp@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p style="text-align: justify; text-justify: inter-ideograph; line-height: 150%;">The success of a construction project is highly dependent on effective schedule control, as project delays may lead to cost overruns, reduced productivity, and failure to achieve project objectives. This study aims to analyze schedule-related risks and evaluate project scheduling performance in the Infrastructure Camp and Workshop Facility Project of PT Petrosea Tbk at PT Multi Tambangjaya Utama Site using the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT). The CPM was employed to identify critical activities and determine the project's critical path, while the PERT method was used to analyze uncertainty in activity durations based on optimistic, most likely, and pessimistic time estimates. This research adopted a quantitative approach utilizing primary data obtained through field observations and interviews, as well as secondary data including the project schedule, S-curve, and project execution documents. The CPM analysis identified the critical path consisting of mobilization, site clearing, foundation works, steel structure erection, wall and roofing works, mechanical, electrical, and plumbing (MEP) installation, finishing works, and commissioning, resulting in a total project duration of 167 days. Furthermore, the PERT analysis estimated an expected project duration of 171.34 days, with a 96.6% probability of completing the project within the contractual target of 180 days. The dominant schedule risks identified include adverse weather conditions, material procurement delays, low labor productivity, heavy equipment breakdowns, and design changes during project execution. Recommended mitigation strategies include accelerating critical-path activities, implementing resource leveling, applying fast-tracking and crashing techniques, improving supply chain coordination, and incorporating schedule buffers. The findings demonstrate that the integration of CPM and PERT enhances schedule planning accuracy, improves time control effectiveness, and minimizes the risk of project delays, thereby increasing the likelihood of successful project completion within the planned schedule.</p> 2026-11-03T00:02:43+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23287 PERENCANAAN PENGENDALIAN BANJIR PADA SUNGAI BENGAWAN SOLO DESA NGADIREJO KEC. RENGEL KAB. TUBAN, JAWA TIMUR 2026-11-04T10:58:49+07:00 Adimas Hariyanto sipil1921134.adimashariyanto@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>This planning aims to determine the maximum design flood discharge and to plan the safe dimensions of the embankment to control flooding at the location. The Bengawan Solo River plays an important role for the community, but its overflow often poses a flood threat, especially in Ngadirejo Village, Rengel District, Tuban Regency. The major flood that occurred in February 2025 resulted in inundation up to 0.5 – 0.7 meters deep, submerging more than 800 hectares of rice fields and disrupting road access and educational facilities. The planning methodology includes hydrological analysis using rainfall data from the Rengel, Maibit, and Klotok Stations for the period 2015 – 2024. The planned flood discharge analysis was calculated using the Nakayasu Synthetic Unit Hydrograph (HSS) method. Hydraulic analysis was conducted to evaluate the river cross-section capacity, and the stability of the embankment slope was tested using the Bishop method. The analysis results show the planned flood discharge using the Nakayasu Synthetic Unit Hydrograph (HSS) method, which are 9555 m³/second for a 2-year return period, 10965 m³/second for a 5-year return period, 12205 m³/second for a 10-year return period, and 13232 m³/second for a 25-year return period. Based on the flow profile simulation, several cross-section points were found to experience overflow at certain return period discharges. The mitigation planning was carried out by constructing a dam, where the stability test results using the Bishop method showed a factor of safety (FS) value &gt; 1.25. Thus, the dam construction is declared safe and stable.</p> 2026-11-03T00:06:34+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23286 EVALUASI KINERJA SIMPANG BERSINYAL DAN PREDIKSI BIAYA OPERASIONAL KENDARAAN (BOK) AKIBAT KEMACETAN LALULINTAS 2026-11-04T10:59:04+07:00 Andy Rachmad Wicaksono andyrachmad07@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; text-justify: inter-ideograph; margin: 0in 0in 6.0pt 0in;"><span lang="EN-GB">The signalized three-leg intersection of Tlogomas Road – Tunggul Mas Road in Malang City is one of the congestion-prone locations due to high traffic volumes and intensive educational and commercial activities in the surrounding area. Traffic congestion at this intersection results in reduced intersection performance and increased vehicle operating costs (VOC). This study aims to evaluate the performance of the signalized intersection and to analyze VOC losses caused by traffic delays. Intersection performance analysis was conducted using the Indonesian Highway Capacity Guidelines (PKJI) 2023, with performance indicators including traffic volume, degree of saturation, queue length, delay, and level of service. Traffic modeling and simulation were performed using PTV VISSIM to validate the analytical results and to assess improvement alternatives. The results indicate that the existing condition of the intersection exhibits a high degree of saturation, excessive delays, and long queues exceeding the recommended service standards, resulting in poor levels of service. These conditions lead to increased fuel consumption and significant vehicle operating cost losses. Improvement alternatives involving signal cycle time optimization and geometric modifications were found to effectively reduce delays and queue lengths while improving the level of service of the intersection. Therefore, the proposed improvement measures can be considered an effective solution to enhance intersection performance and reduce vehicle operating cost losses caused by traffic congestion. </span></p> 2026-11-03T00:10:05+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23285 ANALISIS MODEL HUBUNGAN KINERJA SIMPANG TIGA JEMBATAN SOEKARNO-HATTA TERHADAP KUALITAS UDARA KOTA MALANG 2026-11-04T10:59:21+07:00 Yehezkiel Aldisurya Pratama Siren yehezkielaldisuryapratama07@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Signalized intersections play an important role in urban road networks and significantly affect traffic performance and environmental conditions. The signalized three-leg intersection at Soekarno-Hatta Road, Malang City, experiences high traffic volumes, particularly during peak hours, which potentially leads to congestion and increased vehicle emissions. This study aims to analyze the relationship between the performance of a signalized three-leg intersection and the surrounding air quality. The research method involved field surveys to obtain traffic volume data, intersection geometric conditions, and air pollutant concentrations. Intersection performance was analyzed using the Indonesian Highway Capacity Guidelines (PKJI) 2023, focusing on the degree of saturation, delay, and level of service. Air quality analysis was conducted based on carbon monoxide (CO) and nitrogen dioxide (NO₂) concentrations using the Air Pollution Standard Index (ISPU) 2020. The results indicate that during peak hours, the intersection experiences a high degree of saturation and a low level of service, resulting in increased delays and vehicle queues. These conditions contribute to higher concentrations of CO and NO₂ in the study area. It can be concluded that a decrease in intersection performance has a direct impact on the deterioration of air quality. Therefore, traffic engineering measures and signal optimization are required to improve intersection performance and reduce the impact of air pollution.</p> 2026-11-03T00:13:16+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23284 EVALUASI KINERJA SIMPANG EMPAT BERSINYAL DAN PREDIKSI KERUGIAN BIAYA OPERASIONAL KENDARAAN (BOK) AKIBAT KEMACETAN LALU LINTAS 2026-11-04T10:59:29+07:00 Alvieano Geraldy Faizal alvinfaizal241@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Traffic congestion is a common problem that often occurs in various areas, including at the Gedangan Sidoarjo frontage intersection, which involves station activities and industrial areas, with one of the critical points located at the Gedangan Sidoarjo Frontage Junction at the meeting point of Jl. Frontage Gedangan Utara and Jl. Frontage Gedangan Selatan. This condition causes traffic delays that impact increased Vehicle Operating Costs (VOC), particularly Fuel Consumption Costs (FCC). This study aims to analyze traffic performance at the intersection and estimate the cost losses due to congestion using the 2023 Indonesian Road Capacity Guidelines (PKJI) and traffic modeling via VISSIM 25 software, where fuel consumption calculations refer to the LAPI-ITB method and the relationship between delay and FCC is analyzed using simple linear regression. The PKJI 2023 analysis results indicate that delays The average intersection delay at the North, East, and West approaches was 153 sec/veh, 69 sec/veh, and 43 sec/veh, respectively, with corresponding levels of service of F, F, and D, while VISSIM 25 simulation results showed an average delay of 135 sec/veh at the north approach (LOS F), 69 sec/veh at the east approach (LOS F), and 69 sec/veh at the south approach (LOS F). The economic losses due to traffic delays amounted to IDR 891,383.74 per hour, IDR 7,131,069.90 per day, IDR 185,407,817.39 per month, and IDR 2,260,549,158.21 per year, and linear regression analysis showed a very strong relationship between delay and fuel consumption costs with a correlation coefficient of 0.9529, confirming that increased delay has a significant implication on the magnitude of economic losses due to congestion.</p> 2026-11-03T00:20:35+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23283 PENGARUH PENGGUNAAN MATERIAL BATU KARANG LOKAL KOTA KUPANG DENGAN PENAMBAHAN SERBUK BAN KARET SEBAGAI MATERIAL ASPAL AC-BC TERHADAP KARAKTERISTIK MARSSAL 2026-11-04T10:59:41+07:00 Yosep Brandisma Lio yosepbrandisma@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Highways are vital transportation infrastructure for connecting regions and supporting economic movement. In Kupang City, the potential for using local coral stone as an alternative aggregate for AC-BC asphalt mixtures is quite large, combined with the use of waste tire rubber powder to improve mixture performance. This research aims to determine the Marshall characteristics of the AC-BC mixture using local Kupang coral stone and the addition of tire rubber powder. The methodology follows the 2018 Bina Marga General Specifications. The results of the Marshall test for determining the Optimum Asphalt Content (KAO) were obtained at 5.56%. At this KAO, the control mixture (0% tire rubber) produced a stability of 1963.71 kg, flow of 3.27 mm, VIM 5.82%, VMA 19.10%, VFA 69.57%, and MQ 635.55 kg/mm. Variations in tire rubber powder (1%, 3%, 6%, 9%) were further analyzed to observe their impact on the mixture's durability and performance.</p> 2026-11-03T00:47:13+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23282 STUDI PENELITIAN PADA BETON GEOPOLIMER BERBASIS FLY ASH DENGAN PENAMBAHAN SERAT PLASTIK PET TERHADAP SIFAT MEKANIK BETON 2026-11-04T10:59:52+07:00 Donatus Tersin Dugis donatusdugis@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Geopolymer concrete is an inorganic aluminosilicate compound synthesized from industrial by-products such as fly ash and rice husk ash that contain silica (Si) and aluminum (Al), where fly ash has significant potential as an alternative material due to its abundant availability and low cost, while also reducing the environmental impact caused by Portland cement, which produces high CO₂ emissions; the use of PET (Polyethylene Terephthalate) plastic fibers derived from recycled waste is an alternative to reduce production costs and plastic waste, and this study analyzes the effect of PET fiber additions of 0%, 0.2%, 0.5%, and 0.7% on the compressive strength, splitting tensile strength, and flexural strength of fly ash–based geopolymer concrete, with results indicating that fiber addition reduces compressive strength, while splitting tensile strength and flexural strength increase at 0.2% fiber content, reaching average values of 2.72 MPa and 7.51 MPa, respectively.</p> 2026-11-03T00:51:15+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23281 PENERAPAN METODE PERT PADA PENJADWALAN PEMBANGUNAN TUGU ALUN-ALUN KOTA MOJOKERTO 2026-11-04T11:00:00+07:00 Ricky Dwi Purwo Ngestiaji rickydpn16coach@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>East Java Province consists of approximately 38 cities and regencies, each with iconic buildings that rep square as a symbol of the city. However, the construction process encountered delays, leading to increased resent their regional identity. One example is Mojokerto City, which constructed a monument in the town time and costs for project execution. These issues can be minimized through better work planning, one of which involves the application of the PERT (Program Evaluation and Review Technique) method. PERT uses a probabilistic approach with three time estimates to anticipate delays and align the project schedule. The scheduling evaluation using the PERT method indicates that the work could be completed in 112 days, compared to the existing duration of 180 days. The estimated 112-day duration has a completion probability of 65%.