[1]
AisiyahL. 2021. APPLICATION OF THE FAST TRACK METHOD TO ACCELERATE THE SCHEDULE: Case Study: Construction of Vocational Laboratory Building and Vocational Creative Industry Phase I Universitas Brawijaya. STUDENT JOURNAL GELAGAR. 2, 2 (Jan. 2021), 224-230.