PENGEMBANGAN SISTIM DISTRIBUSI AIR BERSIH PDAM DI KELURAHAN CEMORO KANDANG KOTA MALANG
Abstract
Based on existing conditions, the clean water service provided by the Malang City PDAM (Municipal Waterworks) already covers all five districts: Blimbing, Sukun, Klojen, Kedungkandang, and Lowokwaru. Data from the Central Statistics Agency (BPS) of Malang City in 2019 shows that the population of Kedungkandang District reached 194,341 people. However, from that number, only 35,054 people are served by the PDAM through 8,763 installed house connections (SR).This research was conducted through several main stages, beginning with concept formulation. This concept was then used as a basis for analyzing problems and as a guideline for planning the clean water system development. The method used is a combination of survey and descriptive methods with a case study approach.The long-term clean water demand projection was carried out using the exponential method, assuming a population growth rate of 0.033%. The projection results estimate that by 2030, the population to be served will reach 20,139 people, equivalent to 3,625 house connections. To meet this demand, a water discharge of 24.54 liters per second is required.Based on simulations using WaterCad V8i software, it was concluded that the optimal primary pipe network consists of a 150 mm diameter for Zone 1, a 125 mm diameter for Zone 2, and a 100 mm diameter for Zone 3.