</em></p> 2026-11-03T00:58:59+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23278 STUDI ALTERNATIF PERENCANAAN STRUKTUR ATAS BANGUNAN GEDUNG FAKULTAS ILMU KOMPUTER UNIVERSITAS BRAWIJAYA MENGGUNAKAN SISTEM GANDA (DUAL SYSTEM) 2026-11-04T11:00:07+07:00 Yanuarius Seke yanuariuseke@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>In this planning, the Brawijaya Computer Science Building is designed using a dual system, namely a combination of the SRPMK structural system and shear walls. The standards used as guidelines include SNI 1727-2020, SNI 1726-2019, SNI 2847-2019, and SNI 2025-2017. The data used in the calculations consists of planning drawings and soil data, which then serve as the basis for preliminary calculations of structural elements. 3D Structural Analysis was performed using ETABS 18 software, from which the column dimensions were 950 x 950 mm2, the main beams consisted of B1 400X600 B2 250 X 300 and B3 250 x 300 while the child beams consisted of BA1 350 X 600, BA2 250 X 300 and BA3 200 X 300. The floor slab thickness was 100 mm and the shear walls had dimensions of 4550 x 950 mm.</p> 2026-11-03T01:03:28+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23279 Pengembangan Dashboard Interaktif Microsoft Power BI untuk Monitoring Kinerja Proyek Menggunakan Earned Value Management 2026-11-04T11:00:19+07:00 Isma Herdian Putra ismaputra2208@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Project performance control requires information that can describe time and cost conditions in a timely and measurable manner. This study develops an interactive Microsoft Power BI dashboard based on Earned Value Management (EVM) to support performance monitoring of the Muhammadiyah Center Building Construction Project in Blitar Regency, particularly for structural works. A descriptive quantitative approach was employed using data consisting of the Budget Plan (RAB), working drawings, and project progress reports. Due to the limited availability of the baseline schedule and actual cost data, the planned schedule was reconstructed and Actual Cost (AC) was estimated. Performance evaluation was conducted using the parameters Planned Value (PV), Earned Value (EV), and Actual Cost (AC), along with the indicators SV, CV, SPI, CPI, and EAC. The analysis at week 24 resulted in an SPI of 1.04, indicating that project progress was ahead of the planned schedule, while a CPI of 0.99 indicated that cost efficiency was slightly below the ideal condition. The estimated final project cost based on EAC was IDR 8,297,650,960.00. The analysis results were then integrated into an interactive Microsoft Power BI dashboard that presents project performance information visually and in an integrated manner. The dashboard can assist users in monitoring time and cost conditions, identifying deviations, and obtaining supporting information for project control and decision-making.</em></p> 2026-11-03T01:06:23+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23277 “EVALUASI KINERJA ANGKUTAN UMUM DI TRAYEK GROGOT-PENAJAM PROVINSI KALIMANTAN TIMUR” 2026-11-04T11:00:34+07:00 Kevin Rizky Ramadan kevinrzkyr@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The physical construction of the Nusantara Capital City (IKN) has triggered a very rapid spatial transformation in Tanah Grogot, Paser Regency, making the route from Tanah Grogot to Penajam Paser Utara a strategic buffer corridor that supports logistics flows and population mobilization toward the Sepaku-Balikpapan toll road. However, this rapid spatial growth is not balanced by adequate transportation because the Grogot–Penajam route is dominated by an aging fleet over 30 years old. This study aims to evaluate the operational feasibility of public transportation through the operational performance analysis method of public transportation as stipulated by the Director General of Land Transportation No. 687/2002. The results of the analysis show that the fleet's operational performance indicators violate the standards set by the Directorate General of Land Transportation No. 687 of 2002, including critical <em>headways</em> (23–58 minutes), speeds of 55–57 km/h, long circulation times (7 hours 3 minutes–7 hours 18 minutes), and dwell times of 60 seconds. Although the daily average <em>load factor</em> appears ideal (71.05%–87.80%), an extreme load surge of 11–15 passengers occurs on vehicles with a capacity of 9 seats in certain segments, which deteriorates the cabin air circulation. In conclusion, the optimization strategy through travel time and circulation time engineering is proven to be ineffective in improving operational performance due to the geographical constraint of the route length reaching 136 km with a pure travel time of ±3 hours, thereby triggering long vehicle circulation times and departure schedule uncertainty.</p> 2026-11-03T01:09:46+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23276 ANALISIS NILAI MANFAAT DAN KELAYAKAN EKONOMI PEMBANGUNAN FLYOVER BERDASARKAN KINERJA LALU LINTAS SIMPANG PAGESANGAN 2026-11-04T11:00:49+07:00 Ivan Meiza Alfurqan vanezaa135@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The Pagesangan Intersection is one of the strategic intersections in Mataram City, connecting residential, commercial, and educational areas, as well as the center of community activities. The high volume of traffic at this intersection causes congestion, which reduces its performance; therefore, measures are needed to improve traffic flow. This study aims to analyze traffic performance as a basis for determining the benefits and economic feasibility of constructing a flyover at the Pagesangan Intersection. The traffic performance analysis was conducted using the 2023 Indonesian Road Capacity Guidelines (PKJI) based on the parameters of degree of saturation (DJ), queue length, delay, and Level of Service (LOS). The benefit value was calculated based on savings in Vehicle Operating Costs (BOK) and travel time value, and the economic feasibility was then analyzed under two scenarios: the VOC savings scenario and the VOC savings and travel time value scenario, using the Benefit-Cost Ratio (BCR), Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP) methods. The results of the study show that under existing conditions, the DJ value exceeds the 2023 PKJI service threshold (DJ &gt; 0.85) with a service level of LOS F. After the construction of the flyover, the DJ value decreases to 0.49–0.60, while the service level improves to LOS B.</em> <em>The economic feasibility analysis shows that Scenario 1 yields a BCR of 2.22, an NPV of Rp261,022,595,466.20, an IRR of 24.19%, and a payback period of 4.68 years, while Scenario 2 yields a BCR of 2.77, an NPV of Rp338,162,549,688.44, an IRR of 64.20%, and a PP of 1.50 years. Based on these results, the construction of the flyover at the Pagesangan Intersection is technically and economically feasible.</em></p> 2026-11-03T01:15:37+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23275 STUDI KELAYAKAN PELEBARAN JEMBATAN OESAPA PADA RUAS JALAN NASIONAL KOTA KUPANG 2026-11-04T11:01:02+07:00 Maria Magdalena Albricia Klau abricaklau@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; text-justify: inter-ideograph; margin: 0in -.1pt 6.0pt 0in;"><span lang="EN-GB">The increasing traffic volume on the Oesapa Bridge, located on the National Road in Kupang City, has reduced the bridge's service performance and increased travel delays. This study aims to evaluate the technical and economic feasibility of widening the Oesapa Bridge. Traffic performance analysis was carried out based on the Indonesian Road Capacity Guidelines (PKJI 2023), while the economic feasibility assessment employed Vehicle Operating Cost (VOC), travel time value savings, Benefit Cost Ratio (BCR), Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period analyses. Primary data consisted of traffic volume, vehicle speed, and bridge geometric conditions, while secondary data included traffic growth, construction cost, and economic parameters. The analysis indicates that widening the bridge increases road capacity, reduces the degree of saturation, improves travel speed, decreases travel time, and reduces vehicle operating costs. Economic evaluation also shows that the project is financially feasible, as indicated by BCR greater than one, positive NPV, IRR exceeding the discount rate, and an acceptable Payback Period. Therefore, widening the Oesapa Bridge is recommended to improve transportation performance and support regional economic development in Kupang City.</span></p> 2026-11-03T01:19:34+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23274 EVALUASI KINERJA SIMPANG TIGA BERSINYAL DAN PREDIKSI KERUGIAN BIAYA OPERASIONAL KENDARAAN (BOK) AKIBAT KEMACETAN LALU LINTAS (Studi Kasus Simpang : Jl. Raya Geluran-Jl. Raya Taman-Jl. Raya Kletek, Kecamatan Taman, Kabupaten Sidoarjo, Provinsi Jawa Timur) 2026-11-04T11:01:17+07:00 Lediani Helda ledianihelda27@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Roads are transportation infrastructure that plays a vital role in supporting mobility. An increase in vehicle volume that is not matched by road capacity can lead to traffic congestion, as is the case at the signalized intersection of Jl. Raya Geluran, Jl. Raya Taman, and Jl. Raya Kletek in Sidoarjo Regency. This study aims to evaluate the intersection’s performance under existing conditions based on the 2023 Indonesian Road Capacity Guidelines (PKJI), formulate alternative improvement solutions, analyze the relationship between travel delay and fuel consumption under both existing and alternative conditions, and predict the intersection’s performance over the next five years. Performance analysis was conducted using the 2023 Indonesian Road Capacity Guidelines (PKJI) and Vissim 25 PTV modeling. The results show that the intersection’s current conditions have an F level of service with an average delay of 219.396 seconds per SMP, indicating that the intersection is unable to accommodate the existing traffic volume. The proposed alternatives—optimizing the three-phase signal timing, widening the road geometry by 0.4 meters, and implementing a straight-through lane on the eastern approach—result in an average delay of 22.66 seconds per SMP with a service level of C. The cost of losses due to traffic congestion for the accumulated time period amounts to Rp. 3,431,181.68 per hour, Rp. 27,449,453.42 per day, Rp. 548,989,068.43 per month, and Rp. 6,587,868,821.20 per year. Linear regression analysis shows a very strong relationship between delay and fuel consumption costs, with a correlation coefficient of r = 0.806 under the existing conditions:&nbsp; Y = 155,127.651 + 14,954,136. 0X and r = 0.852 under the alternative conditions Y = 114,774.24 + 15,142,766.6 X. The five-year forecast indicates a Level D level of service with an average delay of 29.76 seconds per SMP.</p> 2026-11-03T01:23:36+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23273 PERENCANAAN PENINGKATAN SISTEM PENYEDIAAN AIR BERSIH DI KECAMATAN PRAYA BARAT DAYA KABUPATEN LOMBOK TENGAH 2026-11-04T11:01:32+07:00 Muhammad Dzaki Nurmaksum dzakimadridista@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Southwest Praya District in Central Lombok Regency faces serious problems related to limited access to clean water, this is due to drought-prone geographical conditions and suboptimal pipeline network infrastructure. The community is currently very dependent on the use of drilled wells, but in one of the areas there is water pollution, so people use other alternatives by buying gallons of water to meet the demand for clean water, as well as tank water assistance, especially in the dry season. From these problems, it is necessary to improve the clean water supply system until 2040 and evaluate the condition of the hydrolytic distribution network in Darek Village, Ranggagata Village, Ungga Village, and Pelambik Village in the hope that the community will get clean water needs free from water pollution. Therefore, the planning period will be carried out in the next 15 years. The methods used include population growth projections using arithmetic methods, years of water demand analysis based on Cipta Karya planning criteria, and distribution network simulation using WaterGEMS V8i software. The raw water source is planned to come from the Batujai Dam which is processed through the Penujak Water Treatment Plant (IPA) and pumped to the Dongak Langit Reservoir. The results of the study show that in 2040, the projected population will reach 42,425 people with a service target of 90%. The average water demand is projected at 68.94 liters/second, the maximum daily demand is 79.28 liters/second, and the demand at peak hours is 107.55 liters/second. Network simulation with WaterGEMS shows that the planned system is able to maintain the pressure at the junction and flow speed in the pipeline in accordance with the set technical standards, so that it can be a sustainable solution in meeting the needs of clean water in the study area. The results of the pipeline network simulation were obtained with a total length of 17,380 meters of pipes with 12 junction points.</p> 2026-11-03T12:02:56+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23272 PENGARUH PENAMBAHAN MICROBIALLY INDUCED CALCITE PRECIPITATION DAN ABU SEKAM PADI TERHADAP FISIK DAN KUAT GESER TANH LEMPUNG EKSPANSIF 2026-11-04T11:01:47+07:00 Khofim Eka Ardinata khofimekaardinata23@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Expansive clay soils present significant challenges in civil engineering due to their high shrink-swell potential, which can cause structural damage. This study investigates the combined effect of Microbially Induced Calcite Precipitation (MICP) at 9% optimum concentration and Rice Husk Ash (RHA) at variations of 7%, 10%, 12%, and 15% on the physical properties and shear strength of expansive clay soils from Widang District, Tuban Regency, East Java. Laboratory tests included physical properties (water content, specific gravity, hydrometer analysis, Atterberg limits) and mechanical properties (Unconfined Compressive Strength, Direct Shear, and Triaxial Compression UU) with curing periods of 3, 7, 14, and 28 days. The results showed significant improvements across all parameters. The optimum condition was achieved at 9% MICP + 12% RHA with 28 days curing, yielding a reduction in Plasticity Index (PI) from 40.78% to 6.86% (83.18% reduction), indicating transformation from highly expansive to non-expansive soil. Shear strength parameters also improved substantially: Undrained Shear Strength (Su) increased from 0.511 to 1.994 kgf/cm² (74.37% increase), cohesion (c) from 0.276 to 1.469 kgf/cm² (81.21% increase), and internal friction angle (φ) from 2.18° to 3.86° (43.52% increase). Two-Way ANOVA analysis confirmed that both RHA percentage and curing period significantly affect soil improvement. This research demonstrates that the combination of MICP and RHA offers an effective, economical, and environmentally friendly solution for stabilizing expansive clay soils while utilizing agricultural waste.