Cahya ZulyamaD. H., Munasih and WijayaningtyasM. (2021) “PERCEPATAN WAKTU PELAKSANAAN DENGAN METODE TIME COST TRADE OFF (TCTO) : Studi Kasus : Proyek Preservasi Rehabilitasi Jalan Mantingan – Ngawi – Maospati – Ponorogo – Madiun – Caruban”, STUDENT JOURNAL GELAGAR, 3(1), pp. 159-165. Available at: https://ejournal.itn.ac.id/index.php/gelagar/article/view/3427 (Accessed: 28April2024).