[1]
Cahya ZulyamaD. H., Munasih, and WijayaningtyasM., “PERCEPATAN WAKTU PELAKSANAAN DENGAN METODE TIME COST TRADE OFF (TCTO) : Studi Kasus : Proyek Preservasi Rehabilitasi Jalan Mantingan – Ngawi – Maospati – Ponorogo – Madiun – Caruban”, GELAGAR, vol. 3, no. 1, pp. 159-165, Jun. 2021.