</p> 2026-11-03T12:07:37+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23271 PENGARUH PENAMBAHAN ABU AMPAS TEBU DAN MICROBIALLY INDUCED CALCITE PRECIPITATION TERHADAP SIFAT FISIK DAN KUAT GESER TANAH LEMPUNG EKSPANSIF 2026-11-04T11:01:56+07:00 Pandhu Syaiful Ma”arif pandhusyaiful02@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Expansive clay soil is highly sensitive to changes in water content, showing large shrink-swell behavior and low bearing capacity that frequently damages the structures built above it. This study evaluates an eco-friendly stabilization method that combines Microbially Induced Calcite Precipitation (MICP) using Bacillus subtilis bacteria with sugarcane bagasse ash (SCBA), a silica-rich pozzolanic industrial waste. Soil samples were collected from Widang District, Tuban Regency, East Java, with an initial Liquid Limit of 68.07%, Plastic Limit of 27.49%, and Plasticity Index of 40.58%, classifying the soil as CH (inorganic clay of high plasticity). The optimum MICP bacterial concentration of 9%, established from previous research, was combined with SCBA variations of 0%, 5%, 10%, and 15% of soil weight, and cured for 3, 7, 14, and 28 days. Laboratory tests included Direct Shear, Unconsolidated Undrained (UU) Triaxial, and Unconfined Compressive Strength (UCS), supported by Two-Way ANOVA analysis. The combined treatment consistently reduced the Plasticity Index and increased cohesion, internal friction angle, and unconfined compressive strength through the formation of calcium carbonate (CaCO3) precipitates. The optimum condition was reached at 10% SCBA with MICP 9% and 28 days of curing, giving a PI reduction of 82.31%, an undrained cohesion increase of 81.03%, a Direct Shear strength increase of 70.46%, and a UCS increase of 74.49% compared to the untreated soil, while an excessive ash content of 15% reduced the stabilization performance.</p> 2026-11-03T12:12:05+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23270 PENANGGULANGAN BANJIR KAWASAN PENARAGA KOTA BIMA PROVINSI NUSA TENGGARA BARAT 2026-11-04T11:02:05+07:00 Azid Kamala Rizkuna Azidkamala07@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Land-use change from agricultural areas to residential zones in the Penaraga Area, Bima City, West Nusa Tenggara Province, has significantly reduced water catchment areas. Consequently, high-intensity rainfall triggers overflows in the drainage dimensions, causing flood inundation with depths of 30–50 cm for approximately 2 hours. This study aims to evaluate the performance of the existing drainage system and redesign the optimal channel dimensions as a flood mitigation effort in the area. The research method begins with collecting existing channel dimensions and maximum daily rainfall data over a 10-year period (2016–2025). Hydrological analysis includes calculating average rainfall using the Thiessen Polygon method, frequency analysis utilizing the E.J. Gumbel distribution, and suitability tests via Chi-Square and Smirnov-Kolmogorov methods. The 10-year return period design flood discharge is calculated using the Rational Method, while the evaluation of channel hydraulic capacity employs Manning's equation. The analysis results indicate that the existing drainage system is inadequate; out of 50 evaluated channels, 38 are unable to accommodate the design flood discharge. For instance, the Veteran Street (right) channel has a design flood discharge of 0.743 m³/second, whereas its existing capacity is only 0.171 m³/second. In conclusion, this study recommends replacing the channel material from river stone masonry to precast concrete U-ditch channels and enlarging the cross-sectional dimensions, such as reshaping Veteran Street (right) to 0.60 m x 0.60 m to safely convey the water flow. Furthermore, periodic maintenance, including sediment dredging and garbage cleaning, is essential to sustain optimal drainage system performance.</em></p> 2026-11-03T12:16:03+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23269 PENINGKATAN SALURAN DRAINASE KAWASAN TANJUNG REJO KOTA MEDAN PROVINSI SUMATERA UTARA 2026-11-04T11:02:18+07:00 Yos Abimanyu yosabimanyu@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Local flooding in the Tanjung Rejo area of ​​Medan City currently reaches depths of 60–80 cm and lasts approximately two hours, a result of reduced infiltration and land-use changes driven by the city's ongoing urban development. Existing drainage channels also suffer from sedimentation, waste-induced blockages, and other flow obstructions. Consequently, upgrading the drainage system in Tanjung Rejo is necessary to evaluate network performance and design optimal cross-sectional dimensions to mitigate water accumulation. This study employs a quantitative approach utilizing hydrological analysis based on 10 years of daily rainfall data from three monitoring stations. Areal rainfall was determined using the Algebraic method, identifying the Tanjung Morawa Station as the primary influencing factor for the entire area. The E.J. Gumbel method was selected to calculate design rainfall for a 10-year return period (131.157 mm), with validity confirmed via Chi-Square and Kolmogorov-Smirnov tests; design flood discharge was calculated using the Rational Method. An evaluation of 145 existing channels revealed that only 47 met capacity requirements, while 98 did not. From a technical standpoint, it is recommended to structurally redesign non-compliant channels using precast concrete U-Ditch sections to reduce wall roughness coefficients. For instance, the existing masonry channel on Jl. Setia Budi A (left side) measuring 1.0 m x 0.9 m with a capacity of 0.844 m³/s, should be upgraded to a 1.1 m x 1.4 m U-Ditch channel capable of safely conveying the design flood discharge of 2.637 m³/s, alongside routine maintenance measures such as sediment dredging and the installation of biopore infiltration holes. </em></p> 2026-11-03T12:19:41+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23268 FAKTOR YANG MEMPENGARUHI KELELAHAN DAN KECELAKAAN KERJA PADA PROYEK GEDUNG SEKOLAH 2026-11-04T11:02:29+07:00 Dinar Octadwana dinarocta106@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The construction industry is a sector with a high rate of workplace accidents. Work-related fatigue is one of the main factors contributing to accidents, as it can reduce concentration, slow reaction times, and increase the likelihood of work errors. This study aims to identify the most dominant work fatigue factors influencing the risk of workplace accidents in the building construction project under review. The method used is descriptive quantitative, with data collection via a questionnaire. Data analysis was conducted using the Analytical Hierarchy Process (AHP) method with the assistance of Expert Choice software. The variables analyzed encompass four criteria: reduced activity, reduced motivation, physical fatigue, and mental fatigue. The analysis results indicate that physical fatigue is the most dominant factor with a weight of 61.40%, followed by mental fatigue at 22.60%, reduced motivation at 9.90%, and reduced activity at 6.0%. The dominant indicators for each factor were labored breathing (52.60%), slow response time (32.90%), forgetfulness (27.80%), and loss of balance while standing (38.0%). Controlling physical fatigue through the regulation of working hours and adequate rest periods should be a top priority in occupational safety and health (OSH) programs for construction projects. </em></p> 2026-11-03T12:23:24+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23267 PENINGKATAN SISTEM SALURAN DRAINASE KAWASAN AIR PUTIH KOTA SAMARINDA PROVINSI KALIMANTAN TIMUR 2026-11-04T11:02:44+07:00 Wahyu Fajar Ramadhan ramadhn6607@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The Air Putih area in Samarinda City regularly experiences flooding with water depths of 30–50 cm lasting up to two hours during high-intensity rainfall events. This flooding results from the inadequate capacity of existing drainage channels to accommodate runoff discharge, sedimentation, and the increasing extent of impervious surfaces due to urban development. This study aims to analyze the layout and capacity of existing drainage channels, calculate the design flood discharge for a 10-year return period, and develop a redesign plan for channels with insufficient capacity. The methods applied include rainfall data consistency testing using the double mass curve, determination of areal rainfall using the Thiessen Polygon method, frequency distribution analysis (Log Pearson Type III and E.J. Gumbel) tested for goodness-of-fit using Chi-Square and Smirnov-Kolmogorov tests, design flood discharge calculation using the Rational Method, and channel redimensioning using Manning's equation. Results show a 10-year design rainfall of 143.83 mm, with existing discharge capacity across 100 channel segments ranging from 0.04–4.96 m³/s and design flood discharge ranging from 0.03–7.77 m³/s. Evaluation revealed that 41 channels meet the required capacity while 59 channels do not, necessitating redesign using rectangular precast U-Ditch sections. This study is expected to serve as a technical reference for local government in addressing flooding issues in the Air Putih area.</em></p> 2026-11-03T12:26:46+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23266 EVALUASI KINERJA SIMPANG TIGA TAK BERSINYAL MENGGUNAKAN METODE PKJI (2023) DAN PENGARUHNYA TERHADAP KUALITAS UDARA 2026-11-04T11:02:59+07:00 Petra Ekayuni Adi ekaa41764@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The increasing traffic volume at the unsignalized three-leg intersection of Jl. Madyorenggo – Jl. KH. Wahid Hasyim – Jl. Raya Gatot Subroto, Turen District, Malang Regency, has the potential to reduce intersection performance and affect the surrounding air quality. This study aims to evaluate the performance of the unsignalized three-leg intersection and its effect on air quality. The intersection performance analysis was conducted based on the 2023 Indonesian Highway Capacity Guidelines (PKJI 2023), while air quality was evaluated using the Air Pollution Standard Index (ISPU). The relationship between intersection delay and pollutant concentrations was analyzed using linear regression. The research data were obtained through traffic volume surveys, geometric condition surveys, and air quality measurements. The results showed that the existing condition had a degree of saturation of 1.13, a queue probability of 102.977%, an average delay of 27.422 s/pcu, and a Level of Service (LOS) D during the peak hour. The peak-hour air quality indicated NO₂ and CO concentrations of 30.102 µg/m³ and 293.274 µg/m³, respectively. After implementing the proposed improvement alternative, consisting of a three-phase signalized intersection with geometric widening at each approach, the average delay decreased to 23.990 s/pcu with a Level of Service (LOS) C. The ISPU values for NO₂ and CO after the improvement were 19.640 and 3.257, respectively, both classified as Good.</p> 2026-11-03T12:36:05+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23265 EVALUASI KINERJA SIMPANG EMPAT BERSINYAL TERHADAP WAKTU TUNDAAN DAN EMISI GAS BUANGAN KENDARAAN MENGGUNAKAN METODE PKJI 2023 2026-11-04T11:03:14+07:00 Gresti Elmindika Nubatonis grestinubatonis2004@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The increase in traffic volume can lead to vehicle delay, which in turn increases vehicle exhaust emissions. One location experiencing these conditions is the signalized four-leg intersection of Ahmad Yani Street – Sultan Agung Street – Sumedang Street – Karangkates Street, Malang Regency. This study aims to evaluate the operational performance of the intersection, vehicle delay, and its effect on air quality. The intersection performance analysis was conducted based on the <strong>2023 Indonesian Highway Capacity Guidelines (PKJI 2023)</strong><strong>.</strong> Primary data consisted of geometric characteristics, traffic volume, and measurements of <strong>NO₂</strong> and <strong>CO</strong> pollutant concentrations, while secondary data comprised population data. The traffic performance parameters analyzed included the Degree of Saturation (DS), delay, queue length, and Level of Service (LOS). Air quality was assessed based on <strong>NO₂</strong> and <strong>CO</strong> concentrations using the <strong>Air Pollution Standard Index (ISPU)</strong><strong>.</strong> The results indicate that the existing intersection operates at <strong>Level of Service F</strong>, with an average delay of <strong>528.098 s/pcu</strong> and a <strong>Degree of Saturation (DS) of 1.60</strong> during the peak hour. Air quality measurements during the peak hour showed <strong>NO₂</strong> and <strong>CO</strong> concentrations of <strong>65.849 µg/m³</strong> and <strong>239.431 µg/m³</strong><strong>,</strong> respectively. Following the implementation of improvement alternatives in the form of signal timing adjustment and phase modification, the average delay decreased to <strong>25 s/pcu</strong>, resulting in <strong>Level of Service C</strong>. The ISPU values for <strong>NO₂</strong> and <strong>CO</strong> after the intersection improvements were <strong>4.164</strong> and <strong>0.058</strong>, respectively, both classified as <strong>Good</strong> according to the ISPU classification.