OPTIMALISASI BIAYA DAN KINERJA FUNGSI PADA PEMBANGUNAN GEDUNG ICU RSUD NGUDI WALUYO WLINGI-BLITAR MELALUI PENDEKATAN REKAYASA NILAI

  • Ferdian Wahyudianto
  • Ratri Andinisari ITN Malang

Abstract

The rapid development of the global construction industry has had a significant impact on the Indonesian economy. However, when doing construction work, cost savings are needed. Because there are so many incidents of waste of time and cost in construction projects, so these conditions need to be minimized. Based on these problems, it is necessary to apply value engineering to carry out a more economical planning strategy. The stages in the application of value engineering are information stage, creative/speculation stage, cost analysis stage, decision making based on Life Cycle Cost and AHP methods, recommendation stage, and presentation & follow-up stage. Based on research that has been conducted on the construction project of the ICU Building of Ngudi Waluyo Wlingi Hospital, Blitar Regency, there are selected work items that are applied Value Engineering, namely the work of doors, windows and partitions. Based on the results of Value Engineering, it was found that for the work of doors, windows and partitions, the amount of savings obtained was 21,46% or Rp 145.565.947,77 from Rp 678.227.531,00, resulting in Rp 532.661.583,23.

Downloads

Download data is not yet available.
Published
2026-10-30