“EVALUASI KINERJA ANGKUTAN UMUM DI TRAYEK GROGOT-PENAJAM PROVINSI KALIMANTAN TIMUR”
Abstrak
The physical construction of the Nusantara Capital City (IKN) has triggered a very rapid spatial transformation in Tanah Grogot, Paser Regency, making the route from Tanah Grogot to Penajam Paser Utara a strategic buffer corridor that supports logistics flows and population mobilization toward the Sepaku-Balikpapan toll road. However, this rapid spatial growth is not balanced by adequate transportation because the Grogot–Penajam route is dominated by an aging fleet over 30 years old. This study aims to evaluate the operational feasibility of public transportation through the operational performance analysis method of public transportation as stipulated by the Director General of Land Transportation No. 687/2002. The results of the analysis show that the fleet's operational performance indicators violate the standards set by the Directorate General of Land Transportation No. 687 of 2002, including critical headways (23–58 minutes), speeds of 55–57 km/h, long circulation times (7 hours 3 minutes–7 hours 18 minutes), and dwell times of 60 seconds. Although the daily average load factor appears ideal (71.05%–87.80%), an extreme load surge of 11–15 passengers occurs on vehicles with a capacity of 9 seats in certain segments, which deteriorates the cabin air circulation. In conclusion, the optimization strategy through travel time and circulation time engineering is proven to be ineffective in improving operational performance due to the geographical constraint of the route length reaching 136 km with a pure travel time of ±3 hours, thereby triggering long vehicle circulation times and departure schedule uncertainty.