</p> 2026-11-03T12:41:02+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23264 EVALUASI KINERJA SIMPANG TIGA BERSINYAL DAN PENGARUH TERHADAP BIAYA BAHAN BAKAR MINYAK 2026-11-04T11:03:31+07:00 Hesti Dwida Austin Kudji hestikudji2004@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The increase in traffic volume that is not matched by intersection capacity has resulted in increased delay, queue length, and fuel consumption of Diponegoro Street-Hayam Wuruk Street-Gondanglegi, Malang Refency. The study aimed to evaluate the intersection performance using the 2023 Indonesian Highway Capacity Guidelines (PKJI 2023) and PTV Vissim 25 simulation, analyse the effect of delay on fuel consumption cost (BiBBM) using the LAPI-ITB method, evaluate the effectiveness of improvement alternatives, and predict the intersection performance over the next five years. The data used consisted of primary data obtained from field surveys, including traffic volume, intersection geometry, queue length, and signal cycle time, as well as secondary data collected from supporting literature. The analysis was conducted based on capacity, degree of saturation, queue length, delay, and level of service in accordance with PKJI 2023 and Minister of Transportation Regulation No. 96 of 2015. The analysis of the existing condition dhowed a peak-hour traffic volume of 2,069.5 PCU/h, a degree of saturation of 1.04, and an average delay of 58,64 s/PCU based on PKJI 2023 and 59.14 s/PCU based on PTV Vissim 25, indicating Level of Service (LOS) E. Simple linear regression analysis for motorcycles produced the equation &nbsp;with correlation coefficient of , indicating a very strong relationship between delay and fuel consumption cost. The implementation of improvement Alternative II resulted in a degree of saturation &lt;0.85, with an average delay of 23,676 s/PCU based on PKJI 2023 and 33s/PCU based on PTV Vissim 25 (LOS C). The five-year&nbsp; prediction after the implementation of the improvement alternative showed an average delay of 31.50 s/PCU with Level of Service (LOS) D.</p> 2026-11-03T12:45:39+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23263 STUDI EVALUASI KINERJA LALU LINTAS PADA SIMPANG TIGA TAK BERSINYAL DAN DAMPAKNYA TERHADAP KUALITAS UDARA DI KABUPATEN SIDOARJO 2026-11-04T11:03:48+07:00 Maria Adriana Tadas Dyanatadas@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The increasing number of vehicles in Sidoarjo Regency has led to traffic congestion at several intersections, one of which is the unsignalized three-leg intersection at Suko Road – Sumput Road – Cemeng Kalang Road. This kndition has resulted in increased vehicle delays, traffic congestion, and vehicle exhaust emissions that may affect air quality. This study aims to evaluate the performance of the intersection, analyze air quality based on carbon monoxide (CO) and nitrogen dioxide (NO2) concentrations, and determine the relationship between traffic performance and air quality. The study was conducted using traffic surveys, air quality measurements, and intersection performance analysis based on the Indonesian Highway Capacity Guidelines (PKJI) 2023. The relationship between traffic performance and air quality was analyzed using regression and correlation methods. The results showed that the existing intersection had a degree of saturation (DS) of 1,27 with a Level of Service (LOS) F, indicating that the intersection performance did not meet the PKJI 2023 standards. Air quality measurements indicated that the concentrations of NO2 and CO were still within the Good category based on the Air Pollution Standard Index (ISPU). The analysis also revealed a relationship between increasing vehicle delays and pollutant concentrations. The most effective improvement alternative was the implementation of a three – phase signalized intersection combined with geometric road widening, which was able to improve intersection performance and reduce the potential for vehicle emissions.</p> 2026-11-03T12:50:18+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23262 STUDI NUMERIKAL SAMBUNGAN BALOK KE KOLOM DENGAN TIPE PELAT UJUNG DIPERPANJANG PADA ARAH SUMBU LEMAH KOLOM 2026-11-04T11:04:04+07:00 Victorius A. Saputra victorsaputra2004@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Beam-to-column connections are critical components in steel structures because they transfer forces, moments, and deformations between structural members, thereby affecting the strength, stiffness, and ductility of the structural system, particularly for weak-axis column connections. This study investigates the behavior of an extended stiffened end-plate beam-to-column connection subjected to weak-axis bending using the Finite Element Method (FEM) in ABAQUS 2024. The numerical model was developed in accordance with SNI 1729:2020, SNI 7860:2020, AISC 341-22, AISC 360-22, AISC 358-22, FEMA 355D, and FEMA 350. Monotonic and cyclic loading analyses were performed to evaluate stress distribution, strain, moment-rotation response, and failure mechanism. The results show that the highest stress concentration occurred in the bolts, reaching 807.641 MPa at 4% rotation and 827 MPa at 6% rotation, indicating premature bolt yielding. The moment-rotation response revealed a semi-rigid connection behavior; however, the connection did not satisfy the minimum 4% rotation requirement for seismic moment connections. The study demonstrates that FEM analysis using ABAQUS provides an effective approach for evaluating the structural performance of weak-axis beam-to-column connections.</em></p> 2026-11-03T12:55:18+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23261 STUDI NUMERIKAL SAMBUNGAN BALOK KE KOLOM BAJA TIPE PELAT UJUNG PADA ARAH SUMBU KUAT KOLOM 2026-11-04T11:04:17+07:00 Yohanes Christian Kapitan christiankapitan13@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Beam-to-column connections are one of the most critical components in steel structures because they transfer internal forces between elements and influence structural response under loading, particularly during earthquakes. This study aims to evaluate the behavior of an <strong>extended end-plate</strong> connection on the strong axis through numerical analysis using the <em>Finite Element Method (FEM)</em> implemented in ABAQUS. The materials used include SS400 structural steel, ASTM A325 high-strength bolts, and E70 welding material. The analysis was carried out by applying monotonic loading concentrated at the top end of the column and cyclic loading based on <em>displacement control</em> in accordance with FEMA 350 and AISC 341-22 provisions. The parameters observed include stress distribution and the moment-rotation relationship of the connection. The analysis results show that the <strong>benchmark</strong> model was able to resist a maximum moment of 264.165 kN·m at 6% rotation, while the modified model reached 246.058 kN·m at the same rotation level. Both models satisfied the minimum moment capacity requirement of 0.8Mpb, or 245.52 kN·m, as specified in AISC 341-22. In terms of stress distribution, the modified model showed that plastic deformation was more concentrated in the beam, while the column stiffener remained in the elastic range, making the connection behavior more consistent with the <strong>strong column-weak beam</strong> design philosophy. In addition, the hysteresis curve of the modified model exhibited a more stable response and better energy dissipation capacity than the<strong> benchmark</strong> model. These findings indicate that adding a column stiffener can improve the seismic performance of <strong>extended end-plate</strong> connections through a more uniform stress distribution and a better plastic deformation mechanism.</p> 2026-11-03T13:00:59+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23260 IDENTIFIKASI WASTE DOMINAN PADA PROYEK PEMBANGUNAN PAGAR MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION DAN ANALISIS PARETO 2026-11-04T11:04:38+07:00 Jonathan Afrizal afrizaljona@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The construction industry is highly complex, making it prone to various forms of waste during project implementation. The presence of waste can lead to suboptimal use of resources, increased costs, and reduced work efficiency. One approach that can be used to identify and control waste in construction projects is Lean Construction, a construction management concept that focuses on increasing added value by reducing non-value-added activities. This study aims to identify the dominant types of waste occurring in a fence construction project using the Lean Construction approach and the Pareto analysis method. Waste was identified based on the eight types of waste in the Lean Construction concept: overproduction, overprocessing, non-utilized talent, waiting, transportation, motion, inventory, and defects. Research data were obtained by collecting assessment scores for waste factors that occurred during project execution; the data were then processed using percentage contribution and cumulative value analysis to determine the priority of dominant waste. The analysis results show that there are three types of waste that contribute the most to overall waste: overproduction (20.12%), overprocessing (18.34%), and non-utilized talent (17.16%). These three types of waste account for a cumulative 55.62%, making them priority factors that need to be controlled in order to improve project efficiency. Based on these results, the Lean Construction approach using Pareto analysis can be used as an initial identification method to determine where to focus improvement efforts on activities that have the potential to cause waste in construction projects.</em></p> 2026-11-03T13:05:22+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23259 PERENCANAAN STRUKTUR JEMBATAN DAWAS DENGAN STEEL BOX GIRDER MENGGUNAKAN MIDAS CIVIL 2026-11-04T11:04:55+07:00 Muhamad Nur Arifin muhamadnurarifin250203@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The development of toll road infrastructure in Indonesia requires bridge structures that are capable of carrying high traffic volumes while maintaining structural safety, stiffness, and long-term serviceability. One of the strategic bridges on the Betung–Tempino–Jambi Toll Road Section 1B is the Dawas Bridge, which has a main span of 60 m requiring an efficient and reliable superstructure system. This study proposes an alternative design of a composite steel box girder as the bridge superstructure to improve torsional resistance, structural efficiency, and construction feasibility. The bridge design refers to SNI 1725:2016 for bridge loading, SNI 2833:2016 for seismic design, SNI 1729:2020, RSNI T-03-2005, RSNI T-12-2004, AASHTO LRFD Bridge Design Specifications, and relevant guidelines issued by the Ministry of Public Works and Housing. Structural analysis is performed using MIDAS Civil software to evaluate internal forces, deflection, and structural performance under various loading combinations. The design process includes deck slab design, steel box girder dimensioning, diaphragm configuration, connection design, and bearing selection. The expected outcome of this research is an alternative steel box girder bridge design that satisfies structural strength, stiffness, and serviceability requirements while providing practical recommendations for the implementation of steel box girder systems in medium-span toll road bridges in Indonesia.</p> 2026-11-03T13:10:49+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23258 EVALUASI KIENRJA SIMPANG TIGA BERSINYAL DAN DAMPAK TERHADAP BIAYA OPERASIONAL KENDARAAN (BOK) 2026-11-04T11:05:09+07:00 Sheila Nabila Alessandra Brito Lui sheilalui19@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The signalized three-leg intersection of Gajah Mada Street, Raya Lengkong Street, and Raya Gemekan Street, Mojokerto Regency, experiences increasing traffic volumes, resulting in congestion, delays, and increased vehicle operating costs. This study aims to evaluate the intersection performance using the Indonesian Road Capacity Guidelines (PKJI) 2023 and Sidra Intersection 8.0 Software, determine the most effective intersection improvement alternative, analyze the relationship between delay and fuel consumption costs, and predict traffic conditions for the next five years. Primary data were obtained through traffic volume and geometric surveys of the intersection, while secondary data consisted of vehicle growth data and supporting references. The analysis of existing conditions showed a peak-hour traffic volume of 3417.25 PCU/h during 16:00–17:00 WIB, with an average delay of 124.65 sec/PCU based on PKJI 2023 and 165.1 sec/PCU based on Sidra Intersection 8.0, indicating Level of Service F. The best intersection improvement alternative was achieved by modifying the signal cycle length and phasing, resulting in a cycle length of 46 seconds. This alternative produced an average delay of 9.10 sec/PCU and improved the intersection performance to Level of Service B. Linear regression analysis showed a very strong relationship between delay and fuel consumption costs, with a correlation coefficient of 0.959. Traffic forecasting for the next five years indicates that intersection performance will deteriorate because traffic flow growth exceeds the available capacity, so the existing intersection capacity will no longer be able to accommodate the increasing traffic flow effectively, resulting in increased vehicle delay. Based on the analysis results, the selected intersection improvement alternative provides better intersection performance and can be recommended as an appropriate treatment for the study location.