ANALISIS WAKTU DAN BIAYA MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM)(STUDI KASUS: JALAN SIMPANG BATU-LABURAN)

  • Bagas Prayogo Ashari
  • Ratri Andinisari ITN Malang

Abstract

Project scheduling plays a crucial role in ensuring the effectiveness of construction project implementation, both in terms of time and cost. This study analyzes the duration and cost of the Simpang Batu-Laburan Road Improvement Project by comparing conventional (existing) scheduling with the Precedence Diagram Method (PDM). The analysis was conducted by calculating the total duration and cost for each method and the evaluating their efficiency. The results show that the existing schedule required 150 working days while rescheduling with PDM reduced the duration to 88 working days, achieving a time efficiency of 62 working days. However, the direct project cost increase form Rp17.702.184.000,00 to Rp17.972.343.000,00 due to adjustments in equipment coefficients and productivity improvement strategies. Despite the slight cost increase, the application of PDM proved effective in achieving significant time efficiency and supporting more optimal project execution. Therefore, this method is recommended for implementation from the planning stage, particularly for project with high complexity.

Downloads

Download data is not yet available.
Published
2026-10-30