PENERAPAN REKAYASA NILAI

Studi Kasus : Pembangunan Hotel Ubud Batu Malang 

  • Bella Sepira Teknik Sipil S1 Institut Teknologi Nasional Malang
  • Tiong Iskandar Teknik Sipil S1, Institut Teknologi Malang
  • Deviany Kartika Teknik Sipil S1, Institut Teknologi Malang

Abstract

In controlling costs, efforts can be made to realize the costs incurred in accordance with the implementation needs and not excessive, such as efforts to reduce costs, namely making savings without reducing quantity or quality. Therefore, in planning a construction must have a technique that has a large enough potential for success in controlling the cost of Value Engineering techniques which aim to identify and eliminate unnecessary costs, without changing functions. Value engineering is an application of a number of techniques to identify and streamline unnecessary costs. The results of the calculation analysis of each design alternative show that the selection of the foundation design with the Value Engineering analysis using the zero-one method obtained the best proposed design, namely using a pile foundation. Pile foundation after cost savings of Rp. 1,249,505,714 or 0.14% of the initial cost of the original foundation of Rp. 1,251,293,838

Downloads

Download data is not yet available.
Published
2021-01-06
How to Cite
SepiraB., IskandarT., & KartikaD. (2021). PENERAPAN REKAYASA NILAI : Studi Kasus : Pembangunan Hotel Ubud Batu Malang . STUDENT JOURNAL GELAGAR, 2(2), 318-326. Retrieved from https://ejournal.itn.ac.id/index.php/gelagar/article/view/3159