</em></p> 2026-11-03T13:14:36+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23257 ANALISIS LENDUTAN, SAMBUNGAN DAN POT BEARING STRUKTUR ATAS PADA JEMBATAN KALI GEDE TIPE PRATT TRUSS 2026-11-04T11:05:22+07:00 Anur Firmansyah 2221028@scholar.itn.ac.id Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; text-justify: inter-ideograph; margin: 0in -.1pt 6.0pt 0in;"><em><span lang="EN-GB">The Kali Gede Bridge is part of the Southern Cross Route project in Trenggalek Regency which was built to improve connectivity with Tulungagung Regency. The existing bridge uses a 120 m long Warren Truss type steel frame, while this research plans an alternative superstructure using a Pratt Truss type steel frame. Analysis and planning were carried out using the Load and Resistance Factor Design (LRFD) method based on SNI 1725:2016 for bridge loading and SNI 1729:2020 for planning steel structures and connections. Modeling and structural analysis were carried out using STAAD Pro V8i software. The planned superstructure includes the vehicle floor plate, longitudinal and transverse girders, mains, main frame elements, wind ties, connections and placement of bearing pots. The planning results show that the floor plate uses main reinforcement D16-100 and reinforcement for D13-250, longitudinal girder WF 500x200x10x16, transverse girder WF 900x300x16x28, main box girder 1500x800x50, upper transverse girder H-Beam 250x250x9x14, vertical beam HWF 700x650x25x30, WF diagonal rod 700x550x20x25, pipe upper wind bond Ø267.4x15.1, 2L lower wind bond 200x200x25, with maximum deflection of 54.52 mm, smaller than the clearance limit of 120 mm (L/1000), and placement in the form of a fixed type pot bearing model FX 24000-7200 and guided model GG 18000-1800-100. These results show that the design obtained meets the requirements for strength, stability and structural performance according to the LRFD method so that it is suitable to be applied as an alternative planning for the Kali Gede Bridge</span></em><span lang="EN-GB">.</span></p> 2026-11-03T13:18:06+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23256 STUDI ANALISIS PERILAKU STRUKTUR MENGGUNAKAN DAMPER DAN BASE ISOLATOR PADA GEDUNG ASRAMA PONDOK TSURAYYA ISLAMIC SCHOOL 2026-11-04T11:05:40+07:00 Aditya Zaen Putra Pamungkas vegaaditama@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>As a region with high seismic activity, Indonesia requires advanced seismic protection systems in building structures to ensure safety and minimize structural damage. This study aims to analyze and compare the structural behavior performance of a steel building at the Tsurayya Islamic School Dormitory in Malang Regency using two different seismic protection systems: Fluid Viscous Dampers (FVD) and High Damping Rubber Bearings (HDRB). The methodology involves three-dimensional modeling and Nonlinear Time History analysis using ETABS software, with seismic resistance parameter calibrations referencing the SNI 1726:2019 standard. Structural performance evaluations are assessed based on interstory drift, base shear, P-Delta effects, and natural vibration periods. The analysis results indicate that the application of FVD is effective in absorbing earthquake energy, reducing the average lateral drift by 7.268% in the X-direction and 18.054% in the Y-direction, while maintaining stability against P-Delta effects. On the other hand, the utilization of HDRB significantly extends the natural vibration period of the structure from 1.70 seconds to 5.028 seconds. This period elongation makes the superstructure more flexible, thereby reducing the lateral roof drift more significantly by up to 29.60% in the X-direction and 26.92% in the Y-direction due to the concentration of deformation within the isolation layer. In conclusion, both systems successfully enhance the building's seismic performance significantly, with HDRB offering higher effectiveness in extending the structural period, whereas FVD excels in reducing structural responses without drastically altering the fundamental dynamic characteristics of the building.</em></p> <p><em>&nbsp;</em></p> 2026-11-03T13:21:50+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23255 PENINGKATAN SISTEM PENYEDIAAN AIR BERSIH DI KECAMATAN LEDOKOMBO 2026-11-04T11:05:53+07:00 Brilliant Avril Nawangsari brilliantnawangsari@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; margin: 0in -.1pt 6.0pt 0in;"><span lang="EN-GB">Ledokombo Subdistrict, Jember Regency particularly Sumber Salak and Sumber Bulus Villages with a combined population of approximately 20,928 people faces suboptimal clean water service coverage despite the availability of several potential spring sources, necessitating a comprehensive improvement of the clean water supply system. This study aims to calculate the projected clean water demand up to 2035, determine the required reservoir capacity, and design an improved water distribution network for the next ten years. A quantitative approach was employed, involving the collection of demographic and technical data, population projection using arithmetic, geometric, and exponential methods, calculation of domestic and non-domestic water demand, and hydraulic modeling and simulation of the pipe network using <em>WaterGEMS software</em> based on the Hazen-Williams formula. The results show that water demand in 2035 will reach 33.26 L/s, while the existing discharge is only 20 L/s, resulting in a supply deficit of 13.26 L/s, which is proposed to be met through an additional water source. The required reservoir storage volume of 544.87 m³ can still be accommodated by the existing reservoir capacity of 560 m³ without additional capacity. Simulation of the planned pipe network yields pressures ranging from 1.09–7.48 atm, flow velocities of 0.10–1.30 m/s, and a maximum <em>headloss gradient of</em> 8.816 m/km, all of which meet the technical criteria for water supply system planning. It is concluded that the proposed network improvement is capable of serving the clean water needs of both villages through 2035, with implications for the need to verify the actual discharge of the additional water source and to consider installing pressure-reducing valves in high-pressure zones prior to implementation.</span></p> 2026-11-03T13:25:23+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23254 PERENCANAAN PENINGKATAN SALURAN DRAINASE KAWASAN PAGESANGAN KOTA MATARAM PROVINSI NUSA TENGGARA BARAT 2026-11-04T11:06:10+07:00 Jenifer Christina Tesalonika Kamagi jeniferctkamagi@gmai.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Urban drainage systems play an important role in controlling stormwater runoff and reducing flood risk. The Pagesangan area in Mataram City continues to experience inundation due to the insufficient capacity of several existing drainage channels to convey the design flood discharge. This study aims to evaluate the condition and capacity of the existing drainage channels and to develop improvement plans for channels that do not meet hydraulic requirements. The study was conducted through field surveys and hydrological analyses using ten years of rainfall data. Areal rainfall was determined using the Thiessen polygon method, frequency analysis was performed using the Log Pearson Type III distribution, and goodness-of-fit tests were carried out using the Chi-square and Smirnov-Kolmogorov methods. The design flood discharge was calculated using the Rational Method with a 10-year return period and subsequently compared with the channel capacity based on Manning's equation. The evaluation results showed that 68 of the 113 drainage channels had adequate capacity, while the remaining 45 channels were unable to convey the design flood discharge. The proposed improvement measures include channel resizing for one channel, material replacement for seven channels, a combination of channel resizing and material replacement for twenty-six channels, and sediment dredging for eleven channels. The results of this study are expected to serve as a reference for improving the drainage system to reduce the potential for inundation and flooding in the Pagesangan area, Mataram City.</p> 2026-11-03T13:30:44+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23253 PENGENDALIAN BANJIR DESA TEMPURSARI KECAMATAN WUNGU KABUPATEN MADIUN 2026-11-04T11:06:25+07:00 Calvin Defarel Oktavandi calvindefarel@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Flooding </em><em>that occurred</em><em> in the Tempursari area, Wungu District, Madiun Regency occurred due to high rainfall, changes in land use into residential areas, and decreased capacity of existing drainage channels due to sedimentation. This study aims to analyze the planned flood discharge for a 10-year return period, evaluate the channel capacity, and re-plan the optimal channel dimensions. Through a hydrological and hydraulic approach, regional rainfall analysis was carried out using the Thiessen Polygon method and the E.J. Gumbel distribution, while the planned flood discharge was calculated using the Rational Method. The evaluation results showed that most of the existing channels, such as on Jl. Glonggong (left) (1) which only has a capacity of 0.135 m³/second, are unable to accommodate the planned flood discharge of 0.296 m³/second. As a solution, re-planning was carried out by enlarging the channel dimensions to 0.30 m x 0.45 m and replacing the old structural material with precast concrete (U-Ditch) so that the drainage system can function optimally in draining rainwater into the river</em></p> 2026-11-03T13:39:41+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23252 EVALUASI KIENRJA SIMPANG TIGA BERSINYAL DAN DAMPAK TERHADAP BIAYA OPERASIONAL KENDARAAN (BOK) 2026-11-04T11:06:40+07:00 Sheila Nabila Alessandra Brito Lui sheilalui19@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; text-justify: inter-ideograph; margin: 0in -.1pt 6.0pt 0in;"><span lang="EN-GB">The stress and strain distribution in longitudinal reinforcement is a critical parameter for evaluating the structural behavior of reinforced concrete beams subjected to flexural loading. Understanding the evolution of reinforcement stress and strain provides insight into the load transfer mechanism between concrete and reinforcing steel from the elastic stage to yielding and plastic deformation. This study aims to investigate the stress and strain distribution of longitudinal reinforcement in reinforced concrete beams using the Finite Element Method (FEM) implemented in ABAQUS 2024. A three-dimensional beam model with dimensions of 200 × 300 × 3000 mm was developed using concrete with a compressive strength of <strong>25 MPa</strong>, D16 longitudinal reinforcement with a yield strength of <strong>420 MPa</strong>, and Ø10 stirrups with a yield strength of <strong>280 MPa</strong><strong>.</strong> Concrete was modeled using the <strong>Concrete Damaged Plasticity (CDP)</strong> model with the compressive stress–strain relationship based on the <strong>Saenz (1964)</strong> constitutive model, while the reinforcing steel was modeled as an elastic–plastic material. The analysis was conducted under displacement-controlled loading of <strong>6.405 mm</strong><strong>, 50 mm</strong>, and <strong>100 mm</strong>. The numerical results show that increasing displacement leads to a progressive increase in stress and strain in the longitudinal reinforcement, indicating the transition from the elastic stage to yielding and plastic behavior. The maximum reinforcement stress reached <strong>421.74 MPa</strong>, while the maximum strain reached <strong>0.056</strong>. The concrete compressive stress increased to <strong>39.20 MPa</strong>, indicating nonlinear material behavior beyond the design compressive strength. The numerical model was validated against manual calculations, yielding an agreement of approximately <strong>97.96%</strong>, demonstrating the reliability of the proposed finite element model. These results confirm that ABAQUS is capable of accurately predicting the stress and strain distribution of reinforcing steel and can be effectively applied to evaluate the mechanical behavior of reinforced concrete beams.</span></p> 2026-11-03T14:36:54+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23251 PENGGUNAAN MATERIAL BATU LOKAL KABUPATEN ENDE PENAMBAHAN ABU SERBUK KAYU SEBAGAI FILLER CAMPURAN ASPAL AC- BC 2026-11-04T11:07:04+07:00 Aser Habita Halang umbuaserhalang@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Ende Regency, East Nusa Tenggara, has abundant local natural stone material that remains underutilized in road construction, forcing the region to rely on materials transported from other areas and increasing production costs. This study analyzes the effect of using local natural stone aggregate from Ende Regency, combined with wood ash as a filler substitute, on the Marshall performance of AC-BC (Asphalt Concrete–Binder Course) asphalt mixtures, and determines the Optimum Asphalt Content (OAC) and Optimum Filler Content (OFC) of the wood ash. The research was conducted experimentally at the Transportation and Highway Laboratory of the National Institute of Technology (ITN) Malang, covering characterization tests of the aggregate and Pertamina penetration 60/70 asphalt, followed by Marshall testing at asphalt content variations of 4.50%–6.50% and wood ash content variations of 0%–0.8%, referring to the Bina Marga 2018 General Specification (Revision 2). Results show that the local Ende aggregate does not fully meet the specification, particularly in specific gravity and absorption. Wood ash addition increased Stability and VFA values but did not resolve the VMA deficiency, which remained below the minimum requirement across all variations. Based on the overall Marshall parameter analysis, the OAC was determined at 5.54% and the OFC of wood ash at 0.19%, with the Pertamina penetration 60/70 asphalt meeting all requirements of Bina Marga 2018 Division 6.