PRADESAIN PENGEMBANGAN TEMPAT PEMROSESAN AKHIR REGIONAL TALUMELITO KABUPATEN GORONTALO

  • Wahyu Ksatria Aditama Hadjarati Teknik Lingkungan S-1 Institut Teknologi Nasional Malang
  • Sudiro Teknik Lingkungan ITN Malang
  • Dwiratna Wulandari

Abstract

TPA Regional Talumelito is a final solid waste disposal place that has an operating system
using the Sanitary Landfill system which has been in operation since 2012 and has 4 cells to accommodate
the waste that enters the TPA. The source of the waste that goes to the TPA Regional Talumelito comes
from Gorontalo City, Gorontalo Regency and Bone Bolango Regency. The increasing volume of waste that
goes to the landfill causes a reduction in the capacity of the waste storage. The increase in population and
percentage of service area coverage and the potential for development land are also the reasons for the
need for additional TPA areas in the Talumelito Regional TPA. Therefore, a new cell is needed which aims
to help extend the operational life of the TPA in accommodating the volume of waste that enters the
Talumelito Regional TPA. After conducting a survey of waste generation in the service area of the
Talumelito Regional TPA using the SNI 19-3964-1994 method, a projected volume of waste that enters the
Talumelito Regional TPA for the next 10 years is projected to reach 368,966.98 tons. To be able to
accommodate the volume of incoming waste for up to 10 years, a landfill area of 1.66 ha is needed. The
available land area that can be used for additional cells at the Talumelito Regional TPA site is 5.5 ha.