AisiyahL. (2021). APPLICATION OF THE FAST TRACK METHOD TO ACCELERATE THE SCHEDULE: Case Study: Construction of Vocational Laboratory Building and Vocational Creative Industry Phase I Universitas Brawijaya. STUDENT JOURNAL GELAGAR, 2(2), 224-230. Retrieved from https://ejournal.itn.ac.id/index.php/gelagar/article/view/3009