“Penerapan Earned Value Method (EVM) untuk Evaluasi Kinerja Waktu dan Biaya: Studi Kasus Proyek Pembangunan RS Hermina Kepanjen”
Abstract
Effective management of timelines and budgets is essential in construction to keep projects aligned with their initial baselines. By applying the Earned Value Method (EVM), this research assesses the financial and scheduling health of the Hermina Kepanjen Hospital construction in Malang Regency, while also projecting its ultimate cost and required time for completion. The research utilizes a quantitative case-study methodology, relying on secondary project records—specifically the Budget Plan, S-Curves, and weekly status reports up to the 16th week. The evaluation processes core EVM metrics—Planned Value (PV), Earned Value (EV), and Actual Cost (AC)—to calculate variances (SV, CV), performance indicators (SPI, CPI), the Critical Ratio (CR), and future projections including Estimate at Completion (EAC) and Estimate to Complete (ETC). Findings at the 16-week mark revealed a PV of IDR 56,226,788,040.00, an EV of IDR 44,837,459,880.00, and an AC of IDR 49,572,049,211.13. Consequently, the derived SPI (0.797), CPI (0.904), and CR (0.721) collectively signal that the project is facing both time delays and budget inefficiencies. Projections indicate that the final cost (EAC) will inflate to IDR 165,309,254,327.63, and the total project duration is expected to stretch to 235 days, exceeding the initial schedule by 25 days.