[1]
AisiyahL., “APPLICATION OF THE FAST TRACK METHOD TO ACCELERATE THE SCHEDULE: Case Study: Construction of Vocational Laboratory Building and Vocational Creative Industry Phase I Universitas Brawijaya”, GELAGAR, vol. 2, no. 2, pp. 224-230, Jan. 2021.