PENGENDALIAN BANJIR DESA TEMPURSARI KECAMATAN WUNGU KABUPATEN MADIUN
Abstrak
Flooding that occurred in the Tempursari area, Wungu District, Madiun Regency occurred due to high rainfall, changes in land use into residential areas, and decreased capacity of existing drainage channels due to sedimentation. This study aims to analyze the planned flood discharge for a 10-year return period, evaluate the channel capacity, and re-plan the optimal channel dimensions. Through a hydrological and hydraulic approach, regional rainfall analysis was carried out using the Thiessen Polygon method and the E.J. Gumbel distribution, while the planned flood discharge was calculated using the Rational Method. The evaluation results showed that most of the existing channels, such as on Jl. Glonggong (left) (1) which only has a capacity of 0.135 m³/second, are unable to accommodate the planned flood discharge of 0.296 m³/second. As a solution, re-planning was carried out by enlarging the channel dimensions to 0.30 m x 0.45 m and replacing the old structural material with precast concrete (U-Ditch) so that the drainage system can function optimally in draining rainwater into the river