PENGEMBANGAN MODEL INFORMASI DIGITAL PADA STRUKTUR JEMBATAN RANGKA BAJA MELALUI PENERAPAN BIM 3D
Abstrak
Digital transformation from conventional 2D methods to an integrated approach is crucial to minimize design errors and material quantity discrepancies in bridge projects. This study aims to comprehensively model the 3D structure of the PT. Sawit Lamandau Raya Bridge post-construction, analyze the visual coordination of elements, and automatically extract material volume quantities using Autodesk Revit's Quantity Take-Off (QTO) feature. A descriptive comparative methodology was applied through the stages of creating grids, leveling, inputting material parameters, modeling substructure and superstructure elements, and validating geometry. The results indicate that the 3D modeling successfully mapped critical bridge details precisely. The automated QTO process generated objective volume data and detected significant deviations compared to conventional methods. In reinforcement steel, the volume deviations for Bored Pile A 59.40% and Abutment A 55.13% were lower than the conventional method. In concrete volume, a striking deviation occurred in the open caisson foundation at 73.69%, while structural steel showed an a Bolt is 64,47%. These quantity differences were triggered by decimal rounding and the neglect of overlapping volumes in the conventional method. In conclusion, the BIM 3D Revit approach effectively provides transparent asset documentation and delivers superior volume calculation accuracy for bridge construction cost management.