</em></p> 2026-11-03T14:40:51+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23249 PENGGUNAAN BATU ALAM LOKAL KABUPATEN ENDE PENAMBAHAN SERBUK ARANG KELAPA SEBAGAI FILLER CAMPURAN ASPAL 2026-11-04T11:07:15+07:00 Bobi Sasputra Bin Marufin bobisaputra1722@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Ende Regency has abundant local natural stone resources that can be utilized as pavement materials. In addition, coconut shell waste processed into charcoal powder has the potential to be used as a filler in Asphalt Concrete-Wearing Course (AC-WC) mixtures. This study aimed to analyze the effect of adding coconut shell charcoal powder on the Marshall characteristics of AC-WC mixtures using local natural stone from Ende Regency, determine the Optimum Asphalt Content (OAC), and identify the optimum percentage of filler addition. This research employed an experimental method conducted at the Transportation and Highway Engineering Laboratory, National Institute of Technology (ITN) Malang, using local natural stone aggregates from Ende Regency and 60/70 penetration grade asphalt. Coconut shell charcoal powder was added at proportions of 0%, 0.3%, 0.5%, 0.7%, and 0.9%. Marshall testing was carried out in accordance with the 2018 Bina Marga General Specifications. The results showed that the Optimum Asphalt Content (OAC) was 5.68%. The control mixture (0% coconut shell charcoal powder) produced a stability of 1238.99 kg, a flow value of 2.36 mm, VIM of 4.45%, VMA of 16.31%, VFA of 72.75%, MQ of 626.41 kg/mm, and a density of 2.021 g/cm³, all of which satisfied the requirements of the 2018 Bina Marga General Specifications. The addition of coconut shell charcoal powder affected all Marshall parameters and demonstrated its potential as an alternative filler in AC-WC mixtures by utilizing local resources and environmentally friendly waste materials.</em></p> 2026-11-03T14:45:21+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23248 STUDI NUMERIKAL DISTRIBUSI TEGANGAN DAN REGANGAN TULANGAN LONGITUDINAL PADA BALOK BETON BERTULANG 2026-11-04T11:07:32+07:00 Elias Piterson Poma Rasi gersonrasi352@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; text-justify: inter-ideograph; margin: 0in -.1pt 6.0pt 0in;"><span lang="EN-GB">The stress and strain distribution in longitudinal reinforcement is a critical parameter for evaluating the structural behavior of reinforced concrete beams subjected to flexural loading. Understanding the evolution of reinforcement stress and strain provides insight into the load transfer mechanism between concrete and reinforcing steel from the elastic stage to yielding and plastic deformation. This study aims to investigate the stress and strain distribution of longitudinal reinforcement in reinforced concrete beams using the Finite Element Method (FEM) implemented in ABAQUS 2024. A three-dimensional beam model with dimensions of 200 × 300 × 3000 mm was developed using concrete with a compressive strength of <strong>25 MPa</strong>, D16 longitudinal reinforcement with a yield strength of <strong>420 MPa</strong>, and Ø10 stirrups with a yield strength of <strong>280 MPa</strong><strong>.</strong> Concrete was modeled using the <strong>Concrete Damaged Plasticity (CDP)</strong> model with the compressive stress–strain relationship based on the <strong>Saenz (1964)</strong> constitutive model, while the reinforcing steel was modeled as an elastic–plastic material. The analysis was conducted under displacement-controlled loading of <strong>6.405 mm</strong><strong>, 50 mm</strong>, and <strong>100 mm</strong>. The numerical results show that increasing displacement leads to a progressive increase in stress and strain in the longitudinal reinforcement, indicating the transition from the elastic stage to yielding and plastic behavior. The maximum reinforcement stress reached <strong>421.74 MPa</strong>, while the maximum strain reached <strong>0.056</strong>. The concrete compressive stress increased to <strong>39.20 MPa</strong>, indicating nonlinear material behavior beyond the design compressive strength. The numerical model was validated against manual calculations, yielding an agreement of approximately <strong>97.96%</strong>, demonstrating the reliability of the proposed finite element model. These results confirm that ABAQUS is capable of accurately predicting the stress and strain distribution of reinforcing steel and can be effectively applied to evaluate the mechanical behavior of reinforced concrete beams.</span></p> 2026-11-03T15:45:17+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23247 PENGARUH PENAMBAHAN ASBUTON BUTIR B5/20 PADA CAMPURAN AC-WC MATERIAL RAP (RECLAIMED ASPHALT PAVEMENT) 2026-11-04T11:07:53+07:00 Yohanes Ola Mali yohanesolamali2001@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The increasing deterioration of road pavements has led to a growing demand for pavement materials, highlighting the need for more economical and environmentally friendly alternatives. One potential solution is the utilization of Reclaimed Asphalt Pavement (RAP) as a recycled material combined with the addition of Buton Granular Asphalt B5/20 to improve the characteristics of Asphalt Concrete-Wearing Course (AC-WC) mixtures. This study aimed to analyze the effect of adding Buton Granular Asphalt B5/20 to AC-WC mixtures containing RAP on their Marshall characteristics. The research was conducted experimentally at the Construction Materials Laboratory, National Institute of Technology (ITN) Malang. The materials used consisted of RAP, additional aggregates, 60/70 penetration grade asphalt, and Buton Granular Asphalt B5/20. The testing program included material property evaluation, aggregate gradation design, Marshall specimen preparation, and Marshall testing to determine stability, flow, Void in Mix (VIM), Void in Mineral Aggregate (VMA), Void Filled with Asphalt (VFA), Marshall Quotient (MQ), and density. The test results were analyzed using regression analysis, correlation analysis, coefficient of determination, and hypothesis testing. The results are expected to demonstrate the effect of Buton Granular Asphalt B5/20 on the Marshall characteristics of RAP-based AC-WC mixtures and to identify the optimum addition level that provides the best mixture performance in accordance with the 2018 Bina Marga General Specifications. The utilization of RAP and Buton Granular Asphalt B5/20 is expected to provide an alternative pavement material that improves pavement quality while promoting resource efficiency and environmental sustainability.</em></p> 2026-11-03T15:59:52+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23246 PENGGUNAAN KARANG KOTA KUPANG DENGAN PENAMBAHAN BAN BEKAS PADA CAMPURAN ASPAL AC-WC TERHADAP KARAKTERISTIK MARSHALL 2026-11-04T11:08:09+07:00 Carlo C.A.S. Fernandez fzbrother15@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Keywords" style="text-align: justify; text-justify: inter-ideograph; margin: 0in -.1pt 6.0pt 0in;"><em><span lang="EN-GB">Kupang City has abundant local coral stone resources; however, their utilization as aggregate in road pavement construction remains limited, resulting in the continued use of construction materials sourced from outside the region. This study aims to analyze the characteristics of local coral stone aggregate from Kupang City and determine the Optimum Asphalt Content (OAC) for an Asphalt Concrete-Wearing Course (AC-WC) mixture with the addition of waste tire rubber powder using the Marshall method. The study employed 60/70 penetration grade asphalt in accordance with the 2018 Bina Marga General Specifications. The research procedures included aggregate characterization testing, mix design, determination of the optimum asphalt content, and evaluation of Marshall parameters. The test results indicated that the local coral stone aggregate met the required specifications for use as an AC-WC mixture component. The optimum asphalt content obtained was <strong>5.24%</strong>, with Marshall characteristics consisting of a stability value of <strong>1084.29 kg</strong>, a flow value of <strong>3.03 mm</strong>, Voids in Mix (VIM) of <strong>4.47%</strong>, Voids in Mineral Aggregate (VMA) of <strong>17.34%</strong>, Marshall Quotient (MQ) of <strong>357.77 kg/mm</strong>, and Voids Filled with Asphalt (VFA) of <strong>68.49%</strong>, all of which satisfied the requirements of the 2018 Bina Marga General Specifications. The results demonstrate that the use of local coral stone with the addition of waste tire rubber powder has the potential to serve as an alternative road pavement material that meets technical requirements, supports the utilization of local resources, and contributes to reducing waste tire pollution.</span></em></p> 2026-11-03T16:06:11+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23244 PEMODELAN 3D BUILDING INFROMATION MODELLING (BIM) PADA STRUKTUR ATAS JEMBATAN RANGKA LAMANDAU KALIMANTAN TENGAH 2026-11-04T11:08:24+07:00 Nurul Berlian Oktaviani berlian.nurul12@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The implementation of Building Information Modelling (BIM) has become a driving force in the digital transformation of the modern construction industry by overcoming the limitations of conventional two-dimensional (2D) drawings and manual calculations. This study aims to develop a 3D model of the upper structure of the 65-meter Lamandau Truss Bridge in Central Kalimantan using Tekla Structures 2025 at Level of Development (LOD) 350 and to generate material quantity information through Quantity Take-Off (QTO) analysis. The research employed a descriptive quantitative method using secondary data in the form of the project's as-built drawings. The results indicate that the 3D parametric model successfully reconstructed all major bridge components, including the main girders, cross girders, stringers, bracing system, composite bridge deck, connections, bolts, and elastomeric bearings. In addition to providing an integrated visualization of the bridge structure, the BIM model automatically extracted material quantity data through the Report feature, producing detailed information on the volume and weight of each structural component. Therefore, the implementation of 3D BIM using Tekla Structures 2025 provides an informative digital model that serves as as-built documentation and supports the preparation of material quantity data for bridge construction projects.</p> 2026-11-03T16:09:54+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23243 PENGEMBANGAN MODEL INFORMASI DIGITAL PADA STRUKTUR JEMBATAN RANGKA BAJA MELALUI PENERAPAN BIM 3D 2026-11-04T11:08:33+07:00 Rambu Bintang Rahmadani 2221027@scholar.itn.ac.id Ratri Andinisari aratri@lecturer.itn.ac.id <p>Digital transformation from conventional 2D methods to an integrated approach is crucial to minimize design errors and material quantity discrepancies in bridge projects. This study aims to comprehensively model the 3D structure of the PT. Sawit Lamandau Raya Bridge post-construction, analyze the visual coordination of elements, and automatically extract material volume quantities using Autodesk Revit's Quantity Take-Off (QTO) feature. A descriptive comparative methodology was applied through the stages of creating grids, leveling, inputting material parameters, modeling substructure and superstructure elements, and validating geometry. The results indicate that the 3D modeling successfully mapped critical bridge details precisely. The automated QTO process generated objective volume data and detected significant deviations compared to conventional methods. In reinforcement steel, the volume deviations for Bored Pile A 59.40% and Abutment A 55.13% were lower than the conventional method. In concrete volume, a striking deviation occurred in the open caisson foundation at 73.69%, while structural steel showed an a Bolt is 64,47%. These quantity differences were triggered by decimal rounding and the neglect of overlapping volumes in the conventional method. In conclusion, the BIM 3D Revit approach effectively provides transparent asset documentation and delivers superior volume calculation accuracy for bridge construction cost management.</p> 2026-11-03T16:16:06+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23232 PENGGUNAAN MATERIAL BATU ALAM LOKAL KABUPATEN ENDE PENAMBAHAN ABU SERBUK KAYU SEBAGAI FILLER ASPAL AC-WC 2026-11-04T11:08:43+07:00 Leonardus N.G.Tolan Leonardo076@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Roads are vital transportation infrastructure that connect regions and support economic activities. In Ende Regency, local natural stone has considerable potential to be used as an alternative aggregate in Asphalt Concrete-Wearing Course (AC-WC) mixtures, combined with the utilization of wood sawdust waste to improve mixture performance. The use of wood sawdust as asphalt filler not only has the potential to reduce dependence on conventional raw materials and minimize the environmental impacts of aggregate quarrying, but also provides an effective approach to managing biomass waste. This study aimed to evaluate the Marshall characteristics of AC-WC mixtures using local natural stone from Ende Regency with the addition of wood sawdust as filler. The research methodology followed the 2018 General Specifications of Bina Marga. The Marshall test results indicated that the Optimum Asphalt Content (OAC) was 5.65%. At this optimum asphalt content, the control mixture (0% wood sawdust) produced a stability value of 1123.31 kg, a flow value of 2.36 mm, a Voids in the Mix (VIM) value of 4.27%, a Voids in Mineral Aggregate (VMA) value of 15.85%, a Voids Filled with Asphalt (VFA) value of 69.94%, and a Marshall Quotient (MQ) value of 482.15 kg/mm. Furthermore, the effects of wood sawdust addition at proportions of 0%, 0.1%, 0.3%, 0.5%, and 0.7% were analyzed to evaluate their influence on the durability and performance of the AC-WC mixture.