OPTIMASI DAN ANALISIS RISIKO JADWAL PADA EFISIENSI WAKTU PELAKSANAAN PROYEK REKONSTRUKSI JALAN
Abstrak
This study analyzes time optimization and schedule delay risk in the Sawo–Gambiran road reconstruction project by integrating the Program Evaluation and Review Technique (PERT), work dependency relationships, and the S-Curve method. The research data were obtained from MC100 reports, planned S-Curve data, and three-time estimates collected from expert respondents. The revised results indicate that the predecessor relationships must follow field execution patterns that operate in a segmental parallel workflow. The revised critical path is K1–K5–K8–K7–K12–K11–K18, consisting of mobilization, ordinary excavation, Class B aggregate base course, Class A aggregate base course, asphalt binder course (AC-BC), asphalt wearing course (AC-WC), and thermoplastic road marking. The planned S-Curve shows project completion at week 26, while the PERT-based expected time S-Curve reaches 100% completion at week 24. Thus, there is a potential time efficiency of 2 weeks or 7.69% compared to the planned duration. The stone masonry work (K17) remains a high-risk activity due to its expected time and large weight contribution, although it is not part of the main critical path of pavement works. These findings confirm that project control should focus on critical activities, high-weight activities, and high-variance activities to minimize schedule deviation from the early stages.