EVALUASI KIENRJA SIMPANG TIGA BERSINYAL DAN DAMPAK TERHADAP BIAYA OPERASIONAL KENDARAAN (BOK)
Abstrak
The signalized three-leg intersection of Gajah Mada Street, Raya Lengkong Street, and Raya Gemekan Street, Mojokerto Regency, experiences increasing traffic volumes, resulting in congestion, delays, and increased vehicle operating costs. This study aims to evaluate the intersection performance using the Indonesian Road Capacity Guidelines (PKJI) 2023 and Sidra Intersection 8.0 Software, determine the most effective intersection improvement alternative, analyze the relationship between delay and fuel consumption costs, and predict traffic conditions for the next five years. Primary data were obtained through traffic volume and geometric surveys of the intersection, while secondary data consisted of vehicle growth data and supporting references. The analysis of existing conditions showed a peak-hour traffic volume of 3417.25 PCU/h during 16:00–17:00 WIB, with an average delay of 124.65 sec/PCU based on PKJI 2023 and 165.1 sec/PCU based on Sidra Intersection 8.0, indicating Level of Service F. The best intersection improvement alternative was achieved by modifying the signal cycle length and phasing, resulting in a cycle length of 46 seconds. This alternative produced an average delay of 9.10 sec/PCU and improved the intersection performance to Level of Service B. Linear regression analysis showed a very strong relationship between delay and fuel consumption costs, with a correlation coefficient of 0.959. Traffic forecasting for the next five years indicates that intersection performance will deteriorate because traffic flow growth exceeds the available capacity, so the existing intersection capacity will no longer be able to accommodate the increasing traffic flow effectively, resulting in increased vehicle delay. Based on the analysis results, the selected intersection improvement alternative provides better intersection performance and can be recommended as an appropriate treatment for the study location.