EVALUASI RANCANGAN ANGGARAN BIAYA PADA PEMBANGUNAN GEDUNG EL. HOTEL BANYUWANGI
Abstrak
The development of the tourism sector in Banyuwangi has driven an increasing need for adequate accommodation facilities. One effort to fulfill this is through the construction of El Hotel Banyuwangi as a strategic project that provides modern lodging services. In its implementation, the budget plan plays a crucial role in ensuring the smooth and efficient running of the construction project. This study aims to compile a detailed and systematic budget plan based on existing technical drawings and work specifications. The methods used include the stages of collecting working drawing data, calculating work volumes based on Shop Drawings, selecting the Work Unit Price Analysis method, and using the Banyuwangi Regency Unit Price for the 2023 Fiscal Year. The cost estimate was prepared comprehensively with the help of Microsoft Excel and AutoCAD software, which speeds up the recapitulation process and minimizes the potential for manual errors. The calculation results show that the total construction cost of the El Hotel Banyuwangi building reached IDR 7.301.546.000, including structural and roof work and 11% VAT. With proper budget planning, this project is expected to become a model for efficient and accurate construction cost management, and contribute to encouraging the development of the tourism sector and the local economy. This research provides practical guidance for hotel project cost planning and strengthens the application of data- and technology-driven construction management.