AisiyahL. (2021) “APPLICATION OF THE FAST TRACK METHOD TO ACCELERATE THE SCHEDULE: Case Study: Construction of Vocational Laboratory Building and Vocational Creative Industry Phase I Universitas Brawijaya”, STUDENT JOURNAL GELAGAR, 2(2), pp. 224-230. Available at: https://ejournal.itn.ac.id/index.php/gelagar/article/view/3009 (Accessed: 16May2024).