</p> 2026-11-03T18:01:27+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23231 ANALISIS NUMERIK DISTRIBUSI GAYA, TEGANGAN, DAN REGANGAN KABEL PADA JEMBATAN CABLE STAYED DENGAN BEBAN LAYAN 2026-11-04T11:09:00+07:00 Mariano bintang fabio bintangfabio1901@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Cable-stayed bridges are one of the most widely used bridge types for medium- to long-span applications due to their structural efficiency, high stiffness, and aesthetic appearance. In this structural system, stay cables act as the primary load-carrying elements that transfer loads from the girder to the pylon, making the distribution of cable forces a critical factor affecting the overall structural behavior. This study aims to analyze the distribution of cable force, stress, and strain in an H-pylon cable-stayed bridge under Service I and Strength I load combinations using MIDAS Civil software.</em></p> <p><em>The bridge model analyzed has a total span of 240 m, consisting of a single H-shaped pylon with a semi-fan cable arrangement. The initial cable pretension was determined through an iterative process under the Service I load combination until structural equilibrium was achieved. Subsequently, the cable responses under Service I and Strength I load combinations were evaluated. The results indicate that the cable force distribution under the Strength I load combination is greater than that under Service I, while maintaining a similar distribution pattern among all stay cables. The increase in cable force leads to corresponding increases in cable stress and strain, consistent with the principles of mechanics of materials. Furthermore, all calculated cable stresses remain below the allowable stress limit of 1116 MPa, and the corresponding strains remain within the elastic range. Therefore, the cable system satisfies the strength and safety requirements based on the Load and Resistance Factor Design (LRFD) method.</em></p> <p><em>&nbsp;</em></p> 2026-11-03T18:08:39+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23230 PENGARUH PENGGUNAAN MATERIAL BATU KALI LOKAL KABUPATEN BELU DENGAN PENAMBAHAN ABU SEKAM PADI SEBAGAI FILLER PADA CAMPURAN ASPAL AC- WC 2026-11-04T11:09:13+07:00 Benediktus O.S.S Seran bennftb@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The development of road infrastructure in Indonesia demands the efficient use of local materials to reduce production costs while maintaining pavement construction quality. Belu Regency, East Nusa Tenggara, possesses abundant local river stone deposits in the Talau River Quarry, which have not yet been optimally utilized for high-performance asphalt concrete mixtures. On the other hand, local agricultural waste in the form of rice husk ash ( ) is abundant and underutilized, despite containing high silica ( ) content and pozzolanic properties that make it a potential alternative filler material.This study aims to analyze the Marshall characteristics of Asphalt Concrete-Wearing Course ( ) mixtures utilizing local river stone aggregates from Belu Regency with the substitution of rice husk ash as a filler relative to the total aggregate weight. Laboratory testing was conducted based on the 2025 General Specifications of Directorate General of Highways (Bina Marga) using the Marshall test method to determine the Optimum Asphalt Content ( ) and evaluate mechanical parameters including Stability, Flow, Voids in Mix ( ), Voids in Mineral Aggregate ( ), Voids Filled with Asphalt ( ), and Marshall Quotient ( ). The rice husk ash substitution variations tested were 0%, 30%, 50%, 60%, and 90%. The findings of this study are expected to provide technical references for utilizing local materials and environmentally friendly agricultural waste in border region road</p> 2026-11-03T18:12:55+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23228 STUDI ANALISIS STRUKTUR GEDUNG RAWAT INAP POLIKLINIK RUMAH SAKIT RIZANI KECAMATAN PAITON PROBOLINGGO 2026-11-04T11:09:24+07:00 Lingga Novanda Ramadhani 2221072@sholar.itn.ac.id Ratri Andinisari aratri@lecturer.itn.ac.id <p>Population growth in Probolinggo Regency has increased the demand for adequate health facilities. Rizani Hospital in Paiton District requires the development of an inpatient polyclinic building to accommodate referred patients. As critical infrastructure, the building structure must be designed to remain operational after an earthquake. This study aims to plan the upper and lower structures of the building using a Special Moment Resisting Frame (SMRF) system in accordance with the latest SNI standards, as well as to analyze the seismic performance of the structure. The research methodology uses ETABS v.19 software for three-dimensional structural analysis, dynamic earthquake response spectrum lateral loads, and structural element modeling. The planning includes the dimensions of beams, columns, floor slabs, as well as the design of precast pile foundations and pile caps. The analysis results show that the structural element dimensions and seismic performance, including base shear control and story drift, meet technical requirements. The reinforcement of the upper structure and pile caps has been calculated to ensure high ductility. This study provides recommendations for safe and efficient structural planning for health facilities, with suggestions for the use of shear walls and consideration of dilatation in long buildings to enhance seismic resistance.</p> 2026-11-03T18:17:48+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23227 EVALUASI KINERJA ANGKUTAN UMUM BUS RAPID TRANSIT TRANS SEMANGGI SUROBOYO KORIDOR K2L 2026-11-04T11:09:34+07:00 Henny Puspitasari hennypuspitasari450@yahoo.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="SondirAbstractBody">This paper examines the operational quality and passenger satisfaction of the K2L corridor of BRT Trans Semanggi Suroboyo, which serves the Lidah Wetan-Kejawan Putih Tambak route. The corridor operates in mixed traffic and experiences uneven demand across time periods, conditions that may affect service regularity. Operational observations were conducted on nine round trips covering Tuesday, Thursday, and Saturday in the morning, midday, and afternoon. Seven performance variables were assessed using Decree No. SK.687/AJ.206/DRJD/2002, while fleet readiness, vehicle age, and estimated waiting time were treated as supporting indicators. Passenger perception was measured using a four-point Likert questionnaire derived from Regulation of the Minister for Administrative Reform No. 14/2017. One hundred respondents were proportionally distributed from 1,246 recorded passenger boardings and selected through accidental sampling. The findings indicate that only daily travel distance satisfied the reference value, at 230 km/day. Passenger productivity, fuel consumption, load factor, round-trip duration, headway, and operating speed remained below the applied benchmarks. The corridor recorded an overall load factor of 35.44%, an average round-trip time of 159 minutes, an average headway of 17.67 minutes, and an operating speed of 17.38 km/h. The Community Satisfaction Index was 78.25, classified as good, although schedule certainty, stop facilities, and complaint services still need attention.</p> 2026-11-03T18:22:25+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23226 INTEGRASI BIM 4D DAN METODE FAST TRACK UNTUK PENGENDALIAN WAKTU PROYEK PEMBANGUNAN GEDUNG MUHAMMADIYAH CENTER KABUPATEN BLITAR 2026-11-04T11:09:48+07:00 Muhamad Kurniawan Huda Febrian muhammadfebrian830@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The Muhammadiyah Center Building construction project is a construction project with a high level of complexity, requiring effective time control to ensure that project implementation proceeds according to schedule. Conventional time control methods still have limitations in visualizing the relationship between the project schedule and work progress. Therefore, this study implements four-dimensional Building Information Modeling (4D BIM) integrated with the Fast Track method to support project time control through construction sequence visualization and schedule acceleration of critical activities. This study aims to analyze project scheduling using the Precedence Diagram Method (PDM), implement 4D BIM by integrating a three-dimensional model with the project schedule using Autodesk Revit and Autodesk Navisworks, and evaluate the effectiveness of the Fast Track method in improving project duration and progress. The Fast Track method was applied by modifying the dependency relationships of several activities on the critical path from Finish-to-Start (FS) to Start-to-Start (SS), allowing activities to be performed simultaneously (overlapping) without changing the project scope. The results indicate that the implementation of 4D BIM provides a clearer visualization of construction sequences, thereby facilitating project monitoring and time control. The application of the Fast Track method successfully reduced the project duration from <strong>54 weeks to 48 weeks</strong>, resulting in a time reduction of <strong>6 weeks</strong> or approximately <strong>11.26%</strong>. In addition to shortening the project completion time, the 4D BIM simulation also demonstrated that the project progress under the Fast Track schedule was higher than that of the existing schedule during the observation period. Therefore, the integration of 4D BIM and the Fast Track method is considered effective in supporting time control for the Muhammadiyah Center Building construction project.</p> 2026-11-03T18:27:15+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23224 Pengembangan Dashboard Interaktif Microsoft Power BI untuk Monitoring Kinerja Proyek Menggunakan Earned Value Management 2026-11-04T11:10:04+07:00 Isma Herdian Putra ismaputra2208@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Project performance control requires information that can describe time and cost conditions in a timely and measurable manner. This study develops an interactive Microsoft Power BI dashboard based on Earned Value Management (EVM) to support performance monitoring of the Muhammadiyah Center Building Construction Project in Blitar Regency, particularly for structural works. A descriptive quantitative approach was employed using data consisting of the Budget Plan (RAB), working drawings, and project progress reports. Due to the limited availability of the baseline schedule and actual cost data, the planned schedule was reconstructed and Actual Cost (AC) was estimated. Performance evaluation was conducted using the parameters Planned Value (PV), Earned Value (EV), and Actual Cost (AC), along with the indicators SV, CV, SPI, CPI, and EAC. The analysis at week 24 resulted in an SPI of 1.04, indicating that project progress was ahead of the planned schedule, while a CPI of 0.99 indicated that cost efficiency was slightly below the ideal condition. The estimated final project cost based on EAC was IDR 8,297,650,960.00. The analysis results were then integrated into an interactive Microsoft Power BI dashboard that presents project performance information visually and in an integrated manner. The dashboard can assist users in monitoring time and cost conditions, identifying deviations, and obtaining supporting information for project control and decision-making.</em></p> 2026-11-03T18:36:52+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23223 PERENCANAAN DINDING PENAHAN SUNGAI KAYAN DI KAWASAN RENCANA ISLAMIC CENTER PROVINSI KALIMANTAN UTARA 2026-11-04T11:10:15+07:00 Kania Hannah Pradipta Dwi Oktaviany kaniaoktaviany99@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The Kayan River in Bulungan Regency, North Kalimantan Province, is experiencing active bank erosion that threatens the stability of the area planned for the Islamic Center development. Soil conditions dominated by clay and loose sand, combined with fluctuating river water levels between normal and flood conditions, reduce slope stability and pose a risk to the safety of the planned infrastructure. This study analyzes the geotechnical characteristics of the site soil, determines a suitable type and dimension of retaining wall structure, and prepares a construction cost estimate. A quantitative-descriptive method was used, processing secondary data from soil investigations (Standard Penetration Test and laboratory tests), manual calculation of lateral earth pressure and slope stability using the Simplified Bishop Method, and verification using GEO5 software referring to SNI 8460:2017. The analysis shows that the existing slope is unstable, with a safety factor of 0.78 manually and 0.89 using GEO5, so structural reinforcement is required. A 14 m long Corrugated Concrete Sheet Pile (CCSP) type W-600 A1000, reinforced with a VSL Y1030H26.5R-R prestressed bar anchor system, was selected as the bank retaining solution. Of three modeling scenarios evaluated, the third gave the most optimal result, with a global stability safety factor of 2.78 and an anchor internal safety factor of 1.56, both satisfying the minimum requirement of 1.50. The estimated construction cost for 700 m of retaining structure is IDR 30,234,552,359.20. The study concludes that the combination of CCSP and the anchor system is a safe, structurally stable, and economically feasible solution for handling bank erosion of the Kayan River.</p> 2026-11-03T18:43:56+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23222 ANALISA KINERJA LALU LINTAS TERHADAP KEBISINGAN SUARA (STUDI KASUS DI RUAS JALAN KALPATARU KOTA MALANG) 2026-11-04T11:10:27+07:00 Ahmad Harisudin harissudin69@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The continuous growth in vehicle volume can affect traffic performance and lead to increased noise levels in the environment surrounding the road. This study aims to analyze traffic performance, noise levels, and the relationship between traffic performance and noise levels on the Kalpataru Road segment in Malang City. Data collection was conducted over four days—Monday, Wednesday, Saturday, and Sunday—through surveys of traffic volume and vehicle speed, as well as noise level measurements. Traffic performance analysis was based on the 2023 Indonesian Road Capacity Manual (PKJI 2023), while the relationships between variables were analyzed using simple linear regression and the coefficient of determination (R²). The results indicate a peak traffic volume of 1,160 passenger car units per hour (pcu/h) against a road capacity of 1,990,2 pcu/h. The degree of saturation ranged from 0.29 to 0.58, while average travel speeds—calculated according to PKJI 2023—ranged from 27.07 to 29.18 km/h, placing the road's level of service in category C. Measured noise levels at the study site exceeded the noise quality standards for residential areas. Regression analysis results show that the relationship between vehicle volume and noise levels yielded R² values ​​ranging from 0.2455 to 0.6410, while the relationship between vehicle speed and noise levels yielded R² values ​​between 0.2421 and 0.6642. These findings demonstrate that both vehicle volume and speed influence noise levels, with the relationship tending to be stronger during certain observation periods.&nbsp;&nbsp;</p> 2026-11-03T18:49:11+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23220 ANALISIS KERUSAKAN JALAN DAN PENENTUAN PENANGANAN MENGGUNAKAN PROVINCIAL/KABUPATEN ROAD MANAGEMENT SYSTEM (PKRMS) 2026-11-04T11:10:40+07:00 Nurul Afni Hanifah hanipesek8@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>In an effort to improve road maintenance and management, a method is required to assess pavement conditions and determine appropriate road maintenance priorities. This study aims to evaluate the level of pavement distress and determine the type and priority of maintenance for six road sections in Pasuruan Regency using the <strong>Surface Distress Index (SDI)</strong><strong>, International Roughness Index (IRI),</strong> and <strong>Provincial/Kabupaten Road Management System (PKRMS)</strong><strong>.</strong> The data used in this study include road inventory data, road condition data, traffic volume data, and other supporting data. Road condition assessment was conducted for each <strong>100-meter segment</strong><strong>,</strong> and the collected data were analyzed based on SDI and IRI values and subsequently processed using the PKRMS. The results show that the six road sections have varying proportions of good and damaged pavement conditions. Based on the percentage of road length experiencing damage<strong>, Ketapan–Kedungbanteng</strong> has the highest proportion of damaged pavement at <strong>52.63%</strong><strong>,</strong> followed by <strong>Tampung Barat–Pejaten Kidul at 44.44%</strong><strong>, Jatigunting Barat–Karangsono at 23.53%, Kalisat–Kanduruan at 21.88%,</strong> and <strong>Bangil–Wonokerto and Genengwaru–Siyar at 7.69% each</strong><strong>.</strong> Based on the road condition assessment, maintenance priorities are determined according to the level of pavement distress, with maintenance consisting of <strong>routine and periodic maintenance</strong> as appropriate for the condition of each road section. The PKRMS analysis can subsequently be used as a basis for determining maintenance priorities and estimating the required road maintenance budget</em></p> 2026-11-03T19:01:58+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23219 ANALISIS FAKTOR-FAKTOR KETERLAMBATAN DISTRIBUSI MATERIAL PADA PROYEK KONSTRUKSI 2026-11-04T11:10:54+07:00 Reegan Elvreda Kaffa reegannkaffa@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Material distribution is a crucial activity in construction project execution, as it directly impacts the smooth flow of fieldwork. Delays in material distribution can disrupt project schedules, increase execution costs, and reduce work productivity. This study aims to identify the factors causing material distribution delays in the SPPG project in Ponorogo Regency and to determine the most dominant factor. A quantitative descriptive approach was employed, utilizing questionnaires distributed to respondents—including project managers, site engineers, supervisors, logistics staff, and other project personnel directly involved in material management. The research instrument was validated using the Pearson Product Moment validity test and the Cronbach's Alpha reliability test. Subsequently, the data were analyzed using the Relative Importance Index (RII) method. The results indicate that all indicators were valid, with calculated r-values ​​exceeding the critical r-table value (0.3388), and the instrument demonstrated very high reliability, with a Cronbach's Alpha value of 0.919. The RII analysis reveals that the most dominant factor causing material distribution delays was the unavailability of materials according to calculated requirements (RII = 0.900), followed by delays in material procurement (RII = 0.888) and discrepancies in the quantity of delivered materials (RII = 0.864).</em></p> 2026-11-03T19:06:08+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23218 PENGARUH UMUR DAN FAKTOR AIR SEMEN TERHADAP KUAT TEKAN BETON GEOPOLIMER BERBASIS FLY ASH 2026-11-04T11:11:06+07:00 Sergio Meo sergiomeo21@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>Geopolymer concrete is an innovative construction material developed as an alternative to conventional concrete by utilizing fly ash as a binder, thereby reducing the use of Portland cement and the carbon emissions generated during cement production. One of the factors affecting the properties of geopolymer concrete is the water-to-cementitious ratio (W/C), which influences both the workability and compressive strength of the concrete. This study aimed to analyze the effect of varying water-to-cementitious ratios on the compressive strength of fly ash-based geopolymer concrete. An experimental method was employed using fly ash as the precursor, an 8 M potassium hydroxide (KOH) solution, and sodium silicate (Na₂SiO₃) as alkaline activators, with water-to-cementitious ratio variations of 0.3, 0.4, 0.5, and 0.6. Prior to specimen preparation, material characterization tests were conducted to ensure that the constituent materials met the requirements for geopolymer concrete. Slump tests and compressive strength tests were then performed at the ages of 14, 21, and 28 days. The test results were analyzed using confidence interval analysis, polynomial regression analysis, and correlation analysis to determine the relationship between the water-to-cementitious ratio and the compressive strength of geopolymer concrete. The results indicated that the compressive strength of geopolymer concrete generally increased with curing age, with the highest compressive strength of 34.78 MPa obtained at a W/C ratio of 0.3 at 28 days, while the lowest compressive strength of 20.13 MPa was recorded at a W/C ratio of 0.6 at 14 days. Furthermore, increasing the water-to-cementitious ratio tended to reduce the compressive strength due to increased porosity, resulting in a less dense concrete structure. Therefore, both the water-to-cementitious ratio and curing age significantly influenced the compressive strength of fly ash-based geopolymer concrete, with a W/C ratio of 0.3 producing the optimum compressive strength and being recommended as the most effective mixture proportion in this study.</em></p> 2026-11-03T19:12:24+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23216 PENGARUH WATER-TO-CEMENTITIOUS RATIO TERHADAP KUAT TEKAN BETON GEOPOLIMER BERBASIS FLY ASH TIPE BERAKTIVATOR KOH-Na2SiO3 2026-11-04T11:11:20+07:00 Elfege Aprilio Ba Dia Tobong1 elfegeee5@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>The construction industry is one of the major contributors to carbon dioxide (CO₂) emissions due to the extensive use of Portland cement. Geopolymer concrete utilizing Type C fly ash has emerged as a sustainable alternative binder because it incorporates aluminosilicate-rich industrial by-products activated by alkaline solutions. This study investigated the effect of the water-to-cementitious ratio (W/C) on the compressive strength of Type C fly ash-based geopolymer concrete activated with potassium hydroxide (KOH) and sodium silicate (Na₂SiO₃). Four W/C ratios (0.30, 0.40, 0.50, and 0.60) were evaluated using cylindrical specimens measuring 100 × 200 mm. Compressive strength tests were conducted at curing ages of 14, 21, and 28 days in accordance with SNI 1974:2011. Preliminary material characterization included bulk density, sieve analysis, specific gravity, water absorption, moisture content, normal consistency, and setting time. The experimental data were analyzed using confidence interval, exponential regression, and correlation analyses. The results indicated that increasing the W/C ratio increased the slump value but decreased the compressive strength of geopolymer concrete at all curing ages. Conversely, lower W/C ratios produced higher compressive strength, with the highest value obtained at a W/C ratio of 0.30 and the lowest at 0.60. In addition, compressive strength consistently increased with curing age, indicating continuous strength development up to 28 days. These findings demonstrate that the water-to-cementitious ratio significantly influences the mechanical performance of Type C fly ash-based geopolymer concrete and should be carefully controlled to achieve optimum compressive strength.</p> 2026-11-03T19:18:35+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23214 “Penerapan Earned Value Method (EVM) untuk Evaluasi Kinerja Waktu dan Biaya: Studi Kasus Proyek Pembangunan RS Hermina Kepanjen” 2026-11-04T11:11:34+07:00 Rizal Tri Saputra Alwi rizalsaputra405@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p class="Abstract10"><em>Effective management of timelines and budgets is essential in construction to keep projects aligned with their initial baselines. By applying the Earned Value Method (EVM), this research assesses the financial and scheduling health of the Hermina Kepanjen Hospital construction in Malang Regency, while also projecting its ultimate cost and required time for completion. The research utilizes a quantitative case-study methodology, relying on secondary project records—specifically the Budget Plan, S-Curves, and weekly status reports up to the 16th week. The evaluation processes core EVM metrics—Planned Value (PV), Earned Value (EV), and Actual Cost (AC)—to calculate variances (SV, CV), performance indicators (SPI, CPI), the Critical Ratio (CR), and future projections including Estimate at Completion (EAC) and Estimate to Complete (ETC). Findings at the 16-week mark revealed a PV of IDR 56,226,788,040.00, an EV of IDR 44,837,459,880.00, and an AC of IDR 49,572,049,211.13. Consequently, the derived SPI (0.797), CPI (0.904), and CR (0.721) collectively signal that the project is facing both time delays and budget inefficiencies. Projections indicate that the final cost (EAC) will inflate to IDR 165,309,254,327.63, and the total project duration is expected to stretch to 235 days, exceeding the initial schedule by 25 days.</em></p> 2026-11-03T19:22:14+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23213 ANALISIS PERCEPATAN JADWAL PROYEK KONSTRUKSI MENGGUNAKAN METODE CRASHING PADA PROYEK RUMAH SAKIT HERMINA KEPANJEN 2026-11-04T11:11:46+07:00 Zabel Awalia 1921029.zabelawalia@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p><em>The New Building Construction Project of Hermina Kepanjen Hospital in Malang Regency, with a total building area of 1,596 </em><em>m<sup>2</sup></em><em> (6 floors), experienced a delay in physical progress from week 6 to week 10. By the end of week 10, the cumulative progress deviation reached -12.773%, requiring an effective schedule recovery strategy. This study aims to analyze the implementation of the crashing method by adding 3 hours of overtime daily (70% efficiency) on critical structural activities after week 10. The critical path was identified using the Critical Path Method (CPM). The analysis reveals that among 16 activities, 7 critical structural activities were targeted for crashing. The implementation reduced the normal duration of critical activities from 63 days to 51 days, achieving a time reduction of 12 days (19.05%). The direct cost increased by IDR 3,674.19 million or 23.98% over the total normal cost (from IDR 15,320.59 million to IDR 18,994.78 million). Based on the cost slope ranking, Column and Shear Wall 4th Floor had the lowest cost slope at IDR 174.17 million/day, making it the highest priority for compression</em><em>.</em></p> 2026-11-03T19:26:00+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR https://ejournal.itn.ac.id/gelagar/article/view/23182 ANALISA KERUSAKAN JALAN PADA RUAS JALAN KABUPATEN SUMBA BARAT PROVINSI NUSA TENGGARA TIMUR MENGGUNAKAN APLIKASI PROVINCIAL/KABUPATEN ROAD MANAGEMENT SYSTEM 2026-11-04T11:11:58+07:00 Hizkia Fydia Josanda kikiklw013@gmail.com Ratri Andinisari aratri@lecturer.itn.ac.id <p>Studi ini bertujuan untuk menganalisis kondisi perkerasan jalan pada ruas jalan Ombakareke – Lokory, Zalakadu - Manuku ku, Weepatola - Wee Tame, Sp. Ngihiwatu – Palamoko, Doka Kaka – Tarobo, Panoka&nbsp;–&nbsp;Mambang menggunakan metode <em>Surface Distress Index </em>(SDI) dan<em> International Roughness Index </em>(IRI) dan menggunakan program aplikasi <em>Provincial/Kabupaten Road Management System </em>(PKRMS). Hasil pengolahan data menggunakan program aplikasi PKRMS pada 6 ruas jalan yang dianalisis, didapatkan kondisi jalan mantap 28,78% dan kondisi jalan tidak mantap 71,22%. Dengan total anggaran biaya yang dianalisis sebesar Rp. 75.837.400.000.</p> 2026-11-03T19:30:01+07:00 Copyright (c) 2026 STUDENT JOURNAL